EP3315904 - THICKNESS DETECTION EXPERIMENT PLATFORM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 05.07.2019 | ||
Former | Grant of patent is intended Status updated on 21.02.2019 | ||
Former | Request for examination was made Status updated on 09.11.2018 | ||
Former | The application has been published Status updated on 30.03.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Tyco Electronics (Shanghai) Co. Ltd. F/G Section, 1/F, Building 15 999 Yinglun Road Shanghai Guangdong / CN | For all designated states TE Connectivity Corporation 1050 Westlakes Drive Berwyn, PA 19312 / US | For all designated states Shenzhen AMI Technology Co. Ltd 1/F, H2 Building Hongfa Hi-tech Industrial Park Tangtou Boulevard Shiyan, Baoan District Shenzhen Guangdong 518108 / CN | [2019/16] |
Former [2018/18] | For all designated states Tyco Electronics (Shanghai) Co. Ltd. F/G Section, 1/F, Building 15 999 Yinglun Road Shanghai Guangdong / CN | ||
For all designated states TE Connectivity Corporation 1050 Westlakes Drive Berwyn, PA 19312 / US | |||
For all designated states Shenzhen AMI Technology Co. Ltd 1/F, H2 Building Honfa Hi-tech Industrial Park Tangtou Boulevard Shiyan, Baoan District Shenzhen Guangdong 518108 / CN | Inventor(s) | 01 /
ZHOU, Lei c/o Tyco Electronics (Shanghai) Co., Ltd. Building 5, No. 1528 Gumei Road Shanghai / CN | 02 /
ZHANG, Dandan c/o Tyco Electronics (Shanghai) Co., Ltd. Building 5, No. 1528 Gumei Road Shanghai / CN | 03 /
LU, Roberto Francisco-Yi Tyco Electronics (Shanghai) Co., Ltd. c/o Tyco Electronics (Shanghai) Co., Ltd. Building 5, No. 1528 Gumei Road Shanghai / CN | 04 /
ZENG, Qinglong Tyco Electronics (Shanghai) Co., Ltd. c/o Tyco Electronics (Shanghai) Co., Ltd. Building 5, No. 1528 Gumei Road Shanghai / CN | [2018/18] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2018/18] | Application number, filing date | 17198960.1 | 27.10.2017 | [2018/18] | Priority number, date | CN201610940078 | 31.10.2016 Original published format: CN201610940078 | [2018/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3315904 | Date: | 02.05.2018 | Language: | EN | [2018/18] | Type: | B1 Patent specification | No.: | EP3315904 | Date: | 07.08.2019 | Language: | EN | [2019/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.02.2018 | Classification | IPC: | G01B21/04, G01B11/06 | [2018/18] | CPC: |
G01B21/042 (EP,US);
G01B11/06 (CN,US);
G01B11/0691 (EP,US);
G05B19/401 (US);
G01B2210/44 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/50] |
Former [2018/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DICKENDETEKTIONSEXPERIMENTPLATTFORM | [2018/18] | English: | THICKNESS DETECTION EXPERIMENT PLATFORM | [2018/18] | French: | PLATE-FORME D'EXPÉRIMENTATION DE DÉTECTION D'ÉPAISSEUR | [2019/12] |
Former [2018/18] | PLATE-FORME D'EXPÉRIENCE DE DÉTECTION D'ÉPAISSEUR | Examination procedure | 02.11.2018 | Amendment by applicant (claims and/or description) | 02.11.2018 | Examination requested [2018/50] | 02.11.2018 | Date on which the examining division has become responsible | 22.02.2019 | Communication of intention to grant the patent | 25.06.2019 | Fee for grant paid | 25.06.2019 | Fee for publishing/printing paid | 25.06.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.10.2017 | AL | 07.08.2019 | AT | 07.08.2019 | CY | 07.08.2019 | CZ | 07.08.2019 | DK | 07.08.2019 | EE | 07.08.2019 | ES | 07.08.2019 | FI | 07.08.2019 | HR | 07.08.2019 | IT | 07.08.2019 | LT | 07.08.2019 | LV | 07.08.2019 | MC | 07.08.2019 | MK | 07.08.2019 | MT | 07.08.2019 | NL | 07.08.2019 | PL | 07.08.2019 | RO | 07.08.2019 | RS | 07.08.2019 | SE | 07.08.2019 | SI | 07.08.2019 | SK | 07.08.2019 | SM | 07.08.2019 | TR | 07.08.2019 | LU | 27.10.2019 | BE | 31.10.2019 | BG | 07.11.2019 | NO | 07.11.2019 | GR | 08.11.2019 | IS | 07.12.2019 | PT | 09.12.2019 | [2022/32] |
Former [2021/34] | HU | 27.10.2017 | |
AL | 07.08.2019 | ||
AT | 07.08.2019 | ||
CY | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
MT | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
LU | 27.10.2019 | ||
BE | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2021/33] | HU | 27.10.2017 | |
AL | 07.08.2019 | ||
AT | 07.08.2019 | ||
CY | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
LU | 27.10.2019 | ||
BE | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2021/26] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CY | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
LU | 27.10.2019 | ||
BE | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/37] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
LU | 27.10.2019 | ||
BE | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/36] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
LU | 27.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/35] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
LU | 27.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/27] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
IT | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/22] | AL | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/17] | AL | 07.08.2019 | |
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/15] | AL | 07.08.2019 | |
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/12] | ES | 07.08.2019 | |
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/10] | FI | 07.08.2019 | |
LT | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
PT | 09.12.2019 | ||
Former [2020/09] | FI | 07.08.2019 | |
LT | 07.08.2019 | ||
NL | 07.08.2019 | ||
NO | 07.11.2019 | ||
Former [2020/08] | LT | 07.08.2019 | |
NO | 07.11.2019 | Documents cited: | Search | [A]JP2002131044 (MEISAN KK) [A] 6-10 * abstract ** paragraphs [0015] - [0019] *; | [XI]WO2014071430 (TRUMPF MASCHINEN AUSTRIA GMBH [AT]) [X] 1-5 * abstract * * page 9, lines 2-6,28-31 * [I] 6-10 |