EP3489175 - TRANSPORT DEVICE IN THE FORM OF A LINEAR MOTOR WITH GUIDEWAY STATOR WITH TURNING SECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.01.2021 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 24.01.2020 | ||
Former | Grant of patent is intended Status updated on 28.08.2019 | ||
Former | Request for examination was made Status updated on 26.04.2019 | Most recent event Tooltip | 08.09.2023 | Lapse of the patent in a contracting state New state(s): SI | published on 11.10.2023 [2023/41] | Applicant(s) | For all designated states B&R Industrial Automation GmbH B&R Straße 1 5142 Eggelsberg / AT | [2019/22] | Inventor(s) | 01 /
Brucker, Michael Wieneröth 1 4890 Weißenkirchen i.A. / AT | 02 /
Huber, Stefan Steinerstraße 7/27 5020 Salzburg / AT | [2019/22] | Representative(s) | Patentanwälte Pinter & Weiss OG Prinz-Eugen-Straße 70 1040 Wien / AT | [2019/22] | Application number, filing date | 17203501.6 | 24.11.2017 | [2019/22] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3489175 | Date: | 29.05.2019 | Language: | DE | [2019/22] | Type: | B1 Patent specification | No.: | EP3489175 | Date: | 26.02.2020 | Language: | DE | [2020/09] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.05.2018 | Classification | IPC: | B65G54/02, B60L13/03 | [2019/22] | CPC: |
B65G54/02 (EP,US);
B60L13/03 (EP,US);
B65G47/248 (EP);
H02K41/02 (US);
B65G2811/0668 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/22] | Title | German: | TRANSPORTEINRICHTUNG IN FORM EINES LANGSTATORLINEARMOTORS MIT WENDEABSCHNITT | [2019/22] | English: | TRANSPORT DEVICE IN THE FORM OF A LINEAR MOTOR WITH GUIDEWAY STATOR WITH TURNING SECTION | [2019/22] | French: | DISPOSITIF DE TRANSPORT SOUS FORME D'UN MOTEUR LINÉAIRE À STATOR LONG DOTÉ D'UNE SECTION DE RETOURNEMENT | [2019/22] | Examination procedure | 21.09.2018 | Amendment by applicant (claims and/or description) | 21.09.2018 | Examination requested [2019/22] | 21.09.2018 | Date on which the examining division has become responsible | 29.08.2019 | Communication of intention to grant the patent | 12.12.2019 | Fee for grant paid | 12.12.2019 | Fee for publishing/printing paid | 12.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 27.11.2020 | No opposition filed within time limit [2021/05] | Fees paid | Renewal fee | 23.12.2019 | Renewal fee patent year 03 | Penalty fee | Additional fee for renewal fee | 30.11.2019 | 03   M06   Fee paid on   23.12.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.11.2017 | AL | 26.02.2020 | CY | 26.02.2020 | CZ | 26.02.2020 | DK | 26.02.2020 | EE | 26.02.2020 | ES | 26.02.2020 | FI | 26.02.2020 | HR | 26.02.2020 | LT | 26.02.2020 | LV | 26.02.2020 | MC | 26.02.2020 | MK | 26.02.2020 | MT | 26.02.2020 | NL | 26.02.2020 | PL | 26.02.2020 | RO | 26.02.2020 | RS | 26.02.2020 | SI | 26.02.2020 | SK | 26.02.2020 | SM | 26.02.2020 | TR | 26.02.2020 | BG | 26.05.2020 | NO | 26.05.2020 | GR | 27.05.2020 | IS | 26.06.2020 | PT | 19.07.2020 | IE | 24.11.2020 | LU | 24.11.2020 | [2023/41] |
Former [2022/33] | HU | 24.11.2017 | |
AL | 26.02.2020 | ||
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MK | 26.02.2020 | ||
MT | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
IE | 24.11.2020 | ||
LU | 24.11.2020 | ||
Former [2022/31] | HU | 24.11.2017 | |
AL | 26.02.2020 | ||
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MK | 26.02.2020 | ||
MT | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
IE | 24.11.2020 | ||
LU | 24.11.2020 | ||
Former [2022/30] | HU | 24.11.2017 | |
AL | 26.02.2020 | ||
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MT | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
IE | 24.11.2020 | ||
LU | 24.11.2020 | ||
Former [2022/27] | HU | 24.11.2017 | |
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MT | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
IE | 24.11.2020 | ||
LU | 24.11.2020 | ||
Former [2021/46] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
IE | 24.11.2020 | ||
LU | 24.11.2020 | ||
Former [2021/33] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
LU | 24.11.2020 | ||
Former [2021/31] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/14] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/50] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/49] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/48] | DK | 26.02.2020 | |
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/47] | DK | 26.02.2020 | |
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RS | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/45] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RS | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/40] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/39] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
Former [2020/38] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
Former [2020/37] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
NO | 26.05.2020 | ||
Former [2020/35] | FI | 26.02.2020 | |
NO | 26.05.2020 | Documents cited: | Search | [A]JPS6399701 (FUJITSU LTD, et al) [A] 1 * abstract *; | [A]DE19817099 (WOLF MONTAGE AUTOMATIONSANLAGE [DE]) [A] 1 * columns 1-5; figures 1,2 *; | [XY]EP3109998 (BERNECKER+RAINER INDUSTRIE-ELEKTRONIK GES MBH [AT]) [X] 1-6 * columns 1-20; figures 1-10 * [Y] 7,8; | [Y]EP3202611 (BERNECKER+RAINER INDUSTRIE-ELEKTRONIK GES MBH [AT]) [Y] 7,8 * columns 1-11; figures 1-4 *; | [A]EP3243772 (BERNECKER+RAINER INDUSTRIE-ELEKTRONIK GES MBH [AT]) [A] 1* columns 1-11; figures 1-7 * |