EP3443411 - DEVICE FOR GENERATING A BEAM OF PHOTONS WITH WAVELENGTHS DEFINING A SUBSTANTIALLY CONTINUOUS SUPERCONTINUUM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.11.2022 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 26.11.2021 | ||
Former | Grant of patent is intended Status updated on 21.07.2021 | ||
Former | Examination is in progress Status updated on 28.02.2020 | ||
Former | Request for examination was made Status updated on 18.01.2019 | ||
Former | The international publication has been made Status updated on 20.10.2017 | ||
Former | unknown Status updated on 10.04.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Centre National de la Recherche Scientifique 3, rue Michel-Ange 75016 Paris / FR | For all designated states Université de Limoges 33 Rue François Mitterand 87000 Limoges / FR | [2019/08] | Inventor(s) | 01 /
KRUPA, Katarzyna 27 Rue Bertrand de Born 87100 Limoges / FR | 02 /
SHALABY, Badr 1 Rue Marcel Madoumier 87100 Limoges / FR | 03 /
TONELLO, Alessandro 61 Boulevard Gambetta 87000 Limoges / FR | 04 /
COUDERC, Vincent 15 Rue du Haut Félix 87430 Verneuil-sur-Vienne / FR | [2021/33] |
Former [2019/08] | 01 /
KRUPA, Katarzyna 27 Rue Bertrand de Born 87100 LIMOGES / FR | ||
02 /
SHALABY, Badr 1 Rue Marcel Madoumier 87100 LIMOGES / FR | |||
03 /
TONELLO, Alessandro 61 Boulevard Gambetta 87000 LIMOGES / FR | |||
04 /
COUDERC, Vincent 15 Rue du Haut Félix 87430 VERNEUIL-SUR-VIENNE / FR | Representative(s) | Atout PI Laplace Immeuble Up On 25 Boulevard Romain Rolland CS 40072 75685 Paris Cedex 14 / FR | [N/P] |
Former [2021/52] | Marks & Clerk France Immeuble "Visium" 22, avenue Aristide Briand 94117 Arcueil Cedex / FR | ||
Former [2019/08] | Priori, Enrico Marks & Clerk France Immeuble "Visium" 22, avenue Aristide Briand 94117 Arcueil Cedex / FR | Application number, filing date | 17714481.3 | 31.03.2017 | [2019/08] | WO2017EP57760 | Priority number, date | FR20160053252 | 13.04.2016 Original published format: FR 1653252 | [2019/08] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2017178255 | Date: | 19.10.2017 | Language: | FR | [2017/42] | Type: | A1 Application with search report | No.: | EP3443411 | Date: | 20.02.2019 | Language: | FR | The application published by WIPO in one of the EPO official languages on 19.10.2017 takes the place of the publication of the European patent application. | [2019/08] | Type: | B1 Patent specification | No.: | EP3443411 | Date: | 29.12.2021 | Language: | FR | [2021/52] | Search report(s) | International search report - published on: | EP | 19.10.2017 | Classification | IPC: | G02F1/365 | [2019/08] | CPC: |
G02F1/365 (EP,US);
H01S3/302 (US);
H01S3/067 (US);
G02F1/3528 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VORRICHTUNG ZUR ERZEUGUNG EINES STRAHLS VON PHOTONEN MIT WELLENLÄNGEN, DIE EIN SUBSTANZIELL KONTINUIERLICHES SUPERKONTINUUM DEFINIEREN | [2019/08] | English: | DEVICE FOR GENERATING A BEAM OF PHOTONS WITH WAVELENGTHS DEFINING A SUBSTANTIALLY CONTINUOUS SUPERCONTINUUM | [2019/08] | French: | DISPOSITIF DE GÉNÉRATION D'UN FAISCEAU DE PHOTONS DE LONGUEURS D'ONDE DÉFINISSANT UN SUPERCONTINUUM SENSIBLEMENT CONTINU | [2019/08] | Entry into regional phase | 11.10.2018 | National basic fee paid | 11.10.2018 | Designation fee(s) paid | 11.10.2018 | Examination fee paid | Examination procedure | 11.10.2018 | Examination requested [2019/08] | 11.10.2018 | Date on which the examining division has become responsible | 13.05.2019 | Amendment by applicant (claims and/or description) | 04.03.2020 | Despatch of a communication from the examining division (Time limit: M04) | 30.06.2020 | Reply to a communication from the examining division | 27.10.2020 | Despatch of a communication from the examining division (Time limit: M04) | 11.02.2021 | Reply to a communication from the examining division | 22.07.2021 | Communication of intention to grant the patent | 17.11.2021 | Fee for grant paid | 17.11.2021 | Fee for publishing/printing paid | 17.11.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 30.09.2022 | No opposition filed within time limit [2022/49] | Fees paid | Renewal fee | 26.02.2019 | Renewal fee patent year 03 | 27.02.2020 | Renewal fee patent year 04 | 23.02.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.03.2017 | AL | 29.12.2021 | AT | 29.12.2021 | CY | 29.12.2021 | CZ | 29.12.2021 | DK | 29.12.2021 | EE | 29.12.2021 | ES | 29.12.2021 | FI | 29.12.2021 | HR | 29.12.2021 | IT | 29.12.2021 | LT | 29.12.2021 | LV | 29.12.2021 | MC | 29.12.2021 | MK | 29.12.2021 | NL | 29.12.2021 | PL | 29.12.2021 | RO | 29.12.2021 | RS | 29.12.2021 | SE | 29.12.2021 | SI | 29.12.2021 | SK | 29.12.2021 | SM | 29.12.2021 | BG | 29.03.2022 | NO | 29.03.2022 | GR | 30.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | IE | 31.03.2022 | LI | 31.03.2022 | LU | 31.03.2022 | IS | 29.04.2022 | PT | 29.04.2022 | [2024/22] |
