blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3470172

EP3470172 - METHOD OF OPTIMIZING A SUPPORT MATERIAL FOR AN OPERATION OF SURFACING OF A LENS BLANK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.07.2021
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  14.08.2020
FormerGrant of patent is intended
Status updated on  10.08.2020
FormerRequest for examination was made
Status updated on  27.07.2020
FormerGrant of patent is intended
Status updated on  25.03.2020
FormerRequest for examination was made
Status updated on  25.10.2019
FormerThe application has been published
Status updated on  15.03.2019
Most recent event   Tooltip16.06.2023Lapse of the patent in a contracting state
New state(s): NL
published on 19.07.2023  [2023/29]
Applicant(s)For all designated states
Essilor International
147, rue de Paris
94220 Charenton-le-Pont / FR
[2019/16]
Inventor(s)01 / PIRAUBE, Sébastien
Essilor International
C/O Essilor of America, Inc. 13555 N.Stemmons
Freeway
DALLAS, TX Texas 75234 / US
02 / BULTEZ, Xavier
Essilor International
C/O Essilor International (Compagnie Générale
d'Optique) 147 rue de Paris
94220 CHARENTON-LE-PONT / FR
03 / MOINE, Jérome
Essilor International
C/O Essilor International (Compagnie Générale
d'Optique) 147 rue de Paris
94220 CHARENTON-LE-PONT / FR
 [2019/16]
Representative(s)Plasseraud IP
104 Rue de Richelieu
CS92104
75080 Paris Cedex 02 / FR
[N/P]
Former [2020/38]Plasseraud IP
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Former [2019/16]Cabinet Plasseraud
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Application number, filing date17306388.413.10.2017
[2019/16]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3470172
Date:17.04.2019
Language:EN
[2019/16]
Type: B1 Patent specification 
No.:EP3470172
Date:16.09.2020
Language:EN
[2020/38]
Search report(s)(Supplementary) European search report - dispatched on:EP28.06.2018
ClassificationIPC:B24B13/005, B24B9/14
[2019/16]
CPC:
B24B13/0055 (EP,US); B24B9/146 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/48]
Former [2019/16]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR OPTIMIERUNG EINES TRÄGERMATERIALS FÜR EINE OPERATION ZUR BESCHICHTUNG EINES LINSENROHLINGS[2019/16]
English:METHOD OF OPTIMIZING A SUPPORT MATERIAL FOR AN OPERATION OF SURFACING OF A LENS BLANK[2019/16]
French:PROCÉDÉ D'OPTIMISATION D'UN MATÉRIAU DE SUPPORT POUR UNE OPÉRATION DE SURFAÇAGE D'UNE ÉBAUCHE DE LENTILLE[2019/16]
Examination procedure17.10.2019Amendment by applicant (claims and/or description)
17.10.2019Examination requested  [2019/48]
17.10.2019Date on which the examining division has become responsible
26.03.2020Communication of intention to grant the patent
21.07.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
21.07.2020Fee for grant paid
21.07.2020Fee for publishing/printing paid
10.08.2020Information about intention to grant a patent
10.08.2020Receipt of the translation of the claim(s)
Opposition(s)17.06.2021No opposition filed within time limit [2021/34]
Fees paidRenewal fee
28.10.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.10.2017
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
NL23.09.2020
IE13.10.2020
LU13.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
[2023/29]
Former [2022/33]HU13.10.2017
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
IE13.10.2020
LU13.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2022/27]HU13.10.2017
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
IE13.10.2020
LU13.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/48]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
IE13.10.2020
LU13.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/46]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
IE13.10.2020
LU13.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/37]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
LU13.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/36]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
LU13.10.2020
BE31.10.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/31]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SK16.09.2020
SM16.09.2020
LU13.10.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/28]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/25]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/23]AT16.09.2020
CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/22]CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/21]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/20]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/10]FI16.09.2020
HR16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/09]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/08]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
Former [2021/07]FI16.09.2020
NO16.12.2020
Documents cited:Search[A]WO2015000758  (ESSILOR INTERNAT CIE GÉNÉRALE D OPTIQUE [FR]) [A] 1-14* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.