EP3532209 - ADAPTER FOR FLUID DISPENSING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.05.2023 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 03.06.2022 | ||
Former | Grant of patent is intended Status updated on 27.03.2022 | ||
Former | Examination is in progress Status updated on 18.12.2020 | ||
Former | Request for examination was made Status updated on 02.08.2019 | ||
Former | The international publication has been made Status updated on 05.05.2018 | ||
Former | unknown Status updated on 04.04.2017 | Most recent event Tooltip | 16.02.2024 | Lapse of the patent in a contracting state New state(s): BE, FR, IT | published on 20.03.2024 [2024/12] | Applicant(s) | For all designated states Husqvarna AB Drottninggatan 2 561 82 Huskvarna / SE | [2019/36] | Inventor(s) | 01 /
KISTLER, Michael Stöcklesäcker 32 89185 Hüttisheim / DE | 02 /
MAAG, Markus Margarete-Steiff-Strasse 33 89081 Ulm / DE | [2022/27] |
Former [2019/37] | 01 /
KISTLER, Michael Stöcklesäcker 32 89185 Hüttisheim / DE | ||
02 /
MAAG, Markus Margarete Steiffstrasse 33 89081 Ulm / DE | |||
Former [2019/36] | 01 /
KISTLER, Michael Neubronnerweg 7 89077 Ulm / DE | ||
02 /
MAAG, Markus Margarete Steiffstrasse 33 89081 Ulm / DE | Representative(s) | Finkele, Rolf Gardena Manufacturing GmbH Hans-Lorenser-Straße 40 89079 Ulm / DE | [2019/36] | Application number, filing date | 17713006.9 | 23.03.2017 | [2019/36] | WO2017EP56958 | Priority number, date | DE20161012920 | 27.10.2016 Original published format: DE102016012920 | [2019/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018077486 | Date: | 03.05.2018 | Language: | EN | [2018/18] | Type: | A1 Application with search report | No.: | EP3532209 | Date: | 04.09.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.05.2018 takes the place of the publication of the European patent application. | [2019/36] | Type: | B1 Patent specification | No.: | EP3532209 | Date: | 06.07.2022 | Language: | EN | [2022/27] | Search report(s) | International search report - published on: | EP | 03.05.2018 | Classification | IPC: | B05B15/65, F16L3/237, F16L41/02 | [2022/11] | CPC: |
B05B15/65 (EP,CN);
B05B9/01 (EP,CN);
B05B12/002 (CN);
B05B15/62 (CN);
B25G3/26 (EP);
F16L3/237 (EP);
|
Former IPC [2019/36] | B05B15/60, F16L3/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ADAPTER FÜR FLÜSSIGKEITSAUSGABESYSTEM | [2019/36] | English: | ADAPTER FOR FLUID DISPENSING SYSTEM | [2019/36] | French: | ADAPTATEUR POUR SYSTÈME DE DISTRIBUTION DE FLUIDE | [2019/36] | Entry into regional phase | 25.03.2019 | National basic fee paid | 25.03.2019 | Designation fee(s) paid | 25.03.2019 | Examination fee paid | Examination procedure | 01.08.2018 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 25.03.2019 | Amendment by applicant (claims and/or description) | 25.03.2019 | Examination requested [2019/36] | 25.03.2019 | Date on which the examining division has become responsible | 21.12.2020 | Despatch of a communication from the examining division (Time limit: M04) | 14.04.2021 | Reply to a communication from the examining division | 18.08.2021 | Despatch of a communication from the examining division (Time limit: M04) | 29.10.2021 | Reply to a communication from the examining division | 28.03.2022 | Communication of intention to grant the patent | 30.05.2022 | Fee for grant paid | 30.05.2022 | Fee for publishing/printing paid | 30.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 11.04.2023 | No opposition filed within time limit [2023/24] | Fees paid | Renewal fee | 25.03.2019 | Renewal fee patent year 03 | 03.03.2020 | Renewal fee patent year 04 | 09.03.2021 | Renewal fee patent year 05 | 09.03.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 06.07.2022 | AT | 06.07.2022 | CZ | 06.07.2022 | DK | 06.07.2022 | EE | 06.07.2022 | ES | 06.07.2022 | FI | 06.07.2022 | HR | 06.07.2022 | IT | 06.07.2022 | LT | 06.07.2022 | LV | 06.07.2022 | MC | 06.07.2022 | NL | 06.07.2022 | PL | 06.07.2022 | RO | 06.07.2022 | RS | 06.07.2022 | SE | 06.07.2022 | SI | 06.07.2022 | SK | 06.07.2022 | SM | 06.07.2022 | NO | 06.10.2022 | GR | 07.10.2022 | IS | 06.11.2022 | PT | 07.11.2022 | GB | 23.03.2023 | IE | 23.03.2023 | LU | 23.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | FR | 31.03.2023 | LI | 31.03.2023 | [2024/11] |
Former [2024/09] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
GB | 23.03.2023 | ||
IE | 23.03.2023 | ||
LU | 23.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/08] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
GB | 23.03.2023 | ||
IE | 23.03.2023 | ||
LU | 23.03.2023 | ||
Former [2024/02] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
LU | 23.03.2023 | ||
Former [2023/48] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/37] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/29] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/23] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/22] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/21] | DK | 06.07.2022 | |
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/20] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/12] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/11] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/10] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/09] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/08] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
Former [2023/06] | NL | 06.07.2022 | Cited in | International search | [XI]US5395054 (WHEELER ROGER D [US]) [X] 9-13 * abstract * * column 3, line 61 - column 4, line 12 * [I] 14,15; | [XI]EP1004263 (PROCTER & GAMBLE [US]) [X] 1-3 * abstract * * column 4, paragraph 17 - column 9, paragraph 34 * [I] 4,5; | [X]US2011308192 (KODI JON R [US]) [X] 9-12,14,15* abstract *; | [A]US2014117178 (VARTANIAN VAGHARSHAK [US], et al) [A] 1-8 * abstract * * page 1, paragraph 10 - page 2, paragraph 28 *; | [XI]WO2015087805 (HONDA MOTOR CO LTD [JP]) [X] 9-13 * abstract * [I] 14,15 | by applicant | CN201558777U |