EP3436383 - LIFT SYSTEM WITH CENTRAL CONTROL UNIT AND A PLURALITY OF FIELD DEVICES COMMUNICATING OVER A SUM FRAME METHOD [Right-click to bookmark this link] | |||
Former [2019/06] | LIFT SYSTEM HAVING A CENTRAL CONTROL UNIT AND A PLURALITY OF FIELD DEVICES WHICH COMMUNICATE VIA A SUMMATION FRAME METHOD | ||
[2020/36] | Status | No opposition filed within time limit Status updated on 12.11.2021 Database last updated on 22.05.2024 | |
Former | The patent has been granted Status updated on 04.12.2020 | ||
Former | Grant of patent is intended Status updated on 26.08.2020 | ||
Former | Request for examination was made Status updated on 04.01.2019 | ||
Former | The international publication has been made Status updated on 07.10.2017 | ||
Former | unknown Status updated on 04.04.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Inventio AG Seestrasse 55 6052 Hergiswil / CH | [2021/01] |
Former [2019/06] | For all designated states Inventio AG Seestrasse 55 6052 Hergiswil / CH | Inventor(s) | 01 /
SONNENMOSER, Astrid Oberfeldhöhe 3 6280 Hochdorf / CH | 02 /
MICHEL, David Weihermatt 6 6343 Rotkreuz / CH | 03 /
ROUSSEL, Frank Olivier Oberseeburg 45 6006 Luzern / CH | 04 /
LUSTENBERGER, Ivo Sebaldematt 36 6018 Buttisholz / CH | 05 /
HEINZ, Kurt Ringstrasse 27 8107 Buchs / CH | 06 /
HARTMANN, Thomas Mühleweg 1 6277 Kleinwangen / CH | 07 /
HESS, Martin Neufeldweg 12 6340 Baar / CH | [2019/06] | Application number, filing date | 17713026.7 | 28.03.2017 | [2019/06] | WO2017EP57262 | Priority number, date | EP20160163020 | 30.03.2016 Original published format: EP 16163020 | [2019/06] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017167720 | Date: | 05.10.2017 | Language: | DE | [2017/40] | Type: | A1 Application with search report | No.: | EP3436383 | Date: | 06.02.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 05.10.2017 takes the place of the publication of the European patent application. | [2019/06] | Type: | B1 Patent specification | No.: | EP3436383 | Date: | 06.01.2021 | Language: | DE | [2021/01] | Search report(s) | International search report - published on: | EP | 05.10.2017 | Classification | IPC: | B66B1/34, H04L12/423 | [2019/06] | CPC: |
B66B1/3423 (EP,US);
B66B1/3446 (EP,US);
B66B13/22 (US);
B66B5/0031 (US);
H04L12/423 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/06] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | AUFZUGANLAGE MIT ZENTRALER STEUEREINHEIT UND MEHREREN FELDGERÄTEN, WELCHE ÜBER EIN SUMMENRAHMENVERFAHREN KOMMUNIZIEREN | [2019/06] | English: | LIFT SYSTEM WITH CENTRAL CONTROL UNIT AND A PLURALITY OF FIELD DEVICES COMMUNICATING OVER A SUM FRAME METHOD | [2020/36] | French: | ASCENSEUR COMPRENANT UNE UNITE DE COMMANDE CENTRALE ET PLUSIEURS APPAREILS DE CHAMP COMMUNIQUANT SELON UN PROCEDE DE TRAME UNIQUE | [2020/36] |
Former [2019/06] | LIFT SYSTEM HAVING A CENTRAL CONTROL UNIT AND A PLURALITY OF FIELD DEVICES WHICH COMMUNICATE VIA A SUMMATION FRAME METHOD | ||
Former [2019/06] | INSTALLATION D'ASCENSEUR ÉQUIPÉE D'UNE UNITÉ DE COMMANDE CENTRALE ET DE PLUSIEURS APPAREILS DE TERRAIN COMMUNIQUANT PAR UNE MÉTHODE DE TRAME CUMULATIVE | Entry into regional phase | 30.08.2018 | National basic fee paid | 30.08.2018 | Designation fee(s) paid | 30.08.2018 | Examination fee paid | Examination procedure | 30.08.2018 | Examination requested [2019/06] | 30.08.2018 | Date on which the examining division has become responsible | 20.02.2019 | Amendment by applicant (claims and/or description) | 27.08.2020 | Communication of intention to grant the patent | 01.12.2020 | Fee for grant paid | 01.12.2020 | Fee for publishing/printing paid | 01.