blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3590301

EP3590301 - D2D COMMUNICATIONS IN A CELLULAR NETWORK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.05.2022
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  18.06.2021
FormerGrant of patent is intended
Status updated on  16.05.2021
FormerRequest for examination was made
Status updated on  06.12.2019
FormerThe international publication has been made
Status updated on  11.09.2018
Formerunknown
Status updated on  11.03.2017
Most recent event   Tooltip10.05.2024Lapse of the patent in a contracting state
New state(s): HU
published on 12.06.2024  [2024/24]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (Publ)
164 83 Stockholm / SE
[2021/29]
Former [2020/02]For all designated states
Telefonaktiebolaget LM Ericsson (Publ)
164 83 Stockholm / SE
Inventor(s)01 / LINCOLN, Bo
Målarevägen 37
S-227 30 Lund / SE
02 / FODOR, Gabor
Astrakangatan 124
S-165 52 Hässelby / SE
03 / GUNNARSSON, Fredrik
Tinnerbäcksgränd 28
S-587 50 Linköping / SE
04 / WALLÈN, Anders
Tegnergatan 24
S-271 31 Ystad / SE
05 / KRONANDER, Jonas
Svanvägen 33
S-741 42 Knivsta / SE
06 / BJÖRKEGREN, Håkan
Manganvägen 32
S-187 46 Täby / SE
 [2020/02]
Representative(s)Zacco Sweden AB
P.O. Box 5581
Löjtnantsgatan 21
114 85 Stockholm / SE
[N/P]
Former [2021/29]Zacco Sweden AB
Valhallavägen 117
Box 5581
114 85 Stockholm / SE
Former [2020/02]Brann AB
P.O. Box 3690
Drottninggatan 27
103 59 Stockholm / SE
Application number, filing date17708224.501.03.2017
[2020/02]
WO2017EP54746
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018157924
Date:07.09.2018
Language:EN
[2018/36]
Type: A1 Application with search report 
No.:EP3590301
Date:08.01.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 07.09.2018 takes the place of the publication of the European patent application.
[2020/02]
Type: B1 Patent specification 
No.:EP3590301
Date:21.07.2021
Language:EN
[2021/29]
Search report(s)International search report - published on:EP07.09.2018
ClassificationIPC:H04W76/14, H04W4/08
[2021/22]
CPC:
H04W4/08 (EP,US); H04W24/10 (US); H04W4/70 (US);
H04W76/14 (EP,US); Y02D30/70 (US)
Former IPC [2020/02]H04W76/10
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/02]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:D2D KOMMUNIKATION IN EINEM ZELLULAREN NETZWERK[2020/02]
English:D2D COMMUNICATIONS IN A CELLULAR NETWORK[2020/02]
French:COMMUNICATIONS D2D DANS UN RÉSEAU CELLULAIRE[2020/02]
Entry into regional phase27.09.2019National basic fee paid 
27.09.2019Designation fee(s) paid 
27.09.2019Examination fee paid 
Examination procedure27.09.2019Examination requested  [2020/02]
27.09.2019Date on which the examining division has become responsible
21.04.2020Amendment by applicant (claims and/or description)
17.05.2021Communication of intention to grant the patent
15.06.2021Fee for grant paid
15.06.2021Fee for publishing/printing paid
15.06.2021Receipt of the translation of the claim(s)
Opposition(s)22.04.2022No opposition filed within time limit [2022/26]
Fees paidRenewal fee
17.09.2019Renewal fee patent year 03
27.03.2020Renewal fee patent year 04
29.03.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.03.2017
AL21.07.2021
AT21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
MK21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE01.03.2022
LU01.03.2022
BE31.03.2022
CH31.03.2022
FR31.03.2022
LI31.03.2022
[2024/24]
Former [2024/22]AL21.07.2021
AT21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
MK21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE01.03.2022
LU01.03.2022
BE31.03.2022
CH31.03.2022
FR31.03.2022
LI31.03.2022
Former [2024/20]AL21.07.2021
AT21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE01.03.2022
LU01.03.2022
BE31.03.2022
CH31.03.2022
FR31.03.2022
LI31.03.2022
Former [2023/10]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE01.03.2022
LU01.03.2022
BE31.03.2022
CH31.03.2022
FR31.03.2022
LI31.03.2022
Former [2023/09]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE01.03.2022
LU01.03.2022
CH31.03.2022
FR31.03.2022
LI31.03.2022
Former [2023/08]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE01.03.2022
LU01.03.2022
FR31.03.2022
Former [2023/06]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
FR31.03.2022
Former [2022/47]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/36]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/29]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/25]AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/24]AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SK21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/21]AT21.07.2021
DK21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
PL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/11]AT21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
PL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/09]AT21.07.2021
ES21.07.2021
FI21.07.2021
LT21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
PT22.11.2021
Former [2022/08]AT21.07.2021
ES21.07.2021
FI21.07.2021
LT21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
Former [2022/07]AT21.07.2021
LT21.07.2021
NO21.10.2021
Cited inInternational search[X]WO2016163972  (INTEL CORP [US]) [X] 1-33* paragraphs [0023] - [0033] - [0039] - [0055] - [0081] - [0163]; figures 1-13 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.