EP3448708 - METHOD FOR MANUFACTURING A LIQUID CONTAINER, LIQUID CONTAINER FOR A MOTOR VEHICLE AND STRUCTURE FOR REDUCING SLOSH NOISES [Right-click to bookmark this link] | |||
Former [2019/10] | METHOD FOR PRODUCING A LIQUID CONTAINER, LIQUID CONTAINER FOR A MOTOR VEHICLE, AND STRUCTURE FOR REDUCING SLOSHING SOUNDS | ||
[2019/34] | Status | No opposition filed within time limit Status updated on 03.04.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 24.04.2020 | ||
Former | Grant of patent is intended Status updated on 23.01.2020 | ||
Former | Request for examination was made Status updated on 08.01.2020 | ||
Former | Grant of patent is intended Status updated on 15.08.2019 | ||
Former | Request for examination was made Status updated on 01.02.2019 | ||
Former | The international publication has been made Status updated on 04.11.2017 | ||
Former | unknown Status updated on 25.04.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Kautex Textron GmbH & Co. KG Kautexstr. 52 53229 Bonn / DE | [2019/10] | Inventor(s) | 01 /
TREUDT, Volker Irsertalstrasse 12 51570 Windeck / DE | 02 /
SCHWENK, Christoph In Grossfindel 16 56743 Mendig / DE | [2019/10] | Representative(s) | Richly & Ritschel Patentanwälte PartG mbB Sattlerweg 20 51429 Bergisch Gladbach / DE | [2019/10] | Application number, filing date | 17717119.6 | 06.04.2017 | [2019/10] | WO2017EP58298 | Priority number, date | DE201610207476 | 29.04.2016 Original published format: DE102016207476 | [2019/10] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017186471 | Date: | 02.11.2017 | Language: | DE | [2017/44] | Type: | A1 Application with search report | No.: | EP3448708 | Date: | 06.03.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 02.11.2017 takes the place of the publication of the European patent application. | [2019/10] | Type: | B1 Patent specification | No.: | EP3448708 | Date: | 27.05.2020 | Language: | DE | [2020/22] | Search report(s) | International search report - published on: | EP | 02.11.2017 | Classification | IPC: | B60K15/077, B60K15/03, B29C49/20, B29L31/00, B29K101/12 | [2019/34] | CPC: |
B60K15/077 (EP,KR,US);
B29C49/20 (US);
B60K15/03177 (KR,US);
B29C2049/2008 (US);
B29K2101/12 (US);
B29L2031/3055 (KR);
B29L2031/7172 (KR,US);
B60K2015/03032 (EP,KR,US);
B60K2015/03046 (US);
|
Former IPC [2019/10] | B60K15/077, B60K15/03 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUM HERSTELLEN EINES FLÜSSIGKEITSBEHÄLTERS, FLÜSSIGKEITSBEHÄLTER FÜR EIN KRAFTFAHRZEUG UND STRUKTUR ZUR VERRINGERUNG VON SCHWAPPGERÄUSCHEN | [2019/10] | English: | METHOD FOR MANUFACTURING A LIQUID CONTAINER, LIQUID CONTAINER FOR A MOTOR VEHICLE AND STRUCTURE FOR REDUCING SLOSH NOISES | [2019/34] | French: | PROCÉDÉ DE FABRICATION D'UN CONTENEUR DE LIQUIDE, CONTENEUR DE LIQUIDE POUR UN VÉHICULE AUTOMOBILE ET STRUCTURE POUR LA RÉDUCTION DES BRUITS DE BALLOTTEMENT | [2019/34] |
Former [2019/10] | METHOD FOR PRODUCING A LIQUID CONTAINER, LIQUID CONTAINER FOR A MOTOR VEHICLE, AND STRUCTURE FOR REDUCING SLOSHING SOUNDS | ||
Former [2019/10] | PROCÉDÉ DE FABRICATION D'UN RÉSERVOIR À LIQUIDE, RÉSERVOIR À LIQUIDE POUR UN VÉHICULE AUTOMOBILE ET STRUCTURE POUR DIMINUER LES BRUITS DE BALLOTTEMENT | Entry into regional phase | 08.10.2018 | National basic fee paid | 08.10.2018 | Designation fee(s) paid | 08.10.2018 | Examination fee paid | Examination procedure | 27.02.2018 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 08.10.2018 | Examination requested [2019/10] | 08.10.2018 | Date on which the examining division has become responsible | 16.08.2019 | Communication of intention to grant the patent | 20.12.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 24.01.2020 | Communication of intention to grant the patent | 14.04.2020 | Fee for grant paid | 14.04.2020 | Fee for publishing/printing paid | 14.04.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 02.03.2021 | No opposition filed within time limit [2021/18] | Fees paid | Renewal fee | 29.03.2019 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.04.2017 | AL | 27.05.2020 | CY | 27.05.2020 | CZ | 27.05.2020 | DK | 27.05.2020 | EE | 27.05.2020 | ES | 27.05.2020 | FI | 27.05.2020 | HR | 27.05.2020 | IT | 27.05.2020 | LT | 27.05.2020 | LV | 27.05.2020 | MC | 27.05.2020 | MK | 27.05.2020 | NL | 27.05.2020 | PL | 27.05.2020 | RO | 27.05.2020 | RS | 27.05.2020 | SE | 27.05.2020 | SI | 27.05.2020 | SK | 27.05.2020 | SM | 27.05.2020 | BG | 27.08.2020 | NO | 27.08.2020 | GR | 28.08.2020 | PT | 28.09.2020 | [2024/22] |
Former [2023/33] | HU | 06.04.2017 | |
AL | 27.05.2020 | ||
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
PT | 28.09.2020 | ||
Former [2023/30] | AL | 27.05.2020 | |
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
PT | 28.09.2020 | ||
Former [2022/10] | AL | 27.05.2020 | |
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
PT | 28.09.2020 | ||
Former [2021/50] | AL | 27.05.2020 | |
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/24] | AL | 27.05.2020 | |
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/10] | AL | 27.05.2020 | |
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/09] | AL | 27.05.2020 | |
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/08] | AL | 27.05.2020 | |
DK | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/04] | AL | 27.05.2020 | |
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/01] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/51] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/50] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/48] | FI | 27.05.2020 | |
LT | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/47] | LT | 27.05.2020 | |
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
Former [2020/46] | IS | 27.09.2020 | Cited in | International search | [XI]EP0413609 (NISSAN MOTOR [JP], et al) [X] 1,5,8,11-14 * column 3, lines 8-50 * * figures 1-7, 13 * [I] 7,9,10,15,16; | [XAI]JP2006171504 (KUREHA SENI KK) [X] 1,6,11,13,14 * abstract * * figures 1, 2 * [A] 2-5,7-10,12 [I] 15,16; | [A]FR2972685 (PEUGEOT CITROEN AUTOMOBILES SA [FR]) [A] 1-8,11,12 * page 7, line 26 - page 8, line 8 * * figures 6-9 *; | [AD]DE102014221823 (KAUTEX TEXTRON GMBH & CO KG [DE]) [AD] 1,7,8,10 * paragraphs [0068] - [0073] - [0 76] - [0083] - [0 89] ** figures 1-6 * | by applicant | DE102012009944 | DE102014221823 |