EP3333367 - ADDITIVE MANUFACTURED SEAL FOR INSERT COMPARTMENTALIZATION IN A TURBINE COMPONENT [Right-click to bookmark this link] | |||
Former [2018/24] | ADDITIVE MANUFACTURED SEAL FOR INSERT COMPARTMENTALIZATION | ||
[2021/01] | Status | No opposition filed within time limit Status updated on 08.04.2022 Database last updated on 12.08.2024 | |
Former | The patent has been granted Status updated on 30.04.2021 | ||
Former | Grant of patent is intended Status updated on 14.01.2021 | ||
Former | Examination is in progress Status updated on 25.06.2019 | ||
Former | Request for examination was made Status updated on 21.12.2018 | ||
Former | The application has been published Status updated on 11.05.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2021/22] |
Former [2018/24] | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
SNIDER, Zachary John 300 Garlington Road Greenville, SC South Carolina 29615 / US | 02 /
DUTTA, Sandip 300 Garlington Road Greenville, SC South Carolina 29615 / US | 03 /
HART, Kassy Moy 301 Feaster Road Greenville, SC South Carolina 29615 / US | [2018/24] | Representative(s) | BRP Renaud & Partner mbB Rechtsanwälte Patentanwälte Steuerberater Königstraße 28 70173 Stuttgart / DE | [2021/22] |
Former [2018/24] | Lee, Brenda GE International Inc. Global Patent Operation - Europe The Ark 201 Talgarth Road Hammersmith London W6 8BJ / GB | Application number, filing date | 17204881.1 | 01.12.2017 | [2018/24] | Priority number, date | US201615372642 | 08.12.2016 Original published format: US201615372642 | [2018/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3333367 | Date: | 13.06.2018 | Language: | EN | [2018/24] | Type: | B1 Patent specification | No.: | EP3333367 | Date: | 02.06.2021 | Language: | EN | [2021/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.03.2018 | Classification | IPC: | F01D5/18, F01D11/00, B22F3/105, F16J15/08 | [2018/24] | CPC: |
F01D11/003 (EP,US);
B22F5/009 (EP,US);
B22F5/04 (EP,US);
B33Y80/00 (EP,US);
F01D25/12 (US);
F01D5/18 (US);
F01D5/189 (EP,US);
F01D9/02 (US);
F16J15/0887 (US);
F16J15/0893 (US);
B22F10/28 (EP,US);
F05D2220/32 (US);
F05D2230/22 (EP,US);
F05D2230/234 (EP,US);
F05D2240/55 (EP,US);
F05D2250/75 (EP,US);
F05D2260/201 (EP,US);
F05D2260/30 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/04] |
Former [2018/24] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GENERATIV GEFERTIGTE DICHTUNG FÜR KAMMERBILDUNG AN EINEM EINSATZ IN EINER TURBINENKOMPONENTE | [2021/01] | English: | ADDITIVE MANUFACTURED SEAL FOR INSERT COMPARTMENTALIZATION IN A TURBINE COMPONENT | [2021/01] | French: | JOINT OBTENU PAR FABRICATION ADDITIVE POUR COMPARTIMENTATION CHEZ UN INSERT DANS UN COMPOSANT DE TURBINE | [2021/01] |
Former [2018/24] | GENERATIV GEFERTIGTE DICHTUNG FÜR KAMMERBILDUNG AN EINEM EINSATZ | ||
Former [2018/24] | ADDITIVE MANUFACTURED SEAL FOR INSERT COMPARTMENTALIZATION | ||
Former [2018/24] | JOINT OBTENU PAR FABRICATION ADDITIVE POUR COMPARTIMENTATION CHEZ UN INSERT | Examination procedure | 13.12.2018 | Amendment by applicant (claims and/or description) | 13.12.2018 | Examination requested [2019/04] | 13.12.2018 | Date on which the examining division has become responsible | 28.06.2019 | Despatch of a communication from the examining division (Time limit: M02) | 08.10.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 17.12.2019 | Reply to a communication from the examining division | 20.01.2020 | Despatch of a communication from the examining division (Time limit: M04) | 27.05.2020 | Reply to a communication from the examining division | 08.07.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.11.2020 | Reply to a communication from the examining division | 15.01.2021 | Communication of intention to grant the patent | 22.04.2021 | Fee for grant paid | 22.04.2021 | Fee for publishing/printing paid | 22.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 03.03.2022 | No opposition filed within time limit [2022/19] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 17.12.2019 | Request for further processing filed | 17.12.2019 | Full payment received (date of receipt of payment) Request granted | 07.01.2020 | Decision despatched | Fees paid | Renewal fee | 19.12.2019 | Renewal fee patent year 03 | 17.12.