blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3427089

EP3427089 - SCANNING DETECTOR AND CONTROL METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.03.2023
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  02.04.2022
FormerGrant of patent is intended
Status updated on  09.01.2022
FormerRequest for examination was made
Status updated on  14.12.2018
FormerThe international publication has been made
Status updated on  15.09.2017
Formerunknown
Status updated on  08.03.2017
Most recent event   Tooltip09.02.2024Lapse of the patent in a contracting state
New state(s): IT
published on 13.03.2024  [2024/11]
Applicant(s)For all designated states
Hilti Aktiengesellschaft
Feldkircherstrasse 100
9494 Schaan / LI
[2019/03]
Inventor(s)01 / ABU ANTOUN, Chafic
Lagerstrasse 2
9470 Buchs / CH
 [2019/03]
Representative(s)Hilti Aktiengesellschaft Corporate Intellectual Property
Feldkircherstrasse 100
Postfach 333
9494 Schaan / LI
[2019/03]
Application number, filing date17707569.401.03.2017
[2019/03]
WO2017EP54698
Priority number, dateEP2016015891207.03.2016         Original published format: EP 16158912
[2019/03]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017153213
Date:14.09.2017
Language:EN
[2017/37]
Type: A1 Application with search report 
No.:EP3427089
Date:16.01.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 14.09.2017 takes the place of the publication of the European patent application.
[2019/03]
Type: B1 Patent specification 
No.:EP3427089
Date:04.05.2022
Language:EN
[2022/18]
Search report(s)International search report - published on:EP14.09.2017
ClassificationIPC:G01V3/10
[2019/03]
CPC:
G01V3/108 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/03]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ABTASTDETEKTOR UND KONTROLLVERFAHREN[2022/04]
English:SCANNING DETECTOR AND CONTROL METHOD[2019/03]
French:DÉTECTEUR À BALAYAGE ET PROCÉDÉ DE COMMANDE[2019/03]
Former [2019/03]SCANDETEKTOR UND STEUERUNGSVERFAHREN
Entry into regional phase08.10.2018National basic fee paid 
08.10.2018Designation fee(s) paid 
08.10.2018Examination fee paid 
Examination procedure08.10.2018Examination requested  [2019/03]
08.10.2018Date on which the examining division has become responsible
08.04.2019Amendment by applicant (claims and/or description)
10.01.2022Communication of intention to grant the patent
10.03.2022Fee for grant paid
10.03.2022Fee for publishing/printing paid
10.03.2022Receipt of the translation of the claim(s)
Opposition(s)07.02.2023No opposition filed within time limit [2023/15]
Fees paidRenewal fee
26.03.2019Renewal fee patent year 03
24.03.2020Renewal fee patent year 04
23.03.2021Renewal fee patent year 05
25.03.2022Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
IT04.05.2022
LT04.05.2022
LV04.05.2022
MC04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
[2024/11]
Former [2023/48]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
MC04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2023/25]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SI04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2023/17]AL04.05.2022
AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2023/09]AT04.05.2022
CZ04.05.2022
DK04.05.2022
EE04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RO04.05.2022
RS04.05.2022
SE04.05.2022
SK04.05.2022
SM04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2023/07]AT04.05.2022
DK04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RS04.05.2022
SE04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2022/51]AT04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RS04.05.2022
SE04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
IS04.09.2022
PT05.09.2022
Former [2022/50]AT04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
PL04.05.2022
RS04.05.2022
SE04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
PT05.09.2022
Former [2022/49]AT04.05.2022
ES04.05.2022
FI04.05.2022
HR04.05.2022
LT04.05.2022
LV04.05.2022
NL04.05.2022
SE04.05.2022
BG04.08.2022
NO04.08.2022
GR05.08.2022
PT05.09.2022
Former [2022/48]AT04.05.2022
ES04.05.2022
FI04.05.2022
LT04.05.2022
NL04.05.2022
SE04.05.2022
NO04.08.2022
PT05.09.2022
Former [2022/47]AT04.05.2022
ES04.05.2022
FI04.05.2022
LT04.05.2022
SE04.05.2022
NO04.08.2022
PT05.09.2022
Cited inInternational search[YA]US5729143  (TAVERNETTI RUSSELL E [US], et al) [Y] 2,3 * figure 1a * [A] 1,4-14;
 [XAY]EP1092988  (HILTI AG [LI]) [X] 1,4,5,10 * paragraph [0001] * * paragraph [0007] * * paragraph [0010] * * paragraph [0016] * * figures 1-13 * [A] 6,8,11,13 [Y] 2,3,7,9,12,14;
 [YA]EP1298457  (HILTI AG [LI]) [Y] 9,14 * paragraph [0021] * [A] 1-8,10-13;
 [A]WO2006037176  (ROBERTS KENNETH BRIAN [AU], et al) [A] 1-14 * page 4, line 11 - page 5, line 28 ** page 15, line 10 - line 32 *;
 [YA]US2010164512  (KISS MICHAEL [AT], et al) [Y] 7,12 * paragraph [0059] * [A] 1-6,8-11,13,14
ExaminationUS2010186504
by applicantUS7355410
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.