blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3480671

EP3480671 - PRODUCTION SYSTEM AND METHOD FOR OPERATING A NUMERICALLY CONTROLLED PRODUCTION SYSTEM [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  13.03.2020
Database last updated on 20.07.2024
FormerThe application has been published
Status updated on  05.04.2019
Most recent event   Tooltip13.03.2020Application deemed to be withdrawnpublished on 15.04.2020  [2020/16]
Applicant(s)For all designated states
Siemens Aktiengesellschaft
Werner-von-Siemens-Straße 1
80333 München / DE
[2019/19]
Inventor(s)01 / Pitz, Thomas
Schellingstr. 20
71277 Rutesheim / DE
02 / Spielmann, Ralf
Robert-Leicht-Str. 157A
70569 Stuttgart / DE
 [2019/19]
Application number, filing date17199665.502.11.2017
[2019/19]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3480671
Date:08.05.2019
Language:DE
[2019/19]
Search report(s)(Supplementary) European search report - dispatched on:EP24.04.2018
ClassificationIPC:G05B19/408, B23Q15/10
[2019/19]
CPC:
B23Q15/10 (EP,US); G05B19/408 (EP,US); G05B19/4155 (US);
G05B2219/34095 (EP,US); G05B2219/34101 (EP,US); G05B2219/35386 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/19]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN ZUM BETRIEB EINER NUMERISCH GESTEUERTEN PRODUKTIONSANLAGE SOWIE PRODUKTIONSANLAGE DAZU[2019/19]
English:PRODUCTION SYSTEM AND METHOD FOR OPERATING A NUMERICALLY CONTROLLED PRODUCTION SYSTEM[2019/19]
French:PROCÉDÉ DE FONCTIONNEMENT D'UNE INSTALLATION DE PRODUCTION À COMMANDE NUMÉRIQUE AINSI QU'INSTALLATION DE PRODUCTION CORRESPONDANTE[2019/19]
Examination procedure09.11.2019Application deemed to be withdrawn, date of legal effect  [2020/16]
29.11.2019Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2020/16]
Fees paidPenalty fee
Additional fee for renewal fee
30.11.201903   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US2004138776  (BAUMANN JOACHIM [DE], et al) [A] 1-7* paragraphs [0059] - [0068]; figures 2,6,7 *;
 [XI]US2006229761  (KITA YUKI [JP], et al) [X] 1,4,6,7 * paragraphs [0025] - [0048] - [0066]; figures 2-4 * [I] 2,3,5;
 [X]DE102015105436  (BECKHOFF AUTOMATION GMBH [DE]) [X] 1-7 * figures 1,2 * * paragraphs [0073] - [0075] - [0 94] - [0111] - [ 145] , [ 150] , [ 161] - [0172] *;
 [A]US2017075341  (NAGASHIMA NORITAKE [JP]) [A] 1-7 * paragraphs [0052] - [0081]; figures 5-10 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.