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.10.2021 | No opposition filed within time limit [2021/50] | Fees paid | Renewal fee | 26.03.2019 | Renewal fee patent year 03 | 24.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.03.2017 | AL | 06.01.2021 | CY | 06.01.2021 | CZ | 06.01.2021 | DK | 06.01.2021 | EE | 06.01.2021 | ES | 06.01.2021 | FI | 06.01.2021 | HR | 06.01.2021 | IT | 06.01.2021 | LT | 06.01.2021 | LV | 06.01.2021 | MC | 06.01.2021 | MK | 06.01.2021 | PL | 06.01.2021 | RO | 06.01.2021 | RS | 06.01.2021 | SE | 06.01.2021 | SI | 06.01.2021 | SK | 06.01.2021 | SM | 06.01.2021 | NL | 06.02.2021 | IE | 28.03.2021 | LU | 28.03.2021 | BE | 31.03.2021 | BG | 06.04.2021 | NO | 06.04.2021 | GR | 07.04.2021 | IS | 06.05.2021 | PT | 06.05.2021 | [2024/22] |
Former [2023/33] | HU | 28.03.2017 | |
AL | 06.01.2021 | ||
CY | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
NL | 06.02.2021 | ||
IE | 28.03.2021 | ||
LU | 28.03.2021 | ||
BE | 31.03.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2023/30] | AL | 06.01.2021 | |
CY | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
NL | 06.02.2021 | ||
IE | 28.03.2021 | ||
LU | 28.03.2021 | ||
BE | 31.03.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2023/29] | AL | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
NL | 06.02.2021 | ||
IE | 28.03.2021 | ||
LU | 28.03.2021 | ||
BE | 31.03.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2022/34] | AL | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 28.03.2021 | ||
LU | 28.03.2021 | ||
BE | 31.03.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2022/23] | AL | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 28.03.2021 | ||
LU | 28.03.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2022/13] | AL | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 28.03.2021 | ||
LU | 28.03.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2022/10] | AL | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 28.03.2021 | ||
LU | 28.03.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2022/08] | AL | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 28.03.2021 | ||
LU | 28.03.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2022/07] | AL | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 28.03.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/50] | CZ | 06.01.2021 | |
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/49] | CZ | 06.01.2021 | |
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/48] | CZ | 06.01.2021 | |
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/46] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/45] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/42] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/39] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/38] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/37] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
RS | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/36] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/35] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
NO | 06.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/33] | FI | 06.01.2021 | |
LT | 06.01.2021 | ||
NO | 06.04.2021 | ||
PT | 06.05.2021 | Cited in | International search | [A]EP0755012 (SUN MICROSYSTEMS INC [US]) [A] 1-15* abstract *; | [YA]US2009299503 (OSTER VIKTOR [DE], et al) [Y] 1,2,10-15 * paragraph [0023]; figure 1 * [A] 3-9; | [YA]WO2011001197 (OTIS ELEVATOR CO [US], et al) [Y] 1,2,10-15 * page 3, line 26 - page 4, line 4 * * page 6, line 4 - page 7, line 5 * * figure 1 * [A] 3-9; | [A]EP2961106 (BECKHOFF AUTOMATION GMBH [DE]) [A] 1-15 * abstract * | by applicant | EP2251293 | WO2011001197 |