EP3414073 - METHOD FOR PRODUCING A PLASTIC PART IN THE TWO-COMPONENT INJECTION MOULDING METHOD [Right-click to bookmark this link] | |||
Former [2018/51] | METHOD FOR PRODUCING A PLASTIC PART IN THE TWO-COMPONENT INJECTION MOULDING METHOD AND PLASTIC INJECTION MOULD | ||
[2019/47] | Status | No opposition filed within time limit Status updated on 19.02.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 13.03.2020 | ||
Former | Grant of patent is intended Status updated on 06.11.2019 | ||
Former | Request for examination was made Status updated on 21.10.2019 | ||
Former | Grant of patent is intended Status updated on 04.07.2019 | ||
Former | Request for examination was made Status updated on 16.11.2018 | ||
Former | The international publication has been made Status updated on 18.08.2017 | ||
Former | unknown Status updated on 08.03.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Z-Werkzeugbau-GmbH Dr.-Walter-Zumtobel-Str. 9 6850 Dornbirn / AT | [2018/51] | Inventor(s) | 01 /
HAEMMERLE, Hubert Im Horn 27 6850 Dornbirn / AT | 02 /
HELTH, Franz Rheinstr. 3a 6845 Hohenems / AT | 03 /
MOOSBRUGGER, Thomas Unter der Eiche 6b 6850 Dornbirn / AT | [2018/51] | Representative(s) | Müller, Enno, et al Rieder & Partner mbB Patentanwälte - Rechtsanwalt Yale-Allee 26 42329 Wuppertal / DE | [N/P] |
Former [2018/51] | Müller, Enno, et al Rieder & Partner mbB Patentanwälte - Rechtsanwalt Corneliusstrasse 45 42329 Wuppertal / DE | Application number, filing date | 17707481.2 | 10.02.2017 | [2018/51] | WO2017EP53024 | Priority number, date | DE201610102345 | 10.02.2016 Original published format: DE102016102345 | [2018/51] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017137572 | Date: | 17.08.2017 | Language: | DE | [2017/33] | Type: | A1 Application with search report | No.: | EP3414073 | Date: | 19.12.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 17.08.2017 takes the place of the publication of the European patent application. | [2018/51] | Type: | B1 Patent specification | No.: | EP3414073 | Date: | 15.04.2020 | Language: | DE | [2020/16] | Search report(s) | International search report - published on: | EP | 17.08.2017 | Classification | IPC: | B29C45/16, B29C45/28 | [2018/51] | CPC: |
B29C45/1603 (EP);
B29C45/16 (EP);
B29C45/2896 (EP);
B29C2045/161 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES KUNSTSTOFFTEILS IM ZWEIKOMPONENTEN-SPRITZVERFAHREN | [2019/47] | English: | METHOD FOR PRODUCING A PLASTIC PART IN THE TWO-COMPONENT INJECTION MOULDING METHOD | [2019/47] | French: | PROCÉDÉ POUR LA FABRICATION D'UNE PIÈCE EN MATÉRIAU SYNTHÉTIQUE DANS UN PROCÉDÉ DE MOULAGE PAR INJECTION À DEUX COMPOSANTS | [2019/47] |
Former [2018/51] | VERFAHREN ZUR HERSTELLUNG EINES KUNSTSTOFFTEILS IM ZWEIKOMPONENTEN-SPRITZVERFAHREN UND KUNSTSTOFF-SPRITZWERKZEUG | ||
Former [2018/51] | METHOD FOR PRODUCING A PLASTIC PART IN THE TWO-COMPONENT INJECTION MOULDING METHOD AND PLASTIC INJECTION MOULD | ||
Former [2018/51] | PROCÉDÉ POUR LA FABRICATION D'UNE PIÈCE EN MATÉRIAU SYNTHÉTIQUE DANS UN PROCÉDÉ DE MOULAGE PAR INJECTION À DEUX COMPOSANTS ET OUTIL DE MOULAGE PAR INJECTION DE MATÉRIAU SYNTHÉTIQUE | Entry into regional phase | 06.09.2018 | National basic fee paid | 06.09.2018 | Designation fee(s) paid | 06.09.2018 | Examination fee paid | Examination procedure | 06.12.2017 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 06.09.2018 | Examination requested [2018/51] | 06.09.2018 | Date on which the examining division has become responsible | 22.01.2019 | Amendment by applicant (claims and/or description) | 05.07.2019 | Communication of intention to grant the patent | 08.10.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 07.11.2019 | Communication of intention to grant the patent | 05.03.2020 | Fee for grant paid | 05.03.2020 | Fee for publishing/printing paid | 05.03.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 18.01.2021 | No opposition filed within time limit [2021/12] | Fees paid | Renewal fee | 20.12.2018 | Renewal fee patent year 03 | 19.12.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.02.2017 | AL | 15.04.2020 | CY | 15.04.2020 | CZ | 15.04.2020 | DK | 15.04.2020 | EE | 15.04.2020 | FI | 15.04.2020 | HR | 15.04.2020 | IT | 15.04.2020 | LT | 15.04.2020 | LV | 15.04.2020 | MC | 15.04.2020 | MK | 15.04.2020 | MT | 15.04.2020 | NL | 15.04.2020 | PL | 15.04.2020 | RO | 15.04.2020 | RS | 15.04.2020 | SE | 15.04.2020 | SI | 15.04.2020 | SK | 15.04.2020 | SM | 15.04.2020 | TR | 15.04.2020 | BG | 15.07.2020 | NO | 15.07.2020 | GR | 16.07.2020 | IS | 15.08.2020 | PT | 17.08.2020 | [2024/42] |
Former [2024/29] | HU | 10.02.2017 | |
AL | 15.04.2020 | ||
CY | 15.04.2020 | ||
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
MK | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
TR | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2024/22] | HU | 10.02.2017 | |
AL | 15.04.2020 | ||
CY | 15.04.2020 | ||
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
MK | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2023/33] | HU | 10.02.2017 | |
AL | 15.04.2020 | ||
CY | 15.04.2020 | ||
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2023/30] | AL | 15.04.2020 | |
CY | 15.04.2020 | ||
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/41] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
IT | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 15.04.2020 | |
DK | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 15.04.2020 | |
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 15.04.2020 | |
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | FI | 15.04.2020 | |
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 15.04.2020 | |
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
SE | 15.04.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 15.04.2020 | |
LT | 15.04.2020 | ||
NL | 15.04.2020 | ||
SE | 15.04.2020 | ||
NO | 15.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 15.04.2020 | |
NO | 15.07.2020 | ||
IS | 15.08.2020 | ||
Former [2020/46] | IS | 15.08.2020 | Cited in | International search | [X]JPH01304919 (YOSHINO KOGYOSHO CO LTD) [X] 1-20 * abstract *; | [X]DE19508509 (SOOTH JUERGEN [DE]) [X] 1-20 * abstract *; | [X]DE19948664 (BAYERISCHE MOTOREN WERKE AG [DE]) [X] 1-20* figures 3a, 3b *; | [X] - "ZWEI KOMPONENTEN MIT KOAXIALEN NADELN SPRITZGIESSEN", KUNSTSTOFFE, CARL HANSER VERLAG, MUNCHEN, DE, (19981201), vol. 88, no. 12, ISSN 0023-5563, page 2162, XP000936413 [X] 1-20 * page 2162 * | by applicant | US5472655 | DE19722612 | DE10314032 | WO2010003249 | US2010007058 | DE102012005531 |