blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3419926

EP3419926 - TELESCOPIC DRIVE, STACKER CRANE COMPRISING SAME AND OPERATING METHOD AND USE THEREFOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.07.2022
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  30.07.2021
FormerGrant of patent is intended
Status updated on  20.04.2021
FormerRequest for examination was made
Status updated on  30.11.2018
FormerThe international publication has been made
Status updated on  01.09.2017
Formerunknown
Status updated on  21.04.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Baumüller Nürnberg GmbH
Ostendstrasse 80-90
90482 Nürnberg / DE
[2019/01]
Inventor(s)01 / GÖTZ, Fritz Rainer
Dettinger Str. 17
73230 Kirchheim unter Teck / DE
 [2019/01]
Representative(s)Heilein, Ernst-Peter, et al
HEILEIN IP LAW
Bezirksstraße 2
85716 Unterschleißheim / DE
[2021/35]
Former [2019/01]Heilein, Ernst - Peter
Patentanwalt Robert-Bosch-Straße 22
85716 Unterschleißheim / DE
Application number, filing date17716774.927.02.2017
[2019/01]
WO2017DE100155
Priority number, dateDE20161020313426.02.2016         Original published format: DE102016203134
DE20161020696225.04.2016         Original published format: DE102016206962
DE20161020712627.04.2016         Original published format: DE102016207126
DE20161011794122.09.2016         Original published format: DE102016117941
[2019/01]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017144055
Date:31.08.2017
Language:DE
[2017/35]
Type: A1 Application with search report 
No.:EP3419926
Date:02.01.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 31.08.2017 takes the place of the publication of the European patent application.
[2019/01]
Type: B1 Patent specification 
No.:EP3419926
Date:01.09.2021
Language:DE
[2021/35]
Search report(s)International search report - published on:EP31.08.2017
ClassificationIPC:B66F9/14, B65G1/04, B66F9/07
[2019/01]
CPC:
B66F9/072 (EP,US); B65G1/0478 (EP,US); B65G1/04 (EP,US);
B65G1/0492 (EP,US); B66F9/0655 (US); B66F9/141 (EP,US);
F16H7/023 (US); B65G1/1375 (US); B66F13/00 (US);
F16H55/26 (US); F16H57/038 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/01]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:TELESKOPANTRIEB, EIN DIESEN UMFASSENDES REGALBEDIENGERÄT SOWIE BETRIEBSVERFAHREN UND VERWENDUNG HIERFÜR[2019/01]
English:TELESCOPIC DRIVE, STACKER CRANE COMPRISING SAME AND OPERATING METHOD AND USE THEREFOR[2019/01]
French:ENTRAÎNEMENT TÉLESCOPIQUE, TRANSTOCKEUR COMPORTANT CELUI-CI ET PROCÉDÉ DE FONCTIONNEMENT AINSI QU'UTILISATION ASSOCIÉS[2019/01]
Entry into regional phase24.08.2018National basic fee paid 
24.08.2018Designation fee(s) paid 
24.08.2018Examination fee paid 
Examination procedure24.08.2018Examination requested  [2019/01]
24.08.2018Date on which the examining division has become responsible
14.04.2019Amendment by applicant (claims and/or description)
21.04.2021Communication of intention to grant the patent
27.07.2021Fee for grant paid
27.07.2021Fee for publishing/printing paid
27.07.2021Receipt of the translation of the claim(s)
Opposition(s)02.06.2022No opposition filed within time limit [2022/32]
Fees paidRenewal fee
27.02.2019Renewal fee patent year 03
18.02.2020Renewal fee patent year 04
23.02.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.02.2017
AL01.09.2021
CY01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
MK01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
TR01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE27.02.2022
LU27.02.2022
BE28.02.2022
[2024/29]
Former [2024/22]HU27.02.2017
AL01.09.2021
CY01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
MK01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE27.02.2022
LU27.02.2022
BE28.02.2022
Former [2024/20]HU27.02.2017
AL01.09.2021
CY01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE27.02.2022
LU27.02.2022
BE28.02.2022
Former [2024/18]HU27.02.2017
AL01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE27.02.2022
LU27.02.2022
BE28.02.2022
Former [2023/10]AL01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE27.02.2022
LU27.02.2022
BE28.02.2022
Former [2023/09]AL01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE27.02.2022
LU27.02.2022
Former [2022/47]AL01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
LU27.02.2022
Former [2022/44]AL01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/36]AL01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/29]AL01.09.2021
CZ01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/25]CZ01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/24]CZ01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/10]ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
PL01.09.2021
RS01.09.2021
SE01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
Former [2022/09]ES01.09.2021
FI01.09.2021
LT01.09.2021
RS01.09.2021
SE01.09.2021
BG01.12.2021
NO01.12.2021
Former [2022/08]ES01.09.2021
FI01.09.2021
LT01.09.2021
SE01.09.2021
BG01.12.2021
NO01.12.2021
Former [2022/07]LT01.09.2021
NO01.12.2021
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.