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.12.2017 | AL | 02.06.2021 | AT | 02.06.2021 | CY | 02.06.2021 | CZ | 02.06.2021 | DK | 02.06.2021 | EE | 02.06.2021 | ES | 02.06.2021 | FI | 02.06.2021 | HR | 02.06.2021 | IT | 02.06.2021 | LT | 02.06.2021 | LV | 02.06.2021 | MC | 02.06.2021 | MK | 02.06.2021 | NL | 02.06.2021 | PL | 02.06.2021 | RO | 02.06.2021 | RS | 02.06.2021 | SE | 02.06.2021 | SI | 02.06.2021 | SK | 02.06.2021 | SM | 02.06.2021 | TR | 02.06.2021 | BG | 02.09.2021 | NO | 02.09.2021 | GR | 03.09.2021 | IS | 02.10.2021 | PT | 04.10.2021 | GB | 01.12.2021 | IE | 01.12.2021 | LU | 01.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | FR | 31.12.2021 | LI | 31.12.2021 | [2024/29] |
Former [2024/22] | HU | 01.12.2017 | |
AL | 02.06.2021 | ||
AT | 02.06.2021 | ||
CY | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
MK | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
GB | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/30] | HU | 01.12.2017 | |
AL | 02.06.2021 | ||
AT | 02.06.2021 | ||
CY | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
GB | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/29] | HU | 01.12.2017 | |
AL | 02.06.2021 | ||
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
GB | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
GB | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
GB | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
BE | 31.12.2021 | ||
FR | 31.12.2021 | ||
Former [2022/48] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
GB | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
Former [2022/47] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
GB | 01.12.2021 | ||
LU | 01.12.2021 | ||
Former [2022/46] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
LU | 01.12.2021 | ||
Former [2022/36] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/33] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/29] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/26] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/21] | AT | 02.06.2021 | |
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/10] | AT | 02.06.2021 | |
CZ | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/09] | AT | 02.06.2021 | |
CZ | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
PT | 04.10.2021 | ||
Former [2022/08] | AT | 02.06.2021 | |
CZ | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2022/07] | AT | 02.06.2021 | |
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/52] | FI | 02.06.2021 | |
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
PL | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/51] | FI | 02.06.2021 | |
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/49] | FI | 02.06.2021 | |
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
SE | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/47] | FI | 02.06.2021 | |
LT | 02.06.2021 | ||
BG | 02.09.2021 | ||
Former [2021/46] | FI | 02.06.2021 | |
LT | 02.06.2021 | Documents cited: | Search | [X]US3767322 (DURGIN G, et al) [X] 1,3-7,9 * columns 3-6; figures 3-5 *; | [X]US3930748 (REDMAN ROBERT FREDERICK, et al) [X] 1,3,4,8,9 * figures 3-6 *; | [XY]EP1852572 (UNITED TECHNOLOGIES CORP [US]) [X] 1,3-5,9 * paragraphs [0018] - [0020] - [0025]; figure 7; claim 6 * [Y] 2,10; | [X]US2010068034 (SCHIAVO ANTHONY L [US], et al) [X] 1,3-7,9 * paragraph [0018]; figures 2,3 *; | [Y]EP2204537 (ROLLS ROYCE NORTH AMERICAN TEC [US]) [Y] 1,5,9 * figures 4-11 *; | [Y]US2010313419 (STAMPFLI MATTHIAS [CH], et al) [Y] 8 * paragraphs [0004] , [0005] , [0027] - [0030]; figures 2-10 *; | [XY]US8556578 (MEMMEN ROBERT L [US], et al) [X] 1,3,4,8,9 * columns 3,4; figures 4-9 * [Y] 5-7; | [Y]US8714565 (CORNETT KENNETH W [US], et al) [Y] 1,5-7,9 * figure 4 *; | [Y]EP2975217 (UNITED TECHNOLOGIES CORP [US]) [Y] 2,10* paragraphs [0039] - [0044]; figures 3-5 *; | [XY]EP3075531 (GEN ELECTRIC TECHNOLOGY GMBH [CH]) [X] 1,3-9 * paragraphs [0049] , [0050] , [0057] - [0064]; figures 1-10 * [Y] 2,8,10 |