blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3414082

EP3414082 - METHOD FOR PRODUCING A STRUCTURAL ELEMENT CONSISTING OF A FIBRE-COMPOSITE HOLLOW PROFILE AND LOAD-INTRODUCING ELEMENT, AND STRUCTURAL ELEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.05.2022
Database last updated on 25.09.2024
FormerThe patent has been granted
Status updated on  11.06.2021
FormerGrant of patent is intended
Status updated on  07.04.2021
FormerRequest for examination was made
Status updated on  16.11.2018
FormerThe international publication has been made
Status updated on  18.08.2017
Formerunknown
Status updated on  01.02.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Leichtbau-Zentrum Sachsen GmbH
Marschnerstrasse 39
01307 Dresden / DE
[2018/51]
Inventor(s)01 / LENZ, Florian
Weintraubenstraße 4
01099 Dresden / DE
02 / WITSCHEL, Bernhard
Glasewaldtstraße 40
01277 Dresden / DE
03 / LEPPER, Martin
Kipsdorfer Straße 149
01279 Dresden / DE
 [2018/51]
Representative(s)Kailuweit & Uhlemann Patentanwälte Partnerschaft mbB
Bamberger Straße 49
01187 Dresden / DE
[2018/51]
Application number, filing date17701125.123.01.2017
[2018/51]
WO2017EP51326
Priority number, dateDE20161020201210.02.2016         Original published format: DE102016202012
[2018/51]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017137242
Date:17.08.2017
Language:DE
[2017/33]
Type: A1 Application with search report 
No.:EP3414082
Date:19.12.2018
Language:DE
The application published by WIPO in one of the EPO official languages on 17.08.2017 takes the place of the publication of the European patent application.
[2018/51]
Type: B1 Patent specification 
No.:EP3414082
Date:14.07.2021
Language:DE
[2021/28]
Search report(s)International search report - published on:EP17.08.2017
ClassificationIPC:B29C70/86, B29C70/52
[2018/51]
CPC:
B29C70/52 (EP,US); B29C70/545 (US); B29C70/86 (EP,US);
B29C53/56 (US); B29C53/824 (US); B29K2101/10 (US);
B29L2023/00 (US); Y10T156/1064 (US); Y10T156/1082 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/51]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES STRUKTURELEMENTS AUS FASERVERBUND-HOHLPROFIL UND LASTEINLEITUNGSELEMENT, SOWIE STRUKTURELEMENT[2018/51]
English:METHOD FOR PRODUCING A STRUCTURAL ELEMENT CONSISTING OF A FIBRE-COMPOSITE HOLLOW PROFILE AND LOAD-INTRODUCING ELEMENT, AND STRUCTURAL ELEMENT[2018/51]
French:PROCÉDÉ DE FABRICATION D'UN ÉLÉMENT STRUCTURAL À PARTIR D'UN PROFILÉ CREUX EN COMPOSITE DE FIBRES ET D'UN ÉLÉMENT DE TRANSFERT DE CHARGE AINSI QU'ÉLÉMENT STRUCTURAL[2018/51]
Entry into regional phase05.09.2018National basic fee paid 
05.09.2018Designation fee(s) paid 
05.09.2018Examination fee paid 
Examination procedure05.09.2018Examination requested  [2018/51]
05.09.2018Date on which the examining division has become responsible
08.03.2019Amendment by applicant (claims and/or description)
08.04.2021Communication of intention to grant the patent
04.06.2021Fee for grant paid
04.06.2021Fee for publishing/printing paid
04.06.2021Receipt of the translation of the claim(s)
Opposition(s)19.04.2022No opposition filed within time limit [2022/25]
Fees paidRenewal fee
25.01.2019Renewal fee patent year 03
27.01.2020Renewal fee patent year 04
25.11.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.01.2017
AL14.07.2021
CY14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
MK14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
TR14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
AT23.01.2022
GB23.01.2022
IE23.01.2022
LU23.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
[2024/29]
Former [2024/22]HU23.01.2017
AL14.07.2021
CY14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
MK14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
AT23.01.2022
GB23.01.2022
IE23.01.2022
LU23.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2024/20]HU23.01.2017
AL14.07.2021
CY14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
AT23.01.2022
GB23.01.2022
IE23.01.2022
LU23.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2024/18]HU23.01.2017
AL14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
AT23.01.2022
GB23.01.2022
IE23.01.2022
LU23.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2023/22]AL14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
AT23.01.2022
GB23.01.2022
IE23.01.2022
LU23.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2023/09]AL14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
GB23.01.2022
IE23.01.2022
LU23.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2023/03]AL14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
GB23.01.2022
LU23.01.2022
BE31.01.2022
CH31.01.2022
LI31.01.2022
Former [2023/01]AL14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
GB23.01.2022
LU23.01.2022
BE31.01.2022
Former [2022/47]AL14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
GB23.01.2022
LU23.01.2022
Former [2022/46]AL14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
LU23.01.2022
Former [2022/39]AL14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/36]AL14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
IT14.07.2021
LT14.07.2021
LV14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/29]AL14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/25]CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/24]CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SK14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/21]DK14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
NL14.07.2021
PL14.07.2021
RS14.07.2021
SE14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/11]ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
NL14.07.2021
PL14.07.2021
RS14.07.2021
SE14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/09]ES14.07.2021
FI14.07.2021
LT14.07.2021
NL14.07.2021
RS14.07.2021
SE14.07.2021
BG14.10.2021
NO14.10.2021
PT15.11.2021
Former [2022/08]ES14.07.2021
FI14.07.2021
LT14.07.2021
NL14.07.2021
SE14.07.2021
BG14.10.2021
NO14.10.2021
Former [2022/07]LT14.07.2021
NL14.07.2021
NO14.10.2021
Cited inInternational search[XA]US2015013819  (STEWART SAMUEL RAY [US]) [X] 19-21 * paragraph [0041]; claim 28 * [A] 1-18
by applicantDE102006039565
 DE102004021144
 DE10249591
 WO2005105417
 DE102014004158
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.