EP3586547 - METHODS AND APPARATUSES FOR HANDLING SLICE SELECTION DATA FOR A USER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.04.2021 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 15.05.2020 | ||
Former | Grant of patent is intended Status updated on 08.03.2020 | ||
Former | Request for examination was made Status updated on 05.12.2019 | ||
Former | The international publication has been made Status updated on 01.09.2018 | ||
Former | unknown Status updated on 10.03.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2020/01] | Inventor(s) | 01 /
CASTELLANOS ZAMORA, David C/ Embajadores 256 No.1B 28045 Madrid / ES | 02 /
ALONSO ALARCON, Antonio c/Fernandez de la Hoz 58 6-D 28010 Madrid / ES | 03 /
BAS SANCHEZ, Maria Esther C/ Alcantara 52 3 C 28006 Madrid / ES | 04 /
CASTILLO CASERO, Trinidad Avda. Constitución 53 28850 Madrid / ES | [2020/09] |
Former [2020/01] | 01 /
CASTELLANOS ZAMORA, David C/ Embajadores 256 No.1B 28045 Madrid / ES | ||
02 /
ALONSO ALARCON, Antonio c/Fernandez de la Hoz 48 6-D 28010 Madrid / ES | |||
03 /
BAS SANCHEZ, Maria Esther C/ Alcantara 52 3 C 28006 Madrid / ES | |||
04 /
CASTILLO CASERO, Trinidad Avda. Constitución 53 28850 Madrid / ES | Representative(s) | Brann AB P.O. Box 3690 Sveavägen 63 103 59 Stockholm / SE | [N/P] |
Former [2020/01] | Brann AB P.O. Box 3690 Drottninggatan 27 103 59 Stockholm / SE | Application number, filing date | 17707803.7 | 24.02.2017 | [2020/01] | WO2017EP54294 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018153470 | Date: | 30.08.2018 | Language: | EN | [2018/35] | Type: | A1 Application with search report | No.: | EP3586547 | Date: | 01.01.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.08.2018 takes the place of the publication of the European patent application. | [2020/01] | Type: | B1 Patent specification | No.: | EP3586547 | Date: | 17.06.2020 | Language: | EN | [2020/25] | Search report(s) | International search report - published on: | EP | 30.08.2018 | Classification | IPC: | H04W48/18, // H04W8/18, H04L12/911, H04W92/24 | [2020/14] | CPC: |
H04W48/18 (EP,US);
H04W8/20 (US);
H04W60/04 (US);
H04W8/04 (US);
H04L47/78 (EP);
H04W8/18 (EP);
H04W92/24 (EP)
(-)
|
Former IPC [2020/01] | H04W48/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNGEN ZUR HANDHABUNG VON SLICE-AUSWAHLDATEN FÜR EINEN BENUTZER | [2020/01] | English: | METHODS AND APPARATUSES FOR HANDLING SLICE SELECTION DATA FOR A USER | [2020/01] | French: | PROCÉDÉS ET APPAREILS DE GESTION DE DONNÉES DE SÉLECTION DE TRANCHE POUR UN UTILISATEUR | [2020/01] | Entry into regional phase | 11.09.2019 | National basic fee paid | 11.09.2019 | Designation fee(s) paid | 11.09.2019 | Examination fee paid | Examination procedure | 11.09.2019 | Amendment by applicant (claims and/or description) | 11.09.2019 | Examination requested [2020/01] | 11.09.2019 | Date on which the examining division has become responsible | 09.03.2020 | Communication of intention to grant the patent | 11.05.2020 | Fee for grant paid | 11.05.2020 | Fee for publishing/printing paid | 11.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 18.03.2021 | No opposition filed within time limit [2021/21] | Fees paid | Renewal fee | 30.08.2019 | Renewal fee patent year 03 | 27.02.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.02.2017 | AL | 17.06.2020 | AT | 17.06.2020 | CY | 17.06.2020 | CZ | 17.06.2020 | DK | 17.06.2020 | EE | 17.06.2020 | ES | 17.06.2020 | FI | 17.06.2020 | HR | 17.06.2020 | IT | 17.06.2020 | LT | 17.06.2020 | LV | 17.06.2020 | MC | 17.06.2020 | MK | 17.06.2020 | NL | 17.06.2020 | PL | 17.06.2020 | RO | 17.06.2020 | RS | 17.06.2020 | SE | 17.06.2020 | SI | 17.06.2020 | SK | 17.06.2020 | SM | 17.06.2020 | BG | 17.09.2020 | NO | 17.09.2020 | GR | 18.09.2020 | IS | 17.10.2020 | PT | 19.10.2020 | IE | 24.02.2021 | LU | 24.02.2021 | BE | 28.02.2021 | CH | 28.02.2021 | FR | 28.02.2021 | LI | 28.02.2021 | [2024/22] |
