EP3380855 - METHOD FOR DETERMINING PERFORMANCE INFORMATION OF A BATTERY OF A MOTOR VEHICLE ON-BOARD POWER SYSTEM THAT IS CONNECTED TO A DIRECT CURRENT CONVERTER, AND MOTOR VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.03.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 12.04.2019 | ||
Former | Grant of patent is intended Status updated on 02.01.2019 | ||
Former | Request for examination was made Status updated on 31.08.2018 | ||
Former | The international publication has been made Status updated on 28.07.2017 | ||
Former | unknown Status updated on 27.01.2017 | Most recent event Tooltip | 08.09.2023 | Lapse of the patent in a contracting state New state(s): SI | published on 11.10.2023 [2023/41] | Applicant(s) | For all designated states AUDI AG Auto-Union-Strasse 1 85045 Ingolstadt / DE | [2018/40] | Inventor(s) | 01 /
HACKNER, Thomas Gabrielistrasse 20 91171 Greding / DE | 02 /
NAUMANN, Rolf Sandstrasse 3 96247 Michelau / DE | [2018/40] | Application number, filing date | 17700510.5 | 12.01.2017 | [2018/40] | WO2017EP50559 | Priority number, date | DE20161000668 | 22.01.2016 Original published format: DE102016000668 | [2018/40] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017125310 | Date: | 27.07.2017 | Language: | DE | [2017/30] | Type: | A1 Application with search report | No.: | EP3380855 | Date: | 03.10.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 27.07.2017 takes the place of the publication of the European patent application. | [2018/40] | Type: | B1 Patent specification | No.: | EP3380855 | Date: | 15.05.2019 | Language: | DE | [2019/20] | Search report(s) | International search report - published on: | EP | 27.07.2017 | Classification | IPC: | G01R31/36 | [2018/40] | CPC: |
G01R31/3842 (EP,US);
B60L15/2045 (US);
B60L3/0046 (US);
G01R31/006 (US);
G01R31/387 (US);
B60L2210/40 (US);
Y02T10/72 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR ERMITTLUNG EINER LEISTUNGSFÄHIGKEITSINFORMATION EINER BATTERIE EINES KRAFTFAHRZEUGSEITIGEN, AN EINEN GLEICHSPANNUNGSWANDLER ANGEBUNDENEN BORDNETZES UND KRAFTFAHRZEUG | [2018/40] | English: | METHOD FOR DETERMINING PERFORMANCE INFORMATION OF A BATTERY OF A MOTOR VEHICLE ON-BOARD POWER SYSTEM THAT IS CONNECTED TO A DIRECT CURRENT CONVERTER, AND MOTOR VEHICLE | [2018/40] | French: | PROCÉDÉ DE DÉTERMINATION D'UNE INFORMATION DE CAPACITÉ D'UNE BATTERIE D'UN RÉSEAU DE BORD EMBARQUÉ DANS UN VÉHICULE À MOTEUR ET RELIÉ À UN CONVERTISSEUR CC-CC, ET VÉHICULE À MOTEUR | [2018/40] | Entry into regional phase | 26.06.2018 | National basic fee paid | 26.06.2018 | Designation fee(s) paid | 26.06.2018 | Examination fee paid | Examination procedure | 10.05.2017 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 26.06.2018 | Examination requested [2018/40] | 26.06.2018 | Date on which the examining division has become responsible | 03.01.2019 | Communication of intention to grant the patent | 30.01.2019 | Fee for grant paid | 30.01.2019 | Fee for publishing/printing paid | 30.01.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 18.02.2020 | No opposition filed within time limit [2020/17] | Fees paid | Renewal fee | 29.03.2019 | Renewal fee patent year 03 | Penalty fee | Additional fee for renewal fee | 31.01.2019 | 03   M06   Fee paid on   29.03.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.01.2017 | AL | 15.05.2019 | CY | 15.05.2019 | CZ | 15.05.2019 | DK | 15.05.2019 | EE | 15.05.2019 | ES | 15.05.2019 | FI | 15.05.2019 | HR | 15.05.2019 | IT | 15.05.2019 | LT | 15.05.2019 | LV | 15.05.2019 | MC | 15.05.2019 | MK | 15.05.2019 | MT | 15.05.2019 | NL | 15.05.2019 | PL | 15.05.2019 | RO | 15.05.2019 | RS | 15.05.2019 | SE | 15.05.2019 | SI | 15.05.2019 | SK | 15.05.2019 | SM | 15.05.2019 | TR | 15.05.2019 | BG | 15.08.2019 | NO | 15.08.2019 | GR | 16.08.2019 | IS | 15.09.2019 | PT | 15.09.2019 | IE | 12.01.2020 | LU | 12.01.2020 | BE | 31.01.2020 | CH | 31.01.2020 | LI | 31.01.2020 | [2023/41] |
Former [2022/31] | HU | 12.01.2017 | |
AL | 15.05.2019 | ||
CY | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
MK | 15.05.2019 | ||
MT | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IS | 15.09.2019 | ||
PT | 15.09.2019 | ||
IE | 12.01.2020 | ||
LU | 12.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2022/30] | HU | 12.01.2017 | |
AL | 15.05.2019 | ||
CY | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
MT | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IS | 15.09.2019 | ||
PT | 15.09.2019 | ||
IE | 12.01.2020 | ||
LU | 12.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2022/28] | HU | 12.01.2017 | |
AL | 15.05.2019 | ||
CY | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
MT | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
IE | 12.01.2020 | ||
LU | 12.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2021/08] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
IE | 12.01.2020 | ||
LU | 12.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/51] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
LU | 12.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/46] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
LU | 12.01.2020 | ||
Former [2020/39] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/25] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/17] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/14] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/12] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/11] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/09] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/51] | AL | 15.05.2019 | |
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/50] | AL | 15.05.2019 | |
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/49] | AL | 15.05.2019 | |
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
NL | 15.05.2019 | ||
SE | 15.05.2019 | ||
NO | 15.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/48] | ES | 15.05.2019 | |
FI | 15.05.2019 | ||
LT | 15.05.2019 | ||
SE | 15.05.2019 | ||
NO | 15.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/47] | ES | 15.05.2019 | |
FI | 15.05.2019 | ||
LT | 15.05.2019 | ||
NO | 15.08.2019 | Cited in | International search | [A]JP2005332702 (NISSAN MOTOR) [A] 1 * abstract *; | [X]DE102012215755 (BOSCH GMBH ROBERT [DE]) [X] 1-9 * figure 1 *; | [X]DE102013211742 (BOSCH GMBH ROBERT [DE]) [X] 1-9 * figure 1 *; | [X]US2015008929 (EHRMANN MARTIN [DE], et al) [X] 1-9 * figures 1, 2 *; | [A]DE102014004791 (AUDI AG [DE]) [A] 1* figure 1 * | by applicant | DE102013219293 | DE102014007016 |