blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3339477

EP3339477 - DEPOSITED MATERIAL STRUCTURE WITH INTEGRATED COMPONENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.01.2023
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  04.02.2022
FormerGrant of patent is intended
Status updated on  18.10.2021
FormerExamination is in progress
Status updated on  15.01.2021
FormerRequest for examination was made
Status updated on  11.01.2019
FormerThe application has been published
Status updated on  25.05.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): MC
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Raytheon Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2021/12]
Former [2018/26]For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
Inventor(s)01 / ROBERGE, Gary D.
31 Whitetail Way
Tolland, CT Connecticut 06084 / US
02 / BRINDLEY, William J.
243 Martin Road
Hebron, CT Connecticut 06248 / US
 [2018/26]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2022/10]
Former [2018/26]Dehns
St. Brides House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date17209711.521.12.2017
[2018/26]
Priority number, dateUS20161538822322.12.2016         Original published format: US201615388223
[2018/26]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3339477
Date:27.06.2018
Language:EN
[2018/26]
Type: B1 Patent specification 
No.:EP3339477
Date:09.03.2022
Language:EN
[2022/10]
Search report(s)(Supplementary) European search report - dispatched on:EP09.05.2018
ClassificationIPC:C23C24/04, B33Y80/00, B29C64/141, B29C64/40, B22F3/24, B22F5/00, B22F7/08
[2021/43]
CPC:
C23C24/04 (EP,US); B22F3/24 (EP,US); B22F5/009 (EP,US);
B22F5/04 (US); B22F7/08 (EP,US); B33Y80/00 (EP,US);
F01D25/005 (US); B22F2003/244 (EP,US); B22F2003/247 (EP,US);
B22F2005/005 (EP,US); B22F2998/10 (US); B22F3/02 (EP,US);
F05D2230/31 (US) (-)
Former IPC [2018/26]C23C24/04, B33Y80/00, B29C64/141, B29C64/40
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/07]
Former [2018/26]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ABGELAGERTE MATERIALSTRUKTUR MIT INTEGRIERTEM BAUELEMENT[2018/26]
English:DEPOSITED MATERIAL STRUCTURE WITH INTEGRATED COMPONENT[2018/26]
French:STRUCTURE DE MATÉRIAU DÉPOSÉE À COMPOSANT INTÉGRÉ[2018/26]
Examination procedure27.12.2018Amendment by applicant (claims and/or description)
27.12.2018Examination requested  [2019/07]
27.12.2018Date on which the examining division has become responsible
14.01.2021Despatch of a communication from the examining division (Time limit: M04)
25.05.2021Reply to a communication from the examining division
19.10.2021Communication of intention to grant the patent
01.02.2022Fee for grant paid
01.02.2022Fee for publishing/printing paid
01.02.2022Receipt of the translation of the claim(s)
Opposition(s)12.12.2022No opposition filed within time limit [2023/07]
Fees paidRenewal fee
19.12.2019Renewal fee patent year 03
17.12.2020Renewal fee patent year 04
16.12.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.12.2017
AL09.03.2022
AT09.03.2022
CY09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
MK09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
[2024/29]
Former [2024/27]HU21.12.2017
AL09.03.2022
AT09.03.2022
CY09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
MK09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2024/21]HU21.12.2017
AL09.03.2022
AT09.03.2022
CY09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2024/18]HU21.12.2017
AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2023/35]AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2023/10]AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2023/07]AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2023/01]AL09.03.2022
AT09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2022/51]AT09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2022/50]AT09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/49]AT09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/48]AT09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/47]AT09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/44]FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
Former [2022/39]FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
Former [2022/36]HR09.03.2022
LT09.03.2022
LV09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
Former [2022/35]HR09.03.2022
LT09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
Former [2022/33]LT09.03.2022
NO09.06.2022
Documents cited:Search[X]DE102009037894  (MTU AERO ENGINES GMBH [DE]) [X] 1,2,6,7,11,12 * paragraph [0034] - paragraph [0037]; claims 1-3 *;
 [X]WO2014096822  (BRAYTON ENERGY CANADA INC [CA], et al) [X] 1-15 * page 5, line 31 - page 6, line 10; figures 8,9; claim - * * page 4, lines 1-18 *;
 [A]WO2014116254  (UNITED TECHNOLOGIES CORP [US]) [A] 1-15* paragraph [0035] - paragraph [0043]; claim - *;
 [A]  - PATTISON ET AL, "Cold gas dynamic manufacturing: A non-thermal approach to freeform fabrication", INTERNATIONAL JOURNAL OF MACHINE TOOL DESIGN AND RESEA, PERGAMON PRESS, OXFORD, GB, (20061215), vol. 47, no. 3-4, doi:10.1016/J.IJMACHTOOLS.2006.05.001, ISSN 0020-7357, pages 627 - 634, XP005804252 [A] 1-15 * 3.3 Multimaterial deposition;; figure 6 *

DOI:   http://dx.doi.org/10.1016/j.ijmachtools.2006.05.001
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.