EP3585952 - SELF-STANDING AND SELF-ISOLATING BUILDING SUPERSTRUCTURE WITH VACUUM SHELL OF AIR, ELECTRICITY ACCUMULATOR [Right-click to bookmark this link] | |||
Former [2020/01] | SEMI-MOBILE SELF-STANDING BUILDING SUPERSTRUCTURE WITH SELF-INSULATING ELECTRICITY-ACCUMULATING EVACUATED VOLUME | ||
[2021/40] | Status | No opposition filed within time limit Status updated on 27.01.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 18.02.2022 | ||
Former | Grant of patent is intended Status updated on 03.10.2021 | ||
Former | Examination is in progress Status updated on 02.04.2021 | ||
Former | Request for examination was made Status updated on 05.12.2019 | ||
Former | The international publication has been made Status updated on 29.09.2017 | ||
Former | unknown Status updated on 04.04.2017 | Most recent event Tooltip | 29.09.2023 | Lapse of the patent in a contracting state New state(s): MC | published on 01.11.2023 [2023/44] | Applicant(s) | For all designated states Chavanne, Bruno 12, route du Val d'Indrois 37310 Azay-sur-Indre / FR | [2020/01] | Inventor(s) | 01 /
see applicant ... | [2020/01] | Application number, filing date | 17713162.0 | 21.02.2017 | [2020/01] | WO2017EP53917 | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2017162388 | Date: | 28.09.2017 | Language: | FR | [2017/39] | Type: | A1 Application with search report | No.: | EP3585952 | Date: | 01.01.2020 | Language: | FR | The application published by WIPO in one of the EPO official languages on 28.09.2017 takes the place of the publication of the European patent application. | [2020/01] | Type: | B1 Patent specification | No.: | EP3585952 | Date: | 23.03.2022 | Language: | FR | [2022/12] | Search report(s) | International search report - published on: | EP | 28.09.2017 | Classification | IPC: | E04B1/35, E04B1/74 | [2020/01] | CPC: |
E04B1/35 (EP);
E04B1/34384 (US);
A01G9/16 (US);
A01G9/243 (US);
E04B1/644 (US);
E04B1/74 (EP);
E04B1/803 (EP);
E04B1/88 (US);
E04B1/92 (US);
E04C5/00 (US);
E04H9/021 (EP,US);
E04B2001/742 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | 21.08.2019 | Title | German: | SELBSTSTEHENDER UND SELBSTISOLIERENDER GEBÄUDEAUFBAU MIT VAKUUMHÜLLE, AKKUSTROM | [2021/40] | English: | SELF-STANDING AND SELF-ISOLATING BUILDING SUPERSTRUCTURE WITH VACUUM SHELL OF AIR, ELECTRICITY ACCUMULATOR | [2021/40] | French: | SUPERSTRUCTURE DE BÂTIMENT AUTOSTABLE SEMI-MOBILE, A VOLUME SOUS VIDE AUTO-ISOLANT, ACCUMULATEUR D'ÉLECTRICITÉ. | [2020/01] |
Former [2020/01] | HALBMOBILE SELBSTSTEHENDE GEBÄUDEÜBERSTRUKTUR MIT SELBSTISOLIERENDEM ELEKTRIZITÄTSAKKUMULIERENDEM EVAKUIERTEM VOLUMEN | ||
Former [2020/01] | SEMI-MOBILE SELF-STANDING BUILDING SUPERSTRUCTURE WITH SELF-INSULATING ELECTRICITY-ACCUMULATING EVACUATED VOLUME | Entry into regional phase | 21.08.2019 | National basic fee paid | 21.08.2019 | Designation fee(s) paid | 21.08.2019 | Examination fee paid | Examination procedure | 21.08.2019 | Examination requested [2020/01] | 21.08.2019 | Date on which the examining division has become responsible | 07.09.2019 | Amendment by applicant (claims and/or description) | 01.04.2021 | Despatch of a communication from the examining division (Time limit: M04) | 07.07.2021 | Reply to a communication from the examining division | 04.10.2021 | Communication of intention to grant the patent | 13.01.2022 | Fee for grant paid | 13.01.2022 | Fee for publishing/printing paid | 13.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 02.01.2023 | No opposition filed within time limit [2023/09] | Fees paid | Renewal fee | 21.08.2019 | Renewal fee patent year 03 | 14.08.2020 | Renewal fee patent year 04 | 18.02.2021 | Renewal fee patent year 05 | 14.02.2022 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 29.02.2020 | 04   M06   Fee paid on   14.08.2020 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 23.03.2022 | AT | 23.03.2022 | CZ | 23.03.2022 | DK | 23.03.2022 | EE | 23.03.2022 | ES | 23.03.2022 | FI | 23.03.2022 | HR | 23.03.2022 | IT | 23.03.2022 | LT | 23.03.2022 | LV | 23.03.2022 | MC | 23.03.2022 | NL | 23.03.2022 | PL | 23.03.2022 | RO | 23.03.2022 | RS | 23.03.2022 | SE | 23.03.2022 | SI | 23.03.2022 | SK | 23.03.2022 | SM | 23.03.2022 | BG | 23.06.2022 | NO | 23.06.2022 | GR | 24.06.2022 | IS | 23.07.2022 | PT | 25.07.2022 | [2023/44] |
Former [2023/35] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
IT | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/25] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/07] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/01] | AL | 23.03.2022 | |
AT | 23.03.2022 | ||
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2022/51] | AT | 23.03.2022 | |
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2022/50] | AT | 23.03.2022 | |
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
PL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/49] | AT | 23.03.2022 | |
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/48] | AT | 23.03.2022 | |
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/47] | AT | 23.03.2022 | |
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/44] | FI | 23.03.2022 | |
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
Former [2022/39] | FI | 23.03.2022 | |
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
Former [2022/36] | HR | 23.03.2022 | |
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
Former [2022/35] | HR | 23.03.2022 | |
LT | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
Former [2022/33] | LT | 23.03.2022 | |
NO | 23.06.2022 | Cited in | International search | [A]WO9504197 (LINDSTROEM LENNART [SE], et al) [A] 1-26 * page 1, line 31 - page 4, line 34; figures 2, 12 *; | [A]US2015064375 (KUNSTADT ROBERT [US]) [A] 1* the whole document * | by applicant | FR2880639 | WO2013088075 | WO2013088077 | WO2014012837 | EP2860320 | WO2015135656 | WO2015155438 | WO2016165984 |