blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3483585

EP3483585 - AIR PARTICULATE DETECTION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.05.2023
Database last updated on 28.09.2024
FormerThe patent has been granted
Status updated on  27.05.2022
FormerGrant of patent is intended
Status updated on  25.01.2022
FormerExamination is in progress
Status updated on  14.08.2020
FormerRequest for examination was made
Status updated on  22.11.2019
FormerThe application has been published
Status updated on  12.04.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Carrier Corporation
17900 Beeline Highway
Jupiter, FL 33478 / US
[2019/20]
Inventor(s)01 / BURRIEL, Ricard
Verge de Guadalupe 3
Esplugues de Llobregat
08950 Barcelona / ES
02 / FUSTER, Joan
Verge de Guadalupe 3
Esplugues de Llobregat
08950 Barcelona / ES
03 / BIRNKRANT, Michael J.
411 Silver Lane
East Hartford, CT 06108 / US
04 / MUNUERA, Jose Manuel
Verge de Guadalupe 3
Esplugues de Llobregat
08950 Barcelona / ES
 [2019/20]
Representative(s)Balder IP Law, S.L.
Paseo de la Castellana 93
5ª planta
28046 Madrid / ES
[2019/20]
Application number, filing date17382763.513.11.2017
[2019/20]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3483585
Date:15.05.2019
Language:EN
[2019/20]
Type: B1 Patent specification 
No.:EP3483585
Date:29.06.2022
Language:EN
[2022/26]
Search report(s)(Supplementary) European search report - dispatched on:EP03.05.2018
ClassificationIPC:G01N1/22, G01N1/26, // G01N15/06
[2019/20]
CPC:
G01N1/2273 (EP,US); G01N15/1436 (US); G01N1/26 (EP,US);
G01N15/06 (US); G01N15/1404 (US); G01N15/075 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/52]
Former [2019/20]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:LUFTPARTIKELDETEKTIONSSYSTEM[2019/20]
English:AIR PARTICULATE DETECTION SYSTEM[2019/20]
French:SYSTÈME DE DÉTECTION DE PARTICULES D'AIR[2019/20]
Examination procedure15.11.2019Amendment by applicant (claims and/or description)
15.11.2019Examination requested  [2019/52]
15.11.2019Date on which the examining division has become responsible
13.08.2020Despatch of a communication from the examining division (Time limit: M06)
18.02.2021Reply to a communication from the examining division
26.01.2022Communication of intention to grant the patent
18.05.2022Fee for grant paid
18.05.2022Fee for publishing/printing paid
18.05.2022Receipt of the translation of the claim(s)
Opposition(s)30.03.2023No opposition filed within time limit [2023/23]
Fees paidRenewal fee
20.11.2019Renewal fee patent year 03
19.11.2020Renewal fee patent year 04
18.11.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.11.2017
AL29.06.2022
AT29.06.2022
CY29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
IT29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
MK29.06.2022
MT29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE13.11.2022
LU13.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
[2024/42]
Former [2024/27]HU13.11.2017
AL29.06.2022
AT29.06.2022
CY29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
IT29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
MK29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE13.11.2022
LU13.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2024/21]HU13.11.2017
AL29.06.2022
AT29.06.2022
CY29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
IT29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE13.11.2022
LU13.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2024/18]HU13.11.2017
AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
IT29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE13.11.2022
LU13.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2024/11]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
IT29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE13.11.2022
LU13.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/49]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE13.11.2022
LU13.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/48]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE13.11.2022
LU13.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/37]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
LU13.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/35]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
CH30.11.2022
LI30.11.2022
Former [2023/31]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/22]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/21]AL29.06.2022
AT29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/17]AL29.06.2022
AT29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/12]AT29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/11]AT29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
PT31.10.2022
Former [2023/09]AT29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
PT31.10.2022
Former [2023/08]AT29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
RS29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2023/07]AT29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
RS29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2023/02]FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
RS29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2022/50]FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RS29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2022/49]FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2022/47]FI29.06.2022
LT29.06.2022
SE29.06.2022
NO29.09.2022
Documents cited:Search[XY]WO9846978  (PHOENIX CONTROLS CORP [US]) [X] 1-3,14-20 * page 4, line 5 - page 5, line 11 * * page 7, line 4 - line 12 * * page 10, line 10 - line 27 * * page 13, line 31 - page 14, line 20 * * figures 1, 2 * [Y] 4-13;
 [Y]US7242009  (WILSON GEOFFREY [US], et al) [Y] 4-8 * column 4, line 8 - column 5, line 35 * * column 15, line 18 - line 45 * * figures 1, 2, 7 *;
 [XI]US2015022363  (LANG SCOTT R [US], et al) [X] 1-3,14-16,18,19 * paragraph [0011] - paragraph [0015] * * figure 1 * [I] 17,20;
 [Y]US2017212030  (HASEGAWA YOSHIKI [JP], et al) [Y] 9-13 * paragraph [0059] - paragraph [0078] ** figures 1, 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.