blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3345732

EP3345732 - CUTTING STRUCTURE FOR ASSISTING THE CURVATURE OF A FLEXIBLE SHEET TO FORM A STEREOSCOPIC CONTOUR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.07.2021
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  14.08.2020
FormerGrant of patent is intended
Status updated on  15.04.2020
FormerExamination is in progress
Status updated on  25.06.2019
FormerRequest for examination was made
Status updated on  18.01.2019
FormerThe application has been published
Status updated on  08.06.2018
Most recent event   Tooltip16.06.2023Lapse of the patent in a contracting state
New state(s): NL
published on 19.07.2023  [2023/29]
Applicant(s)For all designated states
Hsu, Hwa-Yi
9F., No.35 Aikou 5th St.
30274 Zhubei City, Hsinchu County / TW
For all designated states
Tsai, Cheng-Yu
9F., No.35 aikou 5th St.
30274 Zhubei City, Hsinchu County / TW
[2018/28]
Inventor(s)01 / see applicant
...
 [2018/28]
Representative(s)Michalski Hüttermann & Partner Patentanwälte mbB
Kaistraße 16A
40221 Düsseldorf / DE
[N/P]
Former [2018/28]Michalski Hüttermann & Partner Patentanwälte mbB
Speditionstraße 21
40221 Düsseldorf / DE
Application number, filing date17207779.415.12.2017
[2018/28]
Priority number, dateTW20170200077U04.01.2017         Original published format: TW 106200077 U
[2018/28]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3345732
Date:11.07.2018
Language:EN
[2018/28]
Type: B1 Patent specification 
No.:EP3345732
Date:16.09.2020
Language:EN
[2020/38]
Search report(s)(Supplementary) European search report - dispatched on:EP13.06.2018
ClassificationIPC:B26F1/44, C14B5/02, B26F1/22
[2018/28]
CPC:
B26F1/44 (EP); B26F1/22 (EP); C14B5/02 (EP);
B26F2001/4472 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/08]
Former [2018/28]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SCHNEIDSTRUKTUR ZUR UNTERSTÜTZUNG DER KRÜMMUNG EINER FLEXIBLEN FOLIE ZUR HERSTELLUNG EINER STEREOSKOPISCHEN KONTUR[2018/28]
English:CUTTING STRUCTURE FOR ASSISTING THE CURVATURE OF A FLEXIBLE SHEET TO FORM A STEREOSCOPIC CONTOUR[2018/28]
French:STRUCTURE DE COUPE POUR AIDER LA COURBURE D'UNE FEUILLE FLEXIBLE À FORMER UN CONTOUR STÉRÉOSCOPIQUE[2018/28]
Examination procedure10.01.2019Examination requested  [2019/08]
10.01.2019Date on which the examining division has become responsible
28.06.2019Despatch of a communication from the examining division (Time limit: M04)
28.10.2019Reply to a communication from the examining division
16.04.2020Communication of intention to grant the patent
28.07.2020Receipt of the translation of the claim(s)
07.08.2020Fee for grant paid
07.08.2020Fee for publishing/printing paid
Opposition(s)17.06.2021No opposition filed within time limit [2021/34]
Fees paidRenewal fee
18.12.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.12.2017
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
NL23.09.2020
IE15.12.2020
LU15.12.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
IS16.01.2021
PT18.01.2021
[2023/29]
Former [2022/33]HU15.12.2017
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
IE15.12.2020
LU15.12.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
IS16.01.2021
PT18.01.2021
Former [2022/27]HU15.12.2017
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
IE15.12.2020
LU15.12.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
CH31.12.2020
LI31.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/52]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
IE15.12.2020
LU15.12.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
CH31.12.2020
LI31.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/46]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
IE15.12.2020
LU15.12.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/40]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/37]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/36]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/28]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/25]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/23]AT16.09.2020
CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/22]CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/21]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/20]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/10]FI16.09.2020
HR16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/09]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/08]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
Former [2021/07]FI16.09.2020
NO16.12.2020
Documents cited:Search[A]US5743164  (GUEZ ALLON [US]) [A] 1-10* abstract *;
 [A]US2004134250  (DURNEY MAX W [US], et al) [A] 1-10 * paragraph [0233]; figures 6,7,12,21 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.