blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3315690

EP3315690 - A FLOOR SUPPORT STRUCTURE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.07.2021
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  21.08.2020
FormerGrant of patent is intended
Status updated on  29.04.2020
FormerExamination is in progress
Status updated on  06.09.2019
FormerRequest for examination was made
Status updated on  02.11.2018
FormerThe application has been published
Status updated on  30.03.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Prästängen Sverige AB
Kylarvägen 7
541 34 Skövde / SE
[2018/18]
Inventor(s)01 / LJUNGQUIST, Stig-Åke
Bäckvägen 26
541 35 Skövde / SE
 [2018/18]
Representative(s)Zacco Sweden AB
P.O. Box 5581
Löjtnantsgatan 21
114 85 Stockholm / SE
[N/P]
Former [2018/18]Zacco Sweden AB
P.O. Box 5581
114 85 Stockholm / SE
Application number, filing date17198747.227.10.2017
[2018/18]
Priority number, dateSE2016005141328.10.2016         Original published format: SE 1651413
[2018/18]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3315690
Date:02.05.2018
Language:EN
[2018/18]
Type: B1 Patent specification 
No.:EP3315690
Date:23.09.2020
Language:EN
[2020/39]
Search report(s)(Supplementary) European search report - dispatched on:EP07.12.2017
ClassificationIPC:E04F15/024
[2018/18]
CPC:
E04F15/0247 (EP); E04F15/02044 (SE); E04B5/48 (SE);
E04F2015/02061 (SE); E04F2015/02127 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/49]
Former [2018/18]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BODENAUFLAGESTRUKTUR[2018/18]
English:A FLOOR SUPPORT STRUCTURE[2018/18]
French:STRUCTURE-SUPPORT DE PLANCHER[2018/18]
Examination procedure26.10.2018Amendment by applicant (claims and/or description)
26.10.2018Examination requested  [2018/49]
26.10.2018Date on which the examining division has become responsible
10.09.2019Despatch of a communication from the examining division (Time limit: M04)
09.01.2020Reply to a communication from the examining division
30.04.2020Communication of intention to grant the patent
17.08.2020Fee for grant paid
17.08.2020Fee for publishing/printing paid
17.08.2020Receipt of the translation of the claim(s)
Opposition(s)24.06.2021No opposition filed within time limit [2021/35]
Fees paidRenewal fee
24.10.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.10.2017
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
EE23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
MK23.09.2020
MT23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
TR23.09.2020
IE27.10.2020
LU27.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
[2022/33]
Former [2022/27]HU27.10.2017
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
EE23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
MT23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
TR23.09.2020
IE27.10.2020
LU27.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/48]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
IE27.10.2020
LU27.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/46]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
IE27.10.2020
LU27.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/37]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
LU27.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/36]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
LU27.10.2020
BE31.10.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/31]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SK23.09.2020
SM23.09.2020
LU27.10.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/28]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/25]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/22]CZ23.09.2020
EE23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RO23.09.2020
RS23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/21]HR23.09.2020
LT23.09.2020
LV23.09.2020
RS23.09.2020
BG23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/20]HR23.09.2020
LT23.09.2020
LV23.09.2020
RS23.09.2020
BG23.12.2020
GR24.12.2020
Former [2021/10]HR23.09.2020
LV23.09.2020
RS23.09.2020
BG23.12.2020
GR24.12.2020
Documents cited:Search[X]WO2011089239  (SUBFLOOR [DK], et al) [X] 1,2,6-11 * page 35, lines 12-25,27,30-35; figures 5-7 *;
 [A]WO2014086423  (BYGG OCH MILJÖTEKNIK GRANAB AB [SE]) [A] 1-11 * figures 1a,1b,1c *;
 [A]WO2011066854  (BYGG OCH MILJOETEKNIK GRANAB AB [SE], et al) [A] 1-11 * the whole document *;
 [A]EP2910707  (MERK TIMBER GMBH [DE]) [A] 1-11 * the whole document *;
 [A]US2011023385  (KNIGHT III STEPHEN J [US], et al) [A] 1-11 * the whole document *;
 [A]JP2003328539  (ENDO SHUJI) [A] 1-11 * the whole document *;
 [A]JP2011099293  (ENDO SHUJI) [A] 1-11 * the whole document *
ExaminationJPH09195484
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.