Former [2024/20] | HU | 31.03.2017 | |
AL | 29.12.2021 | ||
AT | 29.12.2021 | ||
CY | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
IT | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
IE | 31.03.2022 | ||
LI | 31.03.2022 | ||
LU | 31.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2024/18] | HU | 31.03.2017 | |
AL | 29.12.2021 | ||
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
IT | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
IE | 31.03.2022 | ||
LI | 31.03.2022 | ||
LU | 31.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2023/27] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
IT | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
IE | 31.03.2022 | ||
LI | 31.03.2022 | ||
LU | 31.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2023/10] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
IE | 31.03.2022 | ||
LI | 31.03.2022 | ||
LU | 31.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2023/09] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
CH | 31.03.2022 | ||
IE | 31.03.2022 | ||
LI | 31.03.2022 | ||
LU | 31.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2023/08] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IE | 31.03.2022 | ||
LU | 31.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2022/49] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2022/47] | AT | 29.12.2021 | |
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2022/46] | AT | 29.12.2021 | |
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2022/42] | AT | 29.12.2021 | |
CZ | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2022/36] | AT | 29.12.2021 | |
CZ | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
PT | 29.04.2022 | ||
Former [2022/35] | CZ | 29.12.2021 | |
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
PT | 29.04.2022 | ||
Former [2022/34] | EE | 29.12.2021 | |
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
PT | 29.04.2022 | ||
Former [2022/33] | FI | 29.12.2021 | |
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
Former [2022/30] | FI | 29.12.2021 | |
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
Former [2022/25] | FI | 29.12.2021 | |
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
Former [2022/24] | FI | 29.12.2021 | |
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
BG | 29.03.2022 | ||
GR | 30.03.2022 | ||
Former [2022/22] | FI | 29.12.2021 | |
LT | 29.12.2021 | ||
RS | 29.12.2021 | ||
BG | 29.03.2022 | ||
Former [2022/21] | RS | 29.12.2021 | |
BG | 29.03.2022 | ||
Former [2022/19] | BG | 29.03.2022 | Cited in | International search | [Y]US6097870 (RANKA JINENDRA KUMAR [US], et al) [Y] 16 * column 7, line 53 - line 60 *; | [XAYI]US2012099340 (BUCHTER SCOTT CHARLES [FI]) [X] 1 * paragraph [0045] - paragraph [0046] * * paragraph [0055] * * paragraph [0069] * [A] 7 [Y] 2,3,12,16 [I] 4-6,8-11,13-15,17-20; | [Y]US2014010497 (KELLY DAVID P [US], et al) [Y] 12 * paragraph [0023] - paragraph [0030] *; | [A] - JACOB RAMSAY ET AL, "Generation of infrared supercontinuum radiation: spatial mode dispersion and higher-order mode propagation in ZBLAN step-index fibers", OPTICS EXPRESS, (20130425), vol. 21, no. 9, doi:10.1364/OE.21.010764, page 10764, XP055324554 [A] 1 * Chapter 2. Experimental setup * DOI: http://dx.doi.org/10.1364/OE.21.010764 | [YA] - LOGAN G. WRIGHT ET AL, "Controllable spatiotemporal nonlinear effects in multimode fibres", NATURE PHOTONICS, UK, (20150413), vol. 9, no. 5, doi:10.1038/nphoton.2015.61, ISSN 1749-4885, pages 306 - 310, XP055324907 [Y] 2,3 * the whole document * [A] 1 DOI: http://dx.doi.org/10.1038/nphoton.2015.61 | [A] - V A KAMYNIN ET AL, "Supercontinuum generation in the range 1.6 - 2.4 [mu]m using standard optical fibres", QUANTUM ELECTRONICS., GB, (20111130), vol. 41, no. 11, doi:10.1070/QE2011v041n11ABEH014671, ISSN 1063-7818, pages 986 - 988, XP055324126 [A] 1 * Chapter 2. Experimental stup and fibres;; figures 1,5 * DOI: http://dx.doi.org/10.1070/QE2011v041n11ABEH014671 | [A] - POURBEYRAM HAMED ET AL, "Stimulated Raman scattering cascade spanning the wavelength range of 523 to 1750 nm using a graded-index multimode optical f", APPLIED PHYSICS LETTERS, A I P PUBLISHING LLC, US, vol. 102, no. 20, doi:10.1063/1.4807620, ISSN 0003-6951, (20130520), pages 201107 - 201107, (20130521), XP012173058 [A] 1-3 * the whole document * DOI: http://dx.doi.org/10.1063/1.4807620 | [A] - Katarzyna Krupa ET AL, "Spatial beam self-cleaning in multimode fiber", (20160309), URL: https://arxiv.org/ftp/arxiv/papers/1603/1603.02972.pdf, XP055324541 [A] 1 * the whole document * |