blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3423317

EP3423317 - AIR DRYER CARTRIDGE AND COIL SPRING FOR AIR DRYER CARTRIDGE [Right-click to bookmark this link]
Former [2019/02]AIR-DRYER CARTRIDGE AND HELICAL SPRING FOR AN AIR-DRYER CARTRIDGE
[2020/12]
StatusNo opposition filed within time limit
Status updated on  25.06.2021
Database last updated on 28.09.2024
FormerThe patent has been granted
Status updated on  17.07.2020
FormerGrant of patent is intended
Status updated on  12.03.2020
FormerExamination is in progress
Status updated on  25.06.2019
FormerRequest for examination was made
Status updated on  07.12.2018
FormerThe international publication has been made
Status updated on  08.09.2017
Formerunknown
Status updated on  08.03.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
KNORR-BREMSE Systeme für Nutzfahrzeuge GmbH
Moosacher Strasse 80
80809 München / DE
[2019/02]
Inventor(s)01 / OCHSENKÜHN, Andreas
Pettenkoferstr. 22b
80339 München / DE
 [2019/02]
Application number, filing date17707507.423.02.2017
[2019/02]
WO2017EP54115
Priority number, dateDE2016100238501.03.2016         Original published format: DE102016002385
[2019/02]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017148778
Date:08.09.2017
Language:DE
[2017/36]
Type: A1 Application with search report 
No.:EP3423317
Date:09.01.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 08.09.2017 takes the place of the publication of the European patent application.
[2019/02]
Type: B1 Patent specification 
No.:EP3423317
Date:19.08.2020
Language:DE
[2020/34]
Search report(s)International search report - published on:EP08.09.2017
ClassificationIPC:B60T17/00
[2019/02]
CPC:
B60T17/004 (EP,KR,US); B01D53/0407 (US); B01D53/26 (RU);
B60T13/26 (KR); B60T17/00 (RU); F16F1/046 (KR);
B01D53/261 (US); B60Y2200/14 (KR); B60Y2200/148 (KR);
B60Y2200/221 (KR); B60Y2300/28 (KR); B60Y2400/81 (KR) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/02]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:LUFTTROCKNERPATRONE UND SCHRAUBENFEDER FÜR LUFTTROCKNERPATRONE[2019/02]
English:AIR DRYER CARTRIDGE AND COIL SPRING FOR AIR DRYER CARTRIDGE[2020/12]
French:CARTOUCHE DE DESSICATEUR D'AIR ET RESSORT HÉLICOÏDAL POUR UNE CARTOUCHE DE DESSICATEUR D'AIR[2020/12]
Former [2019/02]AIR-DRYER CARTRIDGE AND HELICAL SPRING FOR AN AIR-DRYER CARTRIDGE
Former [2019/02]CARTOUCHE D'UN SÉCHEUR D'AIRE COMPRIMÉ À CARTOUCHE ET RESSORT HÉLICOÏDALE POUR UNE CARTOUCHE D'UN SÉCHEUR D'AIRE COMPRIMÉ À CARTOUCHE
Entry into regional phase01.10.2018National basic fee paid 
01.10.2018Designation fee(s) paid 
01.10.2018Examination fee paid 
Examination procedure01.10.2018Examination requested  [2019/02]
01.10.2018Date on which the examining division has become responsible
22.03.2019Amendment by applicant (claims and/or description)
27.06.2019Despatch of a communication from the examining division (Time limit: M04)
25.10.2019Reply to a communication from the examining division
13.03.2020Communication of intention to grant the patent
03.07.2020Fee for grant paid
03.07.2020Fee for publishing/printing paid
03.07.2020Receipt of the translation of the claim(s)
Opposition(s)20.05.2021No opposition filed within time limit [2021/30]
Fees paidRenewal fee
28.02.2019Renewal fee patent year 03
02.03.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.02.2017
AL19.08.2020
CY19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
MK19.08.2020
MT19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
[2024/42]
Former [2024/22]HU23.02.2017
AL19.08.2020
CY19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
MK19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2023/33]HU23.02.2017
AL19.08.2020
CY19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2023/30]AL19.08.2020
CY19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2022/34]AL19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2022/07]AL19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE23.02.2021
LU23.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2021/47]AL19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
LU23.02.2021
CH28.02.2021
LI28.02.2021
Former [2021/41]AL19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/36]AL19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/28]AL19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RO19.08.2020
RS19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/25]AL19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RO19.08.2020
RS19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/22]CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RO19.08.2020
RS19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/21]DK19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RS19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/10]FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RS19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/09]FI19.08.2020
LT19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
PT21.12.2020
Former [2021/08]FI19.08.2020
LT19.08.2020
BG19.11.2020
NO19.11.2020
PT21.12.2020
Former [2021/07]FI19.08.2020
LT19.08.2020
NO19.11.2020
Cited inInternational search[XAI]WO9514598  (KNORR BREMSE SYSTEME [DE], et al) [X] 1-5,8,9,11,12,14 * page 3, line 1 - page 5, line 23; figure 1 * [A] 13 [I] 6,7,10;
 [XAI]US2004094036  (NICHOLS RANDALL W [US], et al) [X] 1,5,6,11,13,14 * paragraph [0013] - paragraph [0019]; figures 2-4 * [A] 2-4,9,10,12 [I] 7,8;
 [XAI]EP1813491  (BENDIX COMMERCIAL VEHICLE SYS [US]) [X] 1-5,9,11,13,14 * paragraph [0014] - paragraph [0021]; figures 1,2 * [A] 7,12 [I] 6,8,10;
 [A]US2009038327  (AMESOEDER DIETER [DE], et al) [A] 1,9,10* paragraph [0006] - paragraph [0023]; figures 1-3 *
by applicantEP0036569
 EP2448801
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.