blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3498592

EP3498592 - AIRPLANE [Right-click to bookmark this link]
Former [2019/25]A JUNCTION OF METAL/COMPOSITE STRUCTURES OF AN AIRPLANE
[2020/11]
StatusNo opposition filed within time limit
Status updated on  09.07.2021
Database last updated on 14.06.2024
FormerThe patent has been granted
Status updated on  31.07.2020
FormerGrant of patent is intended
Status updated on  22.03.2020
FormerRequest for examination was made
Status updated on  17.05.2019
Most recent event   Tooltip16.06.2023Lapse of the patent in a contracting state
New state(s): NL
published on 19.07.2023  [2023/29]
Applicant(s)For all designated states
FLARIS Spolka z ograniczona odpowiedzialnoscia
ul. Nad Stawami 2
58-560 Jelenia Gora / PL
[2019/25]
Inventor(s)01 / Ladzinski, Rafal
ul. Nad Stawami 1
58-560 Jelenia Gora / PL
 [2019/25]
Representative(s)Budzinski, Slawomir
JWP
Rzecznicy Patentowi Dorota Rzazewska sp.k.
Sienna Center
ul. Zelazna 28/30
00-833 Warszawa / PL
[2020/36]
Former [2019/25]Budzinski, Slawomir
JWP Rzecznicy Patentowi
Dorota Rzazewska sp.j.
Sienna Center
Ul. Zelazna 28/30
00-833 Warszawa / PL
Application number, filing date17208796.720.12.2017
[2019/25]
Priority number, datePL2017042386813.12.2017         Original published format: PL 42386817
[2019/25]
Filing languagePL
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3498592
Date:19.06.2019
Language:EN
[2019/25]
Type: B1 Patent specification 
No.:EP3498592
Date:02.09.2020
Language:EN
[2020/36]
Search report(s)(Supplementary) European search report - dispatched on:EP09.03.2018
ClassificationIPC:B64C1/26, B64C1/06, B64C3/18, B64C3/24, B64C3/26
[2019/25]
CPC:
B64C1/06 (EP); B64C1/26 (EP); B64C3/185 (EP);
B64C3/24 (EP); B64C3/26 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/25]
TitleGerman:FLUGZEUG[2020/11]
English:AIRPLANE[2020/11]
French:AVION[2020/11]
Former [2019/25]METALL/VERBUNDSTOFF-KREUZUNGSSTRUKTUR FÜR EIN FLUGZEUG
Former [2019/25]A JUNCTION OF METAL/COMPOSITE STRUCTURES OF AN AIRPLANE
Former [2019/25]STRUCTURE DE JONCTION MÉTAL/COMPOSITE POUR UN AVION
Examination procedure20.12.2017Examination requested  [2019/25]
18.12.2019Amendment by applicant (claims and/or description)
23.03.2020Communication of intention to grant the patent
21.07.2020Fee for grant paid
21.07.2020Fee for publishing/printing paid
21.07.2020Receipt of the translation of the claim(s)
Opposition(s)03.06.2021No opposition filed within time limit [2021/32]
Fees paidRenewal fee
02.12.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.12.2017
AL02.09.2020
AT02.09.2020
CY02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MK02.09.2020
MT02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
TR02.09.2020
NL23.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IE20.12.2020
LU20.12.2020
BE31.12.2020
IS02.01.2021
PT04.01.2021
[2023/29]
Former [2022/33]HU20.12.2017
AL02.09.2020
AT02.09.2020
CY02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MK02.09.2020
MT02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
TR02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IE20.12.2020
LU20.12.2020
BE31.12.2020
IS02.01.2021
PT04.01.2021
Former [2022/27]HU20.12.2017
AL02.09.2020
AT02.09.2020
CY02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MT02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
TR02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IE20.12.2020
LU20.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/48]AL02.09.2020
AT02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IE20.12.2020
LU20.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/47]AL02.09.2020
AT02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IE20.12.2020
LU20.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/46]AL02.09.2020
AT02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IE20.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/40]AL02.09.2020
AT02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/37]AL02.09.2020
AT02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/36]AL02.09.2020
AT02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/28]AL02.09.2020
AT02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/25]AL02.09.2020
AT02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/23]AT02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/22]EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/21]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/10]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/09]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/08]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
Former [2021/07]FI02.09.2020
LT02.09.2020
NO02.12.2020
Documents cited:Search[X]GB602912  (ERLING LINDOE) [X] 1* the whole document *;
 [X]US2005082425  (FRONTERA CASTANER MIGUEL A [US]) [X] 1,3,4 * paragraph [0015] - paragraph [0026]; figure - *;
 [XI]US2009302159  (PAJARD JEAN-PIERRE [FR]) [X] 1-3,9 * paragraph [0031] - paragraph [0052]; figure - * [I] 4-8,10;
 [X]US8939810  (SUKNANAN NOEL F [US]) [X] 1 * figure 2 *
by applicantWO2008121005
 WO2014053298
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.