EP3301378 - HEAT EXCHANGER TUBE AND HEATING BOILER HAVING SUCH A HEAT EXCHANGER TUBE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.11.2021 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 27.11.2020 | ||
Former | Grant of patent is intended Status updated on 20.10.2020 | ||
Former | Request for examination was made Status updated on 12.10.2018 | ||
Former | The application has been published Status updated on 02.03.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Hoval Aktiengesellschaft Austrasse 70 9490 Vaduz / LI | [2018/14] | Inventor(s) | 01 /
Telian, Markus Walter Ziegelbachstrasse 69 6912 Hörbranz / AT | [2018/14] | Representative(s) | Zenz Patentanwälte Partnerschaft mbB Gutenbergstraße 39 45128 Essen / DE | [N/P] |
Former [2018/14] | Zenz Patentanwälte Partnerschaft mbB Rüttenscheider Straße 2 45128 Essen / DE | Application number, filing date | 17198940.3 | 23.07.2015 | [2018/14] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3301378 | Date: | 04.04.2018 | Language: | DE | [2018/14] | Type: | B1 Patent specification | No.: | EP3301378 | Date: | 30.12.2020 | Language: | DE | [2020/53] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.03.2018 | Classification | IPC: | F24H1/28, F24H8/00, F24H9/00, F28F1/40, F28F1/00, F24H1/20, F28F1/06 | [2018/14] | CPC: |
F24H1/205 (EP,US);
F22B9/02 (RU);
F24H1/282 (KR);
F28F1/40 (EP,CN,KR,US);
F24H1/00 (RU);
F24H1/28 (EP,US);
F24H8/00 (EP,CN,KR,US);
F24H9/0026 (EP,KR,US);
F24H9/0031 (EP,US);
F28D1/0206 (KR);
F28D7/103 (RU);
F28F1/006 (EP,US);
F28F1/025 (KR);
F28F1/06 (EP,US);
F28F1/105 (RU);
F28F13/06 (KR);
F28F13/12 (CN);
F28F21/082 (CN);
F28F21/084 (CN,KR);
F28F2210/10 (KR);
F28F2275/14 (CN);
Y02B30/00 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/46] |
Former [2018/14] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | WÄRMEÜBERTRAGERROHR UND HEIZKESSEL MIT EINEM SOLCHEN WÄRMEÜBERTRAGERROHR | [2018/14] | English: | HEAT EXCHANGER TUBE AND HEATING BOILER HAVING SUCH A HEAT EXCHANGER TUBE | [2018/14] | French: | TUYAU DE TRANSFERT DE CHALEUR ET CHAUDIÈRE DOTÉE D'UN TEL TUYAU DE TRANSFERT DE CHALEUR | [2018/14] | Examination procedure | 18.09.2018 | Amendment by applicant (claims and/or description) | 04.10.2018 | Examination requested [2018/46] | 04.10.2018 | Date on which the examining division has become responsible | 21.10.2020 | Communication of intention to grant the patent | 23.11.2020 | Fee for grant paid | 23.11.2020 | Fee for publishing/printing paid | 23.11.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP15178123.4 / EP3040638 | Opposition(s) | 01.10.2021 | No opposition filed within time limit [2021/49] | Fees paid | Renewal fee | 27.02.2018 | Renewal fee patent year 03 | 31.07.2018 | Renewal fee patent year 04 | 31.07.2019 | Renewal fee patent year 05 | 31.07.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 30.12.2020 | CY | 30.12.2020 | DK | 30.12.2020 | EE | 30.12.2020 | FI | 30.12.2020 | LT | 30.12.2020 | LV | 30.12.2020 | MC | 30.12.2020 | MK | 30.12.2020 | SE | 30.12.2020 | SI | 30.12.2020 | SM | 30.12.2020 | TR | 30.12.2020 | NO | 30.03.2021 | GR | 31.03.2021 | IS | 30.04.2021 | PT | 30.04.2021 | IE | 23.07.2021 | [2024/29] |
Former [2024/22] | AL | 30.12.2020 | |
CY | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
MK | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SM | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
IE | 23.07.2021 | ||
Former [2023/33] | AL | 30.12.2020 | |
CY | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SM | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
IE | 23.07.2021 | ||
Former [2023/30] | AL | 30.12.2020 | |
CY | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
IE | 23.07.2021 | ||
Former [2022/35] | AL | 30.12.2020 | |
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
IE | 23.07.2021 | ||
Former [2022/23] | AL | 30.12.2020 | |
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2022/18] | AL | 30.12.2020 | |
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2022/13] | AL | 30.12.2020 | |
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2022/10] | AL | 30.12.2020 | |
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
SE | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/49] | AL | 30.12.2020 | |
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
SE | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/45] | AL | 30.12.2020 | |
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
SE | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/42] | EE | 30.12.2020 | |
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
SE | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/36] | EE | 30.12.2020 | |
FI | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
SE | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/33] | FI | 30.12.2020 | |
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
SE | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/23] | FI | 30.12.2020 | |
LV | 30.12.2020 | ||
SE | 30.12.2020 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
Former [2021/22] | FI | 30.12.2020 | |
NO | 30.03.2021 | ||
Former [2021/20] | FI | 30.12.2020 | Documents cited: | Search | [YD]EP0752088 (HOVAL INTERLIZ AG [LI]); | [I]US5839505 (LUDWIG RICHARD M [US], et al); | [Y]WO2015050441 (INTERGAS HEATING ASSETS BV [NL]); | [A]KR101521353B (SMI CO LTD [KR]) | by applicant | EP0752088 | EP2781873 |