blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3423672

EP3423672 - SEQUENTIAL FULLY IMPLICIT WELL MODEL WITH TRIDIAGONAL MATRIX STRUCTURE FOR RESERVOIR SIMULATION [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  08.09.2023
Database last updated on 13.09.2024
FormerExamination is in progress
Status updated on  10.06.2021
FormerRequest for examination was made
Status updated on  07.12.2018
FormerThe international publication has been made
Status updated on  08.09.2017
Formerunknown
Status updated on  27.03.2017
Most recent event   Tooltip08.09.2023Application deemed to be withdrawnpublished on 11.10.2023  [2023/41]
Applicant(s)For all designated states
Saudi Arabian Oil Company
1 Eastern Avenue
31311 Dhahran / SA
[2019/02]
Inventor(s)01 / DOGRU, Ali, H.
Saudi Arabian Oil Company
P.O. Box 1320 - SaudiAramco
Dhahran 31311 / SA
 [2019/02]
Representative(s)Marks & Clerk LLP
15 Fetter Lane
London EC4A 1BW / GB
[N/P]
Former [2019/02]Williams, Michael David
Marks & Clerk LLP
1 New York Street
Manchester M1 4HD / GB
Application number, filing date17711453.502.03.2017
[2019/02]
WO2017US20318
Priority number, dateUS20161506157204.03.2016         Original published format: US201615061572
[2019/02]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017151838
Date:08.09.2017
Language:EN
[2017/36]
Type: A1 Application with search report 
No.:EP3423672
Date:09.01.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 08.09.2017 takes the place of the publication of the European patent application.
[2019/02]
Search report(s)International search report - published on:EP08.09.2017
ClassificationIPC:E21B41/00, E21B49/00
[2019/02]
CPC:
E21B49/00 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/02]
TitleGerman:SEQUENTIELLES VOLLSTÄNDIG IMPLIZITES BOHRLOCHMODELL MIT TRIDIAGONALER MATRIXSTRUKTUR FÜR RESERVOIRSIMULATION[2019/02]
English:SEQUENTIAL FULLY IMPLICIT WELL MODEL WITH TRIDIAGONAL MATRIX STRUCTURE FOR RESERVOIR SIMULATION[2019/02]
French:MODÈLE DE PUITS SÉQUENTIEL ENTIÈREMENT IMPLICITE AVEC STRUCTURE DE MATRICE TRIDIAGONALE POUR SIMULATION DE RÉSERVOIR[2019/02]
Entry into regional phase06.09.2018National basic fee paid 
06.09.2018Designation fee(s) paid 
06.09.2018Examination fee paid 
Examination procedure06.09.2018Amendment by applicant (claims and/or description)
06.09.2018Examination requested  [2019/02]
06.09.2018Date on which the examining division has become responsible
09.06.2021Despatch of a communication from the examining division (Time limit: M06)
17.12.2021Reply to a communication from the examining division
03.01.2023Despatch of a communication from the examining division (Time limit: M04)
16.05.2023Application deemed to be withdrawn, date of legal effect  [2023/41]
07.06.2023Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2023/41]
Fees paidRenewal fee
13.03.2019Renewal fee patent year 03
12.03.2020Renewal fee patent year 04
12.03.2021Renewal fee patent year 05
14.01.2022Renewal fee patent year 06
21.03.2023Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]GB2458205  (LOGINED BV [NL]) [A] 1-38 * abstract * * figures 1-4 * * page 4, line 18 - page 5, line 10 * * page 5, line 28 - page 6, line 13 * * page 8, line 22 - page 9, line 20 * * page 10, line 14 - line 27 *;
 [A]US2009299714  (KELKAR MOHAN [US], et al) [A] 1-38 * abstract * * figures 1-7 * * paragraph [0046] - paragraph [0049] * * paragraph [0054] - paragraph [0057] *;
 [XI]US2012203518  (DOGRU ALI H [SA]) [X] 21,22,25-28,30-35,37,38 * abstract * * figures 1-16 * * paragraph [0008] - paragraph [0010] * * paragraph [0099] - paragraph [0108] * [I] 1-19,23,24,29,36;
 [A]  - LARRY S.K. FUNG ET AL, "A Fully-Implicit Fully-Coupled Well Model for Parallel Mega-Cell Reservoir Simulation", SPE TECHNICAL SYMPOSIUM OF SAUDI ARABIA SECTION, (20050101), doi:10.2118/106331-MS, pages 14 - 16, XP055292573 [A] 1-38 * abstract * * Introduction * * Well Model Formulation * * Solution Method *

DOI:   http://dx.doi.org/10.2118/106331-MS
by applicant   - CHEN; ZHANG, "Well Flow Models for Various Numerical Methods", INTERNATIONAL JOURNAL OF NUMERICAL ANALYSIS AND MODELING, vol. 6, no. 3, pages 378 - 388
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.