EP3503063 - AUTOMATION CONTROL SYSTEM FOR CONTROLLING A SAFETY FUNCTION OF REMOTE MACHINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.03.2021 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 27.03.2020 | ||
Former | Grant of patent is intended Status updated on 01.01.2020 | ||
Former | Request for examination was made Status updated on 24.05.2019 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): BE, MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Deutsche Telekom AG Friedrich-Ebert-Allee 140 53113 Bonn / DE | [2020/18] |
Former [2019/26] | For all designated states Deutsche Telekom AG Friedrich-Ebert-Allee 140 53113 Bonn / DE | Inventor(s) | 01 /
Klatt, Axel Feldhamsterstraße 30 50999 Köln / DE | [2019/26] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB P.O. Box 86 07 67 81634 München / DE | [2020/18] |
Former [2019/26] | Patentship Patentanwaltsgesellschaft mbH Elsenheimerstraße 65 80687 München / DE | Application number, filing date | 17210455.6 | 22.12.2017 | [2019/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3503063 | Date: | 26.06.2019 | Language: | EN | [2019/26] | Type: | B1 Patent specification | No.: | EP3503063 | Date: | 29.04.2020 | Language: | EN | [2020/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.06.2018 | Classification | IPC: | G08C17/02 | [2019/26] | CPC: |
G08C17/02 (EP,KR,US);
G05B19/41855 (US);
G05B19/4184 (US);
G05B19/4186 (US);
G08C2201/42 (EP,KR);
G08C2201/71 (EP,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/26] | Title | German: | AUTOMATISIERUNGSSTEUERUNGSSYSTEM ZUR STEUERUNG EINER SICHERHEITSFUNKTION EINER ENTFERNTEN MASCHINE | [2019/26] | English: | AUTOMATION CONTROL SYSTEM FOR CONTROLLING A SAFETY FUNCTION OF REMOTE MACHINE | [2019/26] | French: | SYSTÈME DE COMMANDE D'AUTOMATISATION POUR COMMANDER UNE FONCTION DE SÉCURITÉ DE MACHINE À DISTANCE | [2019/26] | Examination procedure | 09.11.2018 | Amendment by applicant (claims and/or description) | 09.11.2018 | Examination requested [2019/26] | 09.11.2018 | Date on which the examining division has become responsible | 02.01.2020 | Communication of intention to grant the patent | 12.03.2020 | Fee for grant paid | 12.03.2020 | Fee for publishing/printing paid | 12.03.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.02.2021 | No opposition filed within time limit [2021/14] | Fees paid | Renewal fee | 17.12.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.12.2017 | AL | 29.04.2020 | AT | 29.04.2020 | CY | 29.04.2020 | CZ | 29.04.2020 | DK | 29.04.2020 | EE | 29.04.2020 | FI | 29.04.2020 | HR | 29.04.2020 | LT | 29.04.2020 | LV | 29.04.2020 | MC | 29.04.2020 | MK | 29.04.2020 | MT | 29.04.2020 | NL | 29.04.2020 | RO | 29.04.2020 | RS | 29.04.2020 | SE | 29.04.2020 | SI | 29.04.2020 | SK | 29.04.2020 | SM | 29.04.2020 | BG | 29.07.2020 | NO | 29.07.2020 | GR | 30.07.2020 | IS | 29.08.2020 | PT | 31.08.2020 | IE | 22.12.2020 | LU | 22.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | [2022/33] |
Former [2022/28] | HU | 22.12.2017 | |
AL | 29.04.2020 | ||
AT | 29.04.2020 | ||
CY | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
MT | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
IE | 22.12.2020 | ||
LU | 22.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/52] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
IE | 22.12.2020 | ||
LU | 22.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/46] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
IE | 22.12.2020 | ||
LU | 22.12.2020 | ||
Former [2021/40] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/24] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/10] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/09] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/08] | AL | 29.04.2020 | |
DK | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/04] | AL | 29.04.2020 | |
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/01] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/51] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/50] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/48] | FI | 29.04.2020 | |
LT | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/47] | LT | 29.04.2020 | |
NO | 29.07.2020 | ||
IS | 29.08.2020 | ||
Former [2020/46] | IS | 29.08.2020 | Documents cited: | Search | [X]US2010177660 (ESSINGER STEVEN [US], et al) [X] 1,11-15 * paragraphs [0008] - [0013] - [0089] - [0096] - [0210] - [0213] * * figures 1A1,1A2,8D,8E; claims 1,6 *; | [X]WO2010105670 (NOKIA SIEMENS NETWORKS OY [FI], et al) [X] 1-15 * paragraphs [0005] - [0008] - [0010] - [0018] - [0045] - [0055] - [0081] * * figures 1,2; claims 1,3,4,16,18 *; | [X]US2015282122 (KIM YONG-SEOK [KR]) [X] 1,11-15 * page 1, lines 7-21 * * page 3, line 25 - page 6, line 22 * * page 8, lines 6-17 * * figures 1,5,6; claims 20,36,42 *; | [A]CN205910583U (BENGBU TRIUMPH ENG & TECH CO LTD) [A] 1-15 * paragraph [0011] ** figure 1; claim 1 * |