blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3409054

EP3409054 - SYNCHRONIZATION METHOD FOR A NODE IN A CELLULAR NETWORK [Right-click to bookmark this link]
Former [2018/49]SYNCHRONISATION METHOD FOR A NODE IN A CELLULAR NETWORK
[2019/29]
StatusNo opposition filed within time limit
Status updated on  01.01.2021
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  24.01.2020
FormerGrant of patent is intended
Status updated on  13.12.2019
FormerRequest for examination was made
Status updated on  13.11.2019
FormerGrant of patent is intended
Status updated on  16.07.2019
FormerRequest for examination was made
Status updated on  02.11.2018
FormerThe international publication has been made
Status updated on  04.08.2017
Formerunknown
Status updated on  25.01.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Sagemcom Broadband SAS
250, route de l'Empereur
92500 Rueil-Malmaison / FR
[2018/49]
Inventor(s)01 / LALAM, Massinissa
c/o Sagemcom Broadband SAS
250 route de l'Empereur
92500 Rueil Malmaison / FR
02 / LESTABLE, Thierry
c/o Sagemcom Broadband SAS
250 Route de l'Empereur
92500 Rueil Malmaison / FR
 [2018/49]
Representative(s)Cabinet Le Guen Maillet
3, impasse de la Vigie
CS 71840
35418 Saint-Malo Cedex / FR
[2018/49]
Application number, filing date17700461.117.01.2017
[2018/49]
WO2017EP50896
Priority number, dateFR2016005068828.01.2016         Original published format: FR 1650688
[2018/49]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2017129447
Date:03.08.2017
Language:FR
[2017/31]
Type: A1 Application with search report 
No.:EP3409054
Date:05.12.2018
Language:FR
The application published by WIPO in one of the EPO official languages on 03.08.2017 takes the place of the publication of the European patent application.
[2018/49]
Type: B1 Patent specification 
No.:EP3409054
Date:26.02.2020
Language:FR
[2020/09]
Search report(s)International search report - published on:EP03.08.2017
ClassificationIPC:H04W56/00
[2018/49]
CPC:
H04W56/0015 (EP,US); H04J3/0635 (US); H04L7/10 (US);
H04W72/20 (US); H04W88/16 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/49]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:SYNCHRONISATIONS-VERFAHREN FÜR EINEN KNOTEN IN EINEM MOBILFUNKNETZ[2019/29]
English:SYNCHRONIZATION METHOD FOR A NODE IN A CELLULAR NETWORK[2019/29]
French:PROCEDE DE SYNCHRONISATION POUR UN NOEUD DANS UN RÉSEAU CELLULAIRE[2018/49]
Former [2018/49]SYNCHRONISATIONSVERFAHREN FÜR EINEN KNOTEN IN EINEM MOBILFUNKNETZ
Former [2018/49]SYNCHRONISATION METHOD FOR A NODE IN A CELLULAR NETWORK
Entry into regional phase16.08.2018National basic fee paid 
16.08.2018Designation fee(s) paid 
16.08.2018Examination fee paid 
Examination procedure16.08.2018Examination requested  [2018/49]
16.08.2018Date on which the examining division has become responsible
04.03.2019Amendment by applicant (claims and/or description)
17.07.2019Communication of intention to grant the patent
07.11.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
07.11.2019Fee for grant paid
07.11.2019Fee for publishing/printing paid
12.12.2019Information about intention to grant a patent
12.12.2019Receipt of the translation of the claim(s)
Opposition(s)27.11.2020No opposition filed within time limit [2021/05]
Fees paidRenewal fee
24.01.2019Renewal fee patent year 03
21.01.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.01.2017
AT26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MK26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
[2024/42]
Former [2024/29]HU17.01.2017
AT26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MK26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2024/22]HU17.01.2017
AT26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MK26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2023/33]HU17.01.2017
AT26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2023/30]AT26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/40]AT26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/10]AT26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/50]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/49]CZ26.02.2020
DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/48]DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/47]DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/45]FI26.02.2020
HR26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/40]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/39]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
Former [2020/38]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
NO26.05.2020
GR27.05.2020
Former [2020/37]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
NO26.05.2020
Former [2020/35]FI26.02.2020
NO26.05.2020
Cited inInternational search[A]US2005281247  (LIM GEUN-HWI [KR], et al) [A] 1-22 * paragraphs [0059] , [0060] * * figures 1,2 *;
 [A]WO2012158578  (QUALCOMM INC [US], et al) [A] 1-22 * paragraph [0046] * * figures 1,2 *;
 [A]CN104394586  (GCI SCIENCE & TECH CO LTD) [A] 1-22* paragraph [0002] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.