blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3414152

EP3414152 - BICYCLE GEARING HAVING A NONCIRCULAR CHAINRING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  06.03.2020
FormerGrant of patent is intended
Status updated on  21.10.2019
FormerRequest for examination was made
Status updated on  16.11.2018
FormerThe international publication has been made
Status updated on  18.08.2017
Formerunknown
Status updated on  25.02.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Möve Bikes GmbH
Felchtaer Str. 27
99974 Mühlhausen / DE
[2018/51]
Inventor(s)01 / SCHUBERT, Stefan
Herrenstr. 16
99974 Mühlhausen / DE
02 / SPRÖTE, Tobias
Schillerweg 71
99974 Mühlhausen / DE
03 / ROCHLITZER, Marcus
Rudolf-Virchow-Str. 78
99974 Mühlhausen / DE
 [2018/51]
Representative(s)Fritzsche, Thomas
Fritzsche Patent
Naupliastraße 110
81545 München / DE
[2018/51]
Application number, filing date17705348.510.02.2017
[2018/51]
WO2017EP53083
Priority number, dateDE2016100166012.02.2016         Original published format: DE102016001660
DE2016100488822.04.2016         Original published format: DE102016004888
[2018/51]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017137610
Date:17.08.2017
Language:DE
[2017/33]
Type: A1 Application with search report 
No.:EP3414152
Date:19.12.2018
Language:DE
The application published by WIPO in one of the EPO official languages on 17.08.2017 takes the place of the publication of the European patent application.
[2018/51]
Type: B1 Patent specification 
No.:EP3414152
Date:08.04.2020
Language:DE
[2020/15]
Search report(s)International search report - published on:EP17.08.2017
ClassificationIPC:B62M3/06, B62M3/00, B62M9/08
[2018/51]
CPC:
B62M3/06 (EP,CN,KR,US); B62M11/02 (US); B62M11/14 (CN);
B62M9/08 (EP,KR,US); F16H1/28 (US); F16H35/00 (US);
F16H55/30 (US); F16H2035/003 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/51]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:FAHRRADGETRIEBE MIT UNRUNDEM KETTENBLATT[2018/51]
English:BICYCLE GEARING HAVING A NONCIRCULAR CHAINRING[2018/51]
French:TRANSMISSION DE BICYCLETTE À PLATEAU NON CIRCULAIRE[2018/51]
Entry into regional phase11.09.2018National basic fee paid 
11.09.2018Designation fee(s) paid 
11.09.2018Examination fee paid 
Examination procedure12.12.2017Request for preliminary examination filed
International Preliminary Examining Authority: EP
11.09.2018Amendment by applicant (claims and/or description)
11.09.2018Examination requested  [2018/51]
11.09.2018Date on which the examining division has become responsible
22.10.2019Communication of intention to grant the patent
20.02.2020Fee for grant paid
20.02.2020Fee for publishing/printing paid
20.02.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
12.02.2019Renewal fee patent year 03
28.02.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.02.2017
AL08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
[2024/29]
Former [2024/22]HU10.02.2017
AL08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2023/33]HU10.02.2017
AL08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2023/30]AL08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/41]AL08.04.2020
CZ08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/24]AL08.04.2020
CZ08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/10]AL08.04.2020
CZ08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RO08.04.2020
RS08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/09]AL08.04.2020
CZ08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RO08.04.2020
RS08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/04]AL08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/01]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/51]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/50]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/48]FI08.04.2020
LT08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/47]LT08.04.2020
NO08.07.2020
IS08.08.2020
Former [2020/46]IS08.08.2020
Cited inInternational search[A]US4193324  (MARC MICHEL [US]) [A] 1-9,12,13 * the whole document *;
 [IA]EP0262841  (BRIDGESTONE CYCLE CO [JP]) [I] 1-9,12,13 * the whole document * [A] 10,11;
 [A]WO2013191572  (MIGASZEWSKI WIKTOR [PL], et al) [A] 1-9,12,13* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.