EP3333349 - TILT AND TURN WINDOW FOR A BUILDING, HOME-AUTOMATION INSTALLATION COMPRISING SUCH A WINDOW AND OPERATING METHOD FOR CONTROLLING A MOTOR-BASED DRIVING DEVICE FOR SUCH A WINDOW [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.03.2023 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 08.04.2022 | ||
Former | Grant of patent is intended Status updated on 03.01.2022 | ||
Former | Request for examination was made Status updated on 07.12.2018 | ||
Former | The application has been published Status updated on 11.05.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC, TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states SOMFY ACTIVITES SA 50 Avenue du Nouveau Monde 74300 Cluses / FR | [2018/24] | Inventor(s) | 01 /
CAVAREC, Pierre-Emmanuel 189, chemin des Buttex 74130 Mont Saxonnex / FR | 02 /
SERVE, David 12, rue Hector Berlioz 85000 La Roche sur Yon / FR | [2018/24] | Representative(s) | Lavoix 62, rue de Bonnel 69448 Lyon Cedex 03 / FR | [2018/24] | Application number, filing date | 17205675.6 | 06.12.2017 | [2018/24] | Priority number, date | FR20160062071 | 07.12.2016 Original published format: FR 1662071 | [2018/24] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3333349 | Date: | 13.06.2018 | Language: | FR | [2018/24] | Type: | B1 Patent specification | No.: | EP3333349 | Date: | 11.05.2022 | Language: | FR | [2022/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.02.2018 | Classification | IPC: | E05F15/627, E05F11/10, E06B3/34 | [2018/24] | CPC: |
E05F11/10 (EP);
E05D15/524 (EP);
E05F15/627 (EP);
E06B3/341 (EP);
E05Y2201/412 (EP);
E05Y2201/434 (EP);
E05Y2201/646 (EP);
E05Y2201/654 (EP);
E05Y2600/412 (EP);
E05Y2900/148 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/02] |
Former [2018/24] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DREH-KIPPFENSTER FÜR EIN GEBÄUDE, HAUSANLAGE, DIE EIN SOLCHES DREH-KIPPFENSTER UMFASST, UND BETRIEBSSTEUERUNGSVERFAHREN EINER MOTORISIERTEN ANTRIEBSVORRICHTUNG FÜR EIN SOLCHES FENSTER | [2018/24] | English: | TILT AND TURN WINDOW FOR A BUILDING, HOME-AUTOMATION INSTALLATION COMPRISING SUCH A WINDOW AND OPERATING METHOD FOR CONTROLLING A MOTOR-BASED DRIVING DEVICE FOR SUCH A WINDOW | [2018/24] | French: | FENÊTRE OSCILLO-BATTANTE POUR UN BÂTIMENT, INSTALLATION DOMOTIQUE COMPRENANT UNE TELLE FENÊTRE ET PROCÉDÉ DE COMMANDE EN FONCTIONNEMENT D'UN DISPOSITIF D'ENTRAÎNEMENT MOTORISÉ D'UNE TELLE FENÊTRE | [2018/24] | Examination procedure | 03.12.2018 | Examination requested [2019/02] | 03.12.2018 | Date on which the examining division has become responsible | 06.12.2018 | Amendment by applicant (claims and/or description) | 04.01.2022 | Communication of intention to grant the patent | 31.03.2022 | Fee for grant paid | 31.03.2022 | Fee for publishing/printing paid | 31.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 14.02.2023 | No opposition filed within time limit [2023/16] | Fees paid | Renewal fee | 20.11.2019 | Renewal fee patent year 03 | 19.11.2020 | Renewal fee patent year 04 | 18.11.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.12.2017 | AL | 11.05.2022 | AT | 11.05.2022 | CY | 11.05.2022 | CZ | 11.05.2022 | DK | 11.05.2022 | EE | 11.05.2022 | ES | 11.05.2022 | FI | 11.05.2022 | HR | 11.05.2022 | IT | 11.05.2022 | LT | 11.05.2022 | LV | 11.05.2022 | MC | 11.05.2022 | MK | 11.05.2022 | NL | 11.05.2022 | PL | 11.05.2022 | RO | 11.05.2022 | RS | 11.05.2022 | SE | 11.05.2022 | SI | 11.05.2022 | SK | 11.05.2022 | SM | 11.05.2022 | TR | 11.05.2022 | BG | 11.08.2022 | NO | 11.08.2022 | GR | 12.08.2022 | IS | 11.09.2022 | PT | 12.09.2022 | GB | 06.12.2022 | IE | 06.12.2022 | LU | 06.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | [2024/29] |
Former [2024/27] | HU | 06.12.2017 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MK | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
GB | 06.12.2022 | ||
IE | 06.12.2022 | ||
LU | 06.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/21] | HU | 06.12.2017 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
GB | 06.12.2022 | ||
IE | 06.12.2022 | ||
LU | 06.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/18] | HU | 06.12.2017 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
GB | 06.12.2022 | ||
IE | 06.12.2022 | ||
LU | 06.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/11] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
GB | 06.12.2022 | ||
IE | 06.12.2022 | ||
LU | 06.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/49] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
GB | 06.12.2022 | ||
IE | 06.12.2022 | ||
LU | 06.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/48] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
GB | 06.12.2022 | ||
IE | 06.12.2022 | ||
LU | 06.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/47] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
GB | 06.12.2022 | ||
LU | 06.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/38] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
LU | 06.12.2022 | ||
Former [2023/25] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/17] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/09] | AT | 11.05.2022 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/07] | AT | 11.05.2022 | |
DK | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/51] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/50] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/49] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/48] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
LT | 11.05.2022 | ||
NL | 11.05.2022 | ||
SE | 11.05.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/47] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
LT | 11.05.2022 | ||
SE | 11.05.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | Documents cited: | Search | [XYI]US2007068082 (KAISER KONRAD [DE]) [X] 1-3,11,12,14,15 * the whole document * [Y] 7-9 [I] 4-6,10,13; | [Y]EP2508704 (ARNHOLD HANS [DE]) [Y] 7-9* the whole document * |