EP3414152 - BICYCLE GEARING HAVING A NONCIRCULAR CHAINRING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 06.03.2020 | ||
Former | Grant of patent is intended Status updated on 21.10.2019 | ||
Former | Request for examination was made Status updated on 16.11.2018 | ||
Former | The international publication has been made Status updated on 18.08.2017 | ||
Former | unknown Status updated on 25.02.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Möve Bikes GmbH Felchtaer Str. 27 99974 Mühlhausen / DE | [2018/51] | Inventor(s) | 01 /
SCHUBERT, Stefan Herrenstr. 16 99974 Mühlhausen / DE | 02 /
SPRÖTE, Tobias Schillerweg 71 99974 Mühlhausen / DE | 03 /
ROCHLITZER, Marcus Rudolf-Virchow-Str. 78 99974 Mühlhausen / DE | [2018/51] | Representative(s) | Fritzsche, Thomas Fritzsche Patent Naupliastraße 110 81545 München / DE | [2018/51] | Application number, filing date | 17705348.5 | 10.02.2017 | [2018/51] | WO2017EP53083 | Priority number, date | DE20161001660 | 12.02.2016 Original published format: DE102016001660 | DE20161004888 | 22.04.2016 Original published format: DE102016004888 | [2018/51] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017137610 | Date: | 17.08.2017 | Language: | DE | [2017/33] | Type: | A1 Application with search report | No.: | EP3414152 | Date: | 19.12.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 17.08.2017 takes the place of the publication of the European patent application. | [2018/51] | Type: | B1 Patent specification | No.: | EP3414152 | Date: | 08.04.2020 | Language: | DE | [2020/15] | Search report(s) | International search report - published on: | EP | 17.08.2017 | Classification | IPC: | B62M3/06, B62M3/00, B62M9/08 | [2018/51] | CPC: |
B62M3/06 (EP,CN,KR,US);
B62M11/02 (US);
B62M11/14 (CN);
B62M9/08 (EP,KR,US);
F16H1/28 (US);
F16H35/00 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FAHRRADGETRIEBE MIT UNRUNDEM KETTENBLATT | [2018/51] | English: | BICYCLE GEARING HAVING A NONCIRCULAR CHAINRING | [2018/51] | French: | TRANSMISSION DE BICYCLETTE À PLATEAU NON CIRCULAIRE | [2018/51] | Entry into regional phase | 11.09.2018 | National basic fee paid | 11.09.2018 | Designation fee(s) paid | 11.09.2018 | Examination fee paid | Examination procedure | 12.12.2017 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 11.09.2018 | Amendment by applicant (claims and/or description) | 11.09.2018 | Examination requested [2018/51] | 11.09.2018 | Date on which the examining division has become responsible | 22.10.2019 | Communication of intention to grant the patent | 20.02.2020 | Fee for grant paid | 20.02.2020 | Fee for publishing/printing paid | 20.02.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 12.02.2019 | Renewal fee patent year 03 | 28.02.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.02.2017 | AL | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | EE | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | [2024/29] |
Former [2024/22] | HU | 10.02.2017 | |
AL | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
EE | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MK | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2023/33] | HU | 10.02.2017 | |
AL | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
EE | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2023/30] | AL | 08.04.2020 | |
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
EE | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/41] | AL | 08.04.2020 | |
CZ | 08.04.2020 | ||
EE | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | AL | 08.04.2020 | |
CZ | 08.04.2020 | ||
EE | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 08.04.2020 | |
CZ | 08.04.2020 | ||
EE | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 08.04.2020 | |
CZ | 08.04.2020 | ||
EE | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 08.04.2020 | |
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RS | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RS | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RS | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 08.04.2020 | |
LT | 08.04.2020 | ||
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 08.04.2020 | |
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
Former [2020/46] | IS | 08.08.2020 | Cited in | International search | [A]US4193324 (MARC MICHEL [US]) [A] 1-9,12,13 * the whole document *; | [IA]EP0262841 (BRIDGESTONE CYCLE CO [JP]) [I] 1-9,12,13 * the whole document * [A] 10,11; | [A]WO2013191572 (MIGASZEWSKI WIKTOR [PL], et al) [A] 1-9,12,13* the whole document * |