blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3405388

EP3405388 - VESSEL ENERGY MANAGEMENT SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.01.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  31.01.2020
FormerGrant of patent is intended
Status updated on  24.09.2019
FormerRequest for examination was made
Status updated on  26.10.2018
FormerThe international publication has been made
Status updated on  28.07.2017
Formerunknown
Status updated on  27.01.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Siemens Energy Global GmbH & Co. KG
Otto-Hahn-Ring 6
81739 München / DE
[2021/04]
Former [2018/48]For all designated states
Siemens Aktiengesellschaft
Werner-von-Siemens-Straße 1
80333 München / DE
Inventor(s)01 / GJERPE, Paul Fredrik
Setra vei 3
0786 Oslo / NO
02 / VOSS, Wolfgang
Lohbeet 1
91097 Oberreichenbach / DE
 [2018/48]
Representative(s)Maier, Daniel Oliver
Siemens AG
Postfach 22 16 34
80506 München / DE
[N/P]
Former [2018/48]Maier, Daniel Oliver
Siemens AG
Postfach 22 16 34
80506 München / DE
Application number, filing date17700662.416.01.2017
[2018/48]
WO2017EP50826
Priority number, dateEP2016015213120.01.2016         Original published format: EP 16152131
GB2016000778504.05.2016         Original published format: GB 201607785
[2018/48]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017125359
Date:27.07.2017
Language:EN
[2017/30]
Type: A1 Application with search report 
No.:EP3405388
Date:28.11.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 27.07.2017 takes the place of the publication of the European patent application.
[2018/48]
Type: B1 Patent specification 
No.:EP3405388
Date:04.03.2020
Language:EN
[2020/10]
Search report(s)International search report - published on:EP27.07.2017
ClassificationIPC:B63H21/17, B63H21/21
[2018/48]
CPC:
B63H21/21 (EP,KR,US); B63H21/17 (EP,KR,US); B60L3/00 (EP,KR,US);
B60L3/0061 (EP,US); B60L3/0092 (EP,US); H02J7/14 (KR);
B60L2200/32 (EP,KR,US); B60L2220/42 (EP,US); B63H2021/173 (KR,US);
B63H2021/216 (KR,US); Y02T10/64 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/48]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:SYSTEM ZUM REGELN VON SCHIFFSENERGIE[2019/39]
English:VESSEL ENERGY MANAGEMENT SYSTEM[2018/48]
French:SYSTÈME DE GESTION D'ÉNERGIE DE NAVIRE[2018/48]
Former [2018/48]SCHIFFSENERGIEVERWALTUNGSSYSTEM
Entry into regional phase28.06.2018National basic fee paid 
28.06.2018Designation fee(s) paid 
28.06.2018Examination fee paid 
Examination procedure28.06.2018Examination requested  [2018/48]
28.06.2018Date on which the examining division has become responsible
26.02.2019Amendment by applicant (claims and/or description)
25.09.2019Communication of intention to grant the patent
21.01.2020Receipt of the translation of the claim(s)
22.01.2020Fee for grant paid
22.01.2020Fee for publishing/printing paid
Opposition(s)07.12.2020No opposition filed within time limit [2021/06]
Fees paidRenewal fee
18.01.2019Renewal fee patent year 03
20.01.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.01.2017
AT04.03.2020
CZ04.03.2020
EE04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MK04.03.2020
MT04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
[2024/42]
Former [2024/22]HU16.01.2017
AT04.03.2020
CZ04.03.2020
EE04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MK04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2023/33]HU16.01.2017
AT04.03.2020
CZ04.03.2020
EE04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/40]AT04.03.2020
CZ04.03.2020
EE04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/11]AT04.03.2020
CZ04.03.2020
EE04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/50]CZ04.03.2020
EE04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/49]CZ04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/48]HR04.03.2020
LT04.03.2020
LV04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SM04.03.2020
BG04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/47]HR04.03.2020
LT04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/46]HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/39]HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
GR05.06.2020
Former [2020/38]HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
GR05.06.2020
Former [2020/37]HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
Cited inInternational search[I]US6645017  (SKRZYPEK MARK L [US], et al);
 [XI]US2010125383  (CAOUETTE PIERRE [US]);
 [I]DE102011122130  (ANDERSEN PETER [DE]);
 [XI]KR20140046441  (WAERTSILAE FINLAND OY [FI]);
 [I]FR2999147  (MEDITERRANEE CONST IND [FR])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.