Former [2023/41] | HU | 24.02.2017 | |
AL | 17.06.2020 | ||
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/33] | HU | 24.02.2017 | |
AL | 17.06.2020 | ||
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/30] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/33] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/07] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/47] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
LU | 24.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/41] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/21] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/10] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/09] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
PT | 19.10.2020 | ||
Former [2021/04] | AL | 17.06.2020 | |
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2021/01] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/51] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/50] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/48] | FI | 17.06.2020 | |
LT | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
Former [2020/47] | LT | 17.06.2020 | |
NO | 17.09.2020 | Cited in | International search | [XI]WO2015182111 (NEC CORP [JP]) [X] 13,14,17,19-21,23-27,30,32-34,36-42 * figures 2,3,7 * * paragraphs [0033] - [0036] * * paragraph [0038] * * paragraphs [0044] - [0045] * [I] 15,18,22,28,31,35; | [XI]US2016353367 (VRZIC SOPHIE [CA], et al) [X] 20,21,23-25,33,34,36-38,41,42 * paragraph [0056] * * paragraph [0097] * * figure 5 * [I] 22,35; | [XI] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Architecture Enhancements for Dedicated Core Networks; Stage 2 (Release 13)", 3GPP STANDARD; 3GPP TR 23.707, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20141216), vol. SA WG2, no. V13.0.0, pages 1 - 39, XP050926977 [X] 10-14,17-23,25-27,30-36,38-42 * section 5.1.1.1.1; page 8 * * section 5.2.1.1.2; pages 9-11 * [I] 15,24,28,37 | [XDI] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on Architecture for Next Generation System (Release 14)", 3GPP STANDARD; 3GPP TR 23.799, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20161216), vol. SA WG2, no. V14.0.0, pages 1 - 522, XP051230010 [XD] 13,14,17,19-21,23-27,30,32-34,36-42 * section 5.1.1; page 24 * * sections 6.1.1.1, 6.1.1.2; pages 51-55 * * figure 6.1.1.1.2 * * section 6.1.11.2.1; pages 102-104 * * figure 6.1.11.2.1.1 * [I] 15,18,22,28,31,35 | [XI] - ORANGE, "Next Generation System Session Management Support for Energy Efficiency", vol. TSG SA, no. Vienna Austria; 20161207 - 20161209, (20161206), 3GPP DRAFT; SP-160934 - EE SOLUTIONS FOR NEXTGEN SM, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/SA/Docs/, (20161206), XP051187426 [X] 13,14,17,19-21,23-27,30,32-34,36-42 * section 5.X.2; page 3 * * figure 5.x.2.1 * [I] 15,18,22,28,31,35 | [AD] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access (Release 14)", 3GPP STANDARD; 3GPP TS 23.401, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20161216), vol. SA WG2, no. V14.2.0, pages 1 - 385, XP051230002 [AD] 1-42 * section 4.3.25; pages 74-76 * * sections 5.19.1 - 5.19.2; pages 313-316 * |