EP3315785 - AIR CONDITIONER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.06.2022 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 02.07.2021 | ||
Former | Grant of patent is intended Status updated on 12.04.2021 | ||
Former | Request for examination was made Status updated on 30.03.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | [2018/18] | Inventor(s) | 01 /
NA, Seon Uk 102-1304, 21, Yehyeon-ro 35beon-gil, Giheung-gu Yongin-si Gyeonggi-do / KR | 02 /
JUNG, Chang-Woo 8604-303, 76, Wellbeing town-ro 56beon-gil Yeongtong-gu, Suwon-si Gyeonggi-do / KR | 03 /
HONG, Jin Woo 127-2001, 363, Hyowon-ro, Yeongtong-gu, Suwon-si Gyeonggi-do / KR | 04 /
KIM, Kwon Jin 6107-1501, 76, Central town-ro, Yeongtong-gu Suwon-si Gyeonggi-do / KR | [2018/18] | Representative(s) | Walaski, Jan Filip, et al Venner Shipley LLP 200 Aldersgate London EC1A 4HD / GB | [2018/18] | Application number, filing date | 17196206.1 | 12.10.2017 | [2018/18] | Priority number, date | KR20160137929 | 21.10.2016 Original published format: KR 20160137929 | [2018/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3315785 | Date: | 02.05.2018 | Language: | EN | [2018/18] | Type: | B1 Patent specification | No.: | EP3315785 | Date: | 04.08.2021 | Language: | EN | [2021/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.04.2018 | Classification | IPC: | F04D17/04, F04D29/42, F04D29/66, F24F13/24, F24F1/00, F24F1/0057, F24F1/0025 | [2021/16] | CPC: |
F04D17/04 (EP,US);
F24F13/082 (KR);
F24F1/0025 (EP,CN,KR,US);
F24F13/08 (US);
F04D29/422 (EP,US);
F04D29/666 (EP,US);
F24F1/0057 (EP,KR,US);
F24F13/00 (CN);
F24F13/20 (KR);
F24F13/24 (EP,CN,KR,US);
F24F13/28 (CN);
F24F13/30 (CN);
|
Former IPC [2018/18] | F04D17/04, F04D29/42, F04D29/66, F24F13/24, F24F1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/18] | Title | German: | KLIMAANLAGE | [2018/18] | English: | AIR CONDITIONER | [2018/18] | French: | CLIMATISEUR | [2018/18] | Examination procedure | 12.10.2017 | Examination requested [2018/18] | 12.10.2017 | Date on which the examining division has become responsible | 03.08.2018 | Amendment by applicant (claims and/or description) | 13.04.2021 | Communication of intention to grant the patent | 28.06.2021 | Fee for grant paid | 28.06.2021 | Fee for publishing/printing paid | 28.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 06.05.2022 | No opposition filed within time limit [2022/28] | Fees paid | Renewal fee | 23.10.2019 | Renewal fee patent year 03 | 22.10.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.10.2017 | AL | 04.08.2021 | AT | 04.08.2021 | CY | 04.08.2021 | CZ | 04.08.2021 | DK | 04.08.2021 | EE | 04.08.2021 | ES | 04.08.2021 | FI | 04.08.2021 | HR | 04.08.2021 | LT | 04.08.2021 | LV | 04.08.2021 | MC | 04.08.2021 | MK | 04.08.2021 | NL | 04.08.2021 | PL | 04.08.2021 | RO | 04.08.2021 | RS | 04.08.2021 | SE | 04.08.2021 | SI | 04.08.2021 | SK | 04.08.2021 | SM | 04.08.2021 | TR | 04.08.2021 | IE | 12.10.2021 | LU | 12.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | FR | 31.10.2021 | LI | 31.10.2021 | BG | 04.11.2021 | GB | 04.11.2021 | NO | 04.11.2021 | GR | 05.11.2021 | IS | 04.12.2021 | PT | 06.12.2021 | [2024/29] |
Former [2024/22] | HU | 12.10.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
MK | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
IE | 12.10.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 04.11.2021 | ||
GB | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2023/30] | HU | 12.10.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
IE | 12.10.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 04.11.2021 | ||
GB | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2023/27] | HU | 12.10.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
IE | 12.10.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 04.11.2021 | ||
GB | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/48] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
IE | 12.10.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 04.11.2021 | ||
GB | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/47] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 04.11.2021 | ||
GB | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/41] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/37] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/36] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/35] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/33] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BE | 31.10.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/29] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/25] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/24] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/21] | AT | 04.08.2021 | |
DK | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/16] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/10] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/09] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
PT | 06.12.2021 | ||
Former [2022/08] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
Former [2022/07] | AT | 04.08.2021 | |
LT | 04.08.2021 | ||
NO | 04.11.2021 | Documents cited: | Search | [XI]GB1066053 (HOOVER LTD) [X] 1 * page 2, line 3 - line 8; figures 1-7 * * page 2, line 36 - line 51 * [I] 2-15; | [XI]US2005223732 (KIM JIN B [KR], et al) [X] 1 * figures 2, 3, 4 * [I] 2-15; | [XI]EP1780475 (MITSUBISHI ELECTRIC CORP [JP]) [X] 1 * abstract *[I] 2-15; | [XI]JP2012225573 (PANASONIC CORP) [X] 1 * figures 1-5 * [I] 2-15; | [XI]EP2902716 (DAIKIN IND LTD [JP]) [X] 1 * abstract * [I] 2-15 |