blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3332952

EP3332952 - REDUCING CNT RESISTIVITY BY ALIGNING CNT PARTICLES IN FILMS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.12.2022
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  24.12.2021
FormerGrant of patent is intended
Status updated on  10.08.2021
FormerRequest for examination was made
Status updated on  07.12.2018
FormerThe application has been published
Status updated on  11.05.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): MC
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Goodrich Corporation
4 Coliseum Centre
2730 West Tyvola Road
Charlotte, NC 28217-4578 / US
[2018/24]
Inventor(s)01 / HU, Jin
2567 Cedarwood Court
Hudson, OH Ohio 44236 / US
02 / BOTURA, Galdemir Cezar
1160 Lisa Ann Drive
Akron, OH Ohio 44313 / US
03 / SLANE, Casey
18015 Miller Road
Richwood, OH Ohio 43344 / US
04 / CHING, Nathaniel
11708 Geib Ave NE
Hartville, Ohio 44632 / US
 [2018/24]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2022/04]
Former [2018/24]de Bresser, Sara Jean
Dehns St Bride's House 10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date17205956.007.12.2017
[2018/24]
Priority number, dateUS20161537337108.12.2016         Original published format: US201615373371
[2018/24]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3332952
Date:13.06.2018
Language:EN
[2018/24]
Type: B1 Patent specification 
No.:EP3332952
Date:26.01.2022
Language:EN
[2022/04]
Search report(s)(Supplementary) European search report - dispatched on:EP04.05.2018
ClassificationIPC:B29C71/02, B29D7/01, C08J5/18, H05B3/14, H05B3/18, H05B3/36, // B29C35/02, B64D15/12, B29K105/16, B29K105/18
[2018/24]
CPC:
B29C71/02 (EP,US); C01B32/158 (BR); B29C71/0072 (US);
B29D7/01 (BR,US); C08J7/08 (EP,US); H05B3/145 (EP,US);
H05B3/36 (EP,US); B29C2035/0211 (EP,US); B29C35/0272 (EP,US);
B29K2105/167 (EP,US); B29K2105/18 (EP,US); B64D15/12 (EP,US);
C01B2202/22 (BR); C08J2300/22 (EP,US); H05B2214/04 (EP,US) (-)
C-Set:
B29C71/0081, B29C71/0081 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/02]
Former [2018/24]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERRINGERUNG VON CNT-WIDERSTAND DURCH AUSRICHTEN VON CNT-PARTIKELN IN FILMEN[2018/24]
English:REDUCING CNT RESISTIVITY BY ALIGNING CNT PARTICLES IN FILMS[2018/24]
French:RÉDUCTION DE LA RÉSISTIVITÉ DES NTC PAR ALIGNEMENT DE PARTICULES DE NTC DANS DES FILMS[2018/24]
Examination procedure04.12.2018Amendment by applicant (claims and/or description)
04.12.2018Examination requested  [2019/02]
04.12.2018Date on which the examining division has become responsible
11.08.2021Communication of intention to grant the patent
06.12.2021Fee for grant paid
06.12.2021Fee for publishing/printing paid
06.12.2021Receipt of the translation of the claim(s)
Opposition(s)27.10.2022No opposition filed within time limit [2023/01]
Fees paidRenewal fee
19.12.2019Renewal fee patent year 03
17.12.2020Renewal fee patent year 04
16.12.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.12.2017
AL26.01.2022
AT26.01.2022
CY26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
IT26.01.2022
LT26.01.2022
LV26.01.2022
MC26.01.2022
MK26.01.2022
NL26.01.2022
PL26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
[2024/29]
Former [2024/27]HU07.12.2017
AL26.01.2022
AT26.01.2022
CY26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
IT26.01.2022
LT26.01.2022
LV26.01.2022
MK26.01.2022
NL26.01.2022
PL26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2024/21]HU07.12.2017
AL26.01.2022
AT26.01.2022
CY26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
IT26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2024/18]HU07.12.2017
AL26.01.2022
AT26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
IT26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2023/35]AL26.01.2022
AT26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
IT26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2023/10]AL26.01.2022
AT26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2023/01]AL26.01.2022
AT26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/49]AT26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/48]AT26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/47]AT26.01.2022
DK26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/46]AT26.01.2022
DK26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RS26.01.2022
SE26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/42]AT26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RS26.01.2022
SE26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/39]AT26.01.2022
ES26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RS26.01.2022
SE26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
PT26.05.2022
Former [2022/36]AT26.01.2022
ES26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
NL26.01.2022
PL26.01.2022
RS26.01.2022
SE26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
PT26.05.2022
Former [2022/35]ES26.01.2022
HR26.01.2022
LT26.01.2022
NL26.01.2022
RS26.01.2022
SE26.01.2022
BG26.04.2022
NO26.04.2022
PT26.05.2022
Former [2022/34]ES26.01.2022
LT26.01.2022
NL26.01.2022
NO26.04.2022
PT26.05.2022
Former [2022/33]LT26.01.2022
NL26.01.2022
NO26.04.2022
Former [2022/30]NL26.01.2022
Documents cited:Search[A]DE102007051613  (SIEMENS AG [DE]) [A] 1 * paragraph [0001] * * paragraph [0009] - paragraph [0010] * * paragraph [0021] * * paragraph [0031] - paragraph [0032] ** figures 1,2,6-8 *;
 [A]US2011167781  (MAHESHWARI MAHENDRA [US]) [A] 1,10 * paragraph [0001] * * paragraph [0008] - paragraph [0010] * * paragraph [0023] - paragraph [0024] * * figure 2 *;
 [A]US2011180524  (BRITTINGHAM DAVID LOUIS [US], et al) [A] 1-10 * paragraph [0007] - paragraph [0008] * * paragraph [0041] * * paragraph [0043] - paragraph [0044] *;
 [A]US2013171406  (SUEHIRO JUNYA [JP], et al) [A] 1-10 * paragraph [0001] - paragraph [0004] * * paragraph [0014] - paragraph [0016] * * paragraph [0041] - paragraph [0048] * * paragraph [0053] * * paragraph [0055] - paragraph [0059]; figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.