EP3336262 - ARM ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.09.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 24.09.2021 | ||
Former | Grant of patent is intended Status updated on 07.06.2021 | ||
Former | Examination is in progress Status updated on 06.08.2020 | ||
Former | Request for examination was made Status updated on 12.10.2018 | ||
Former | The application has been published Status updated on 18.05.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states J.C. Bamford Excavators Limited Lakeside Works Uttoxeter Staffordshire ST14 5JP / GB | [2021/43] |
Former [2018/25] | For all designated states J.C. Bamford Excavators Limited Lakeside Works Rocester Uttoxeter Staffordshire ST14 5JP / GB | Inventor(s) | 01 /
PANNI, David J.C. Bamford Excavators Limited Lakeside Works Rocester Uttoxeter, Staffordshire ST14 5JP / GB | 02 /
SHENTON, Jamie J.C. Bamford Excavators Limited Lakeside Works Rocester Uttoxeter, Staffordshire ST14 5JP / GB | 03 /
SIEGLER, Niall J.C. Bamford Excavators Limited Lakeside Works Rocester Uttoxeter, Staffordshire ST14 5JP / GB | 04 /
WOOD, Luke J.C. Bamford Excavators Limited Lakeside Works Rocester Uttoxeter, Staffordshire ST14 5JP / GB | [2018/25] | Representative(s) | Anderson, Nicola Unity Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [N/P] |
Former [2021/43] | Ayre, Nicola Unity Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | ||
Former [2018/25] | Unsworth, Jennifer Mary Withers & Rogers LLP 4 More London Riverside London SE1 2AU / GB | Application number, filing date | 17206805.8 | 12.12.2017 | [2018/25] | Priority number, date | GB20160021521 | 16.12.2016 Original published format: GB 201621521 | [2018/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3336262 | Date: | 20.06.2018 | Language: | EN | [2018/25] | Type: | B1 Patent specification | No.: | EP3336262 | Date: | 27.10.2021 | Language: | EN | [2021/43] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.05.2018 | Classification | IPC: | E02F3/38, E02F3/32 | [2018/25] | CPC: |
E02F3/38 (EP,GB,US);
E02F3/369 (GB);
E02F3/32 (EP,US);
E02F9/14 (GB)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/46] |
Former [2018/25] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ARMANORDNUNG | [2018/25] | English: | ARM ASSEMBLY | [2018/25] | French: | ENSEMBLE DE BRAS | [2018/25] | Examination procedure | 04.10.2018 | Amendment by applicant (claims and/or description) | 04.10.2018 | Examination requested [2018/46] | 04.10.2018 | Date on which the examining division has become responsible | 05.08.2020 | Despatch of a communication from the examining division (Time limit: M04) | 14.12.2020 | Reply to a communication from the examining division | 08.06.2021 | Communication of intention to grant the patent | 17.09.2021 | Fee for grant paid | 17.09.2021 | Fee for publishing/printing paid | 17.09.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 28.07.2022 | No opposition filed within time limit [2022/40] | Fees paid | Renewal fee | 10.12.2019 | Renewal fee patent year 03 | 10.12.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.12.2017 | AL | 27.10.2021 | AT | 27.10.2021 | CY | 27.10.2021 | CZ | 27.10.2021 | DK | 27.10.2021 | EE | 27.10.2021 | ES | 27.10.2021 | FI | 27.10.2021 | HR | 27.10.2021 | LT | 27.10.2021 | LV | 27.10.2021 | MC | 27.10.2021 | MK | 27.10.2021 | MT | 27.10.2021 | NL | 27.10.2021 | PL | 27.10.2021 | RO | 27.10.2021 | RS | 27.10.2021 | SE | 27.10.2021 | SI | 27.10.2021 | SK | 27.10.2021 | SM | 27.10.2021 | IE | 12.12.2021 | LU | 12.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | BG | 27.01.2022 | NO | 27.01.2022 | GR | 28.01.2022 | IS | 27.02.2022 | PT | 28.02.2022 | [2024/41] |
Former [2024/22] | HU | 12.12.2017 | |
AL | 27.10.2021 | ||
AT | 27.10.2021 | ||
CY | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
MK | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 12.12.2021 | ||
LU | 12.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/30] | HU | 12.12.2017 | |
AL | 27.10.2021 | ||
AT | 27.10.2021 | ||
CY | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 12.12.2021 | ||
LU | 12.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/29] | HU | 12.12.2017 | |
AL | 27.10.2021 | ||
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 12.12.2021 | ||
LU | 12.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/03] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 12.12.2021 | ||
LU | 12.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/01] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 12.12.2021 | ||
LU | 12.12.2021 | ||
BE | 31.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/49] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 12.12.2021 | ||
LU | 12.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/48] | AT | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 12.12.2021 | ||
LU | 12.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/46] | AT | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
LU | 12.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/35] | AT | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/34] | AT | 27.10.2021 | |
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/33] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/25] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/24] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/23] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
PT | 28.02.2022 | ||
Former [2022/22] | AT | 27.10.2021 | |
FI | 27.10.2021 | ||
LT | 27.10.2021 | ||
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
Former [2022/21] | AT | 27.10.2021 | |
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
Former [2022/19] | BG | 27.01.2022 | Documents cited: | Search | [X]US3254780 (MIDTBO GUY R) [X] 1-5,11-13,15 * column 2, line 34 - column 3, line 7; figure - *; | [X]US3722864 (BORER H, et al) [X] 1-6,11-13,15 * column 1, lines 24-29; figure - ** column 2, line 44 - column 3, line 35 *; | [XD]GB2246111 (SAMSUNG HEAVY IND [KR]) [XD] 1,4-6,11-15 * the whole document *; | [X]EP1154081 (BAMFORD EXCAVATORS LTD [GB]) [X] 1,4,5,11-13,15 * paragraphs [0035] - [0040]; figure - *; | [X]JP2006022580 (CATERPILLAR MITSUBISHI LTD) [X] 1,4-11,14,15 * figure - *; | [X]EP1984574 (CNH BAUMASCHINEN GMBH [DE]) [X] 1-6,11,13-15 * paragraphs [0009] - [0011] - [0028]; figure -; claim 1 * |