blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3333731

EP3333731 - METHOD AND SYSTEM FOR CREATING AN INSTANCE MODEL [Right-click to bookmark this link]
StatusThe application has been refused
Status updated on  18.02.2022
Database last updated on 19.10.2024
FormerExamination is in progress
Status updated on  25.01.2020
FormerRequest for examination was made
Status updated on  21.12.2018
FormerThe application has been published
Status updated on  11.05.2018
Most recent event   Tooltip18.02.2022Refusal of applicationpublished on 23.03.2022  [2022/12]
Applicant(s)For all designated states
Tata Consultancy Services Limited
Nirmal Building 9th Floor Nariman Point Mumbai 400 021
Maharashtra / IN
[2018/24]
Inventor(s)01 / CHOUGULE, SANDEEP
Tata Consultancy Services Limited, Tata Research
Development & Design Centre
54-B, Hadapsar Industrial Estate
Hadapsar
411 013 Pune, Maharashtra / IN
02 / PATHAK, AMRISH SHASHIKANT
Tata Consultancy Services Limited, Tata Research
Development & Design Centre
54-B, Hadapsar Industrial Estate
Hadapsar
411 013 Pune, Maharashtra / IN
03 / KULKARNI, SHARMISHTHA PRAKASH
Tata Consultancy Services Limited, Tata Research
Development & Design Centre
54-B, Hadapsar Industrial Estate
Hadapsar
411 013 Pune, Maharashtra / IN
04 / KHANDELWAL, MANISH KAILASH
Tata Consultancy Services Limited, Tata Research
Development & Design Centre
54-B, Hadapsar Industrial Estate
Hadapsar
411 013 Pune, Maharashtra / IN
05 / KELKAR, RAHUL RAMESH
Tata Consultancy Services Limited, Tata Research
Development & Design Centre
54-B, Hadapsar Industrial Estate
Hadapsar
411 013 Pune, Maharashtra / IN
06 / VIN, HARRICK MAYANK
Tata Consultancy Services Limited, Tata Research
Development & Design Centre
54-B, Hadapsar Industrial Estate
Hadapsar
411 013 Pune, Maharashtra / IN
07 / AGGARWAL, NIKITA
Tata Consultancy Services Limited, Tata Research
Development & Design Centre
54-B, Hadapsar Industrial Estate
Hadapsar
411 013 Pune, Maharashtra / IN
 [2018/24]
Representative(s)Goddar, Heinz J.
Boehmert & Boehmert
Anwaltspartnerschaft mbB
Pettenkoferstrasse 22
80336 München / DE
[2018/24]
Application number, filing date17205674.906.12.2017
[2018/24]
Priority number, dateIN20162104186907.12.2016         Original published format: IN201621041869
[2018/24]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3333731
Date:13.06.2018
Language:EN
[2018/24]
Search report(s)(Supplementary) European search report - dispatched on:EP23.02.2018
ClassificationIPC:G06F17/30
[2018/24]
CPC:
G06F16/254 (EP,US); G06F16/288 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/04]
Former [2018/24]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN UND SYSTEM ZUR ERZEUGUNG EINES INSTANZMODELLS[2018/24]
English:METHOD AND SYSTEM FOR CREATING AN INSTANCE MODEL[2018/24]
French:PROCÉDÉ ET SYSTÈME DE CRÉATION D'UN MODÈLE D'INSTANCE[2018/24]
Examination procedure13.12.2018Amendment by applicant (claims and/or description)
13.12.2018Examination requested  [2019/04]
13.12.2018Date on which the examining division has become responsible
29.01.2020Despatch of a communication from the examining division (Time limit: M06)
07.08.2020Reply to a communication from the examining division
29.09.2021Cancellation of oral proceeding that was planned for 01.10.2021
01.10.2021Date of oral proceedings (cancelled)
02.11.2021Despatch of communication that the application is refused, reason: substantive examination [2022/12]
12.11.2021Application refused, date of legal effect [2022/12]
Fees paidRenewal fee
22.11.2019Renewal fee patent year 03
19.11.2020Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
31.12.202105   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US2005228808  (MAMOU JEAN-CLAUDE [US], et al) [X] 1-15 * See paragraphs: 004; 0017; 0021; 0026; 0029; 0046; 0050; 0054; 0194; 0200; 0207; 0212; 0219-0028; 0410; 0411; 0412; 0413; 0453; 0459; 0460; 0464; 0467; *;
 [I]US2014344211  (ALLAN DAVID [US], et al) [I] 1-15 * See paragraphs: 0007-0013; 0020-0022; 0058; 0060-0069; 0077; 0083; 0090; 0093; 0120-0126; 0140-0149; 0156-0209; 0216 *;
 [A]  - George Lumpkin, "Oracle8i Data Warehousing Guide", (19991231), URL: https://docs.oracle.com/cd/A87860_01/doc/server.817/a76994.pdf, (20180130), XP055445938 [A] 1-15 * page 151 - page 158 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.