blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3311693

EP3311693 - HEIGHT-ADJUSTABLE FRAME WITH FOLDING LEG ELEMENTS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.08.2020
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  13.09.2019
FormerGrant of patent is intended
Status updated on  06.09.2019
FormerRequest for examination was made
Status updated on  12.08.2019
FormerGrant of patent is intended
Status updated on  01.04.2019
FormerRequest for examination was made
Status updated on  02.11.2018
FormerThe application has been published
Status updated on  23.03.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Vitra Patente AG
Klünenfeldstrasse 22
4127 Birsfelden / CH
[2018/17]
Inventor(s)01 / Keller, Stefan
Bergstrasse 27
79585 Steinen - Hofen / DE
02 / Schütt, Helmut
Hadthof 1
79379 Mülllheim - Hügelheim / DE
 [2018/17]
Representative(s)Latscha Schöllhorn Partner AG
Grellingerstrasse 60
4052 Basel / CH
[2019/42]
Former [2018/17]Latscha Schöllhorn Partner AG
Austrasse 24
4051 Basel / CH
Application number, filing date17197008.018.10.2017
[2018/17]
Priority number, dateEP2016019482020.10.2016         Original published format: EP 16194820
[2018/17]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3311693
Date:25.04.2018
Language:DE
[2018/17]
Type: B1 Patent specification 
No.:EP3311693
Date:16.10.2019
Language:DE
[2019/42]
Search report(s)(Supplementary) European search report - dispatched on:EP04.12.2017
ClassificationIPC:A47B3/08, A47B9/00
[2018/17]
CPC:
A47B3/0812 (EP,US); A47B9/14 (US); A47B3/08 (EP,US);
A47B9/00 (EP,US); A47B2003/0824 (EP,US); A47B2009/043 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/49]
Former [2018/17]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:HÖHENVERSTELLBARES GESTELL MIT KLAPPBAREN BEINELEMENTEN[2018/17]
English:HEIGHT-ADJUSTABLE FRAME WITH FOLDING LEG ELEMENTS[2018/17]
French:CHÂSSIS RÉGLABLE EN HAUTEUR COMPRENANT DES ÉLÉMENTS DE JAMBAGE RABATTABLES[2018/17]
Examination procedure23.10.2018Examination requested  [2018/49]
23.10.2018Date on which the examining division has become responsible
02.04.2019Communication of intention to grant the patent
05.08.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
05.08.2019Fee for grant paid
05.08.2019Fee for publishing/printing paid
05.09.2019Information about intention to grant a patent
05.09.2019Receipt of the translation of the claim(s)
Opposition(s)17.07.2020No opposition filed within time limit [2020/39]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.10.2017
AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MK16.10.2019
MT16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
IE18.10.2019
LU18.10.2019
BE31.10.2019
FR16.12.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
[2022/32]
Former [2022/27]HU18.10.2017
AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
IE18.10.2019
LU18.10.2019
BE31.10.2019
FR16.12.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/34]HU18.10.2017
AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE18.10.2019
LU18.10.2019
BE31.10.2019
FR16.12.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/32]HU18.10.2017
AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE18.10.2019
LU18.10.2019
BE31.10.2019
FR16.12.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/26]AL16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE18.10.2019
LU18.10.2019
BE31.10.2019
FR16.12.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/51]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE18.10.2019
LU18.10.2019
BE31.10.2019
FR16.12.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/49]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SK16.10.2019
SM16.10.2019
IE18.10.2019
LU18.10.2019
BE31.10.2019
FR16.12.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/46]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SK16.10.2019
SM16.10.2019
IE18.10.2019
LU18.10.2019
BE31.10.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/38]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SK16.10.2019
SM16.10.2019
LU18.10.2019
BE31.10.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/37]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SK16.10.2019
SM16.10.2019
LU18.10.2019
BE31.10.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/36]AL16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
LU18.10.2019
BG16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/35]AL16.10.2019
CZ16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
LU18.10.2019
BG16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/34]AL16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RS16.10.2019
BG16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/32]AL16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RS16.10.2019
BG16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/25]FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RS16.10.2019
BG16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/24]FI16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
BG16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/23]FI16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
BG16.01.2020
GR17.01.2020
PT17.02.2020
Former [2020/22]FI16.10.2019
LT16.10.2019
BG16.01.2020
PT17.02.2020
Documents cited:Search[A]JPS5745335U  (UNKNOWN) [A] 1 * the whole document *;
 [AD]EP2926688  (TIMOTION TECHNOLOGY CO LTD [TW], et al) [AD] 1* the whole document *;
 [A]EP2979579  (KONINK AHREND NV [NL]) [A] 1 * the whole document *
by applicantEP2926688
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.