blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3465548

EP3465548 - SEALING SYSTEM AND METHOD OF INSTALLING A SEALING SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.04.2021
Database last updated on 16.09.2024
FormerThe patent has been granted
Status updated on  01.05.2020
FormerGrant of patent is intended
Status updated on  15.12.2019
FormerRequest for examination was made
Status updated on  08.03.2019
FormerThe international publication has been made
Status updated on  28.10.2017
Formerunknown
Status updated on  25.04.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
The European Atomic Energy Community (EURATOM), represented by the European Commission
200, rue de la Loi
1049 Brussels / BE
[N/P]
Former [2019/15]For all designated states
The European Atomic Energy Community (EURATOM), represented by the European Commission
200, rue de la Loi
1049 Brussels / BE
Inventor(s)01 / BERGONZI, Claudio
Via Passo Sentinella 121
21027 Ispra / IT
02 / PARNISARI, Marco
Via Bolzano 5
21036 Gemonio / IT
03 / LITTMANN, François
Contrada Bonè 13
21034 Cocquio Trevisago (VA) / IT
 [2019/15]
Representative(s)Gevers Patents
De Kleetlaan 7A
1831 Diegem / BE
[N/P]
Former [2019/15]Gevers Patents
Intellectual Property House
Holidaystraat 5
1831 Diegem / BE
Application number, filing date17717436.413.04.2017
[2019/15]
WO2017EP59021
Priority number, dateEP2016016670222.04.2016         Original published format: EP 16166702
[2019/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017182398
Date:26.10.2017
Language:EN
[2017/43]
Type: A1 Application with search report 
No.:EP3465548
Date:10.04.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 26.10.2017 takes the place of the publication of the European patent application.
[2019/15]
Type: B1 Patent specification 
No.:EP3465548
Date:03.06.2020
Language:EN
[2020/23]
Search report(s)International search report - published on:EP26.10.2017
ClassificationIPC:G06K19/073, G06K19/077, G06K19/07, G06K7/10
[2019/15]
CPC:
G06K19/07372 (EP,KR,US); G06K19/07737 (EP,KR,US); G06K7/10306 (EP,KR,US);
G01S13/02 (RU); G06K19/07 (RU); G06K19/0717 (EP,KR,US);
G06K19/077 (RU); G06K19/07798 (EP,KR,US); G08B13/24 (RU);
H04B1/7183 (RU) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/15]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:DICHTUNGSSYSTEM UND VERFAHREN ZUR INSTALLATION EINES DICHTUNGSSYSTEMS[2019/15]
English:SEALING SYSTEM AND METHOD OF INSTALLING A SEALING SYSTEM[2019/15]
French:SYSTÈME D'ÉTANCHÉITÉ ET PROCÉDÉ D'INSTALLATION D'UN SYSTÈME D'ÉTANCHÉITÉ[2020/02]
Former [2019/15]SYSTÈME D'ÉTANCHÉITÉ ET PROCÉDÉ D'INSTALLATION D'UN SYSTÈME D'ÉTANCHÉITÉ
Entry into regional phase20.11.2018National basic fee paid 
20.11.2018Designation fee(s) paid 
20.11.2018Examination fee paid 
Examination procedure22.02.2018Request for preliminary examination filed
International Preliminary Examining Authority: EP
20.11.2018Examination requested  [2019/15]
20.11.2018Date on which the examining division has become responsible
24.07.2019Amendment by applicant (claims and/or description)
16.12.2019Communication of intention to grant the patent
15.04.2020Fee for grant paid
15.04.2020Fee for publishing/printing paid
15.04.2020Receipt of the translation of the claim(s)
Opposition(s)04.03.2021No opposition filed within time limit [2021/19]
Fees paidRenewal fee
20.11.2018Renewal fee patent year 03
28.04.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.04.2017
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
MC03.06.2020
MK03.06.2020
MT03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
TR03.06.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
[2024/42]
Former [2024/29]HU13.04.2017
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
MC03.06.2020
MK03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
TR03.06.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2024/22]HU13.04.2017
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
MC03.06.2020
MK03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2023/33]HU13.04.2017
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2023/30]AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2022/23]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2022/10]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
NO03.09.2020
GR04.09.2020
PT06.10.2020
Former [2021/50]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/24]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/21]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SK03.06.2020
SM03.06.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/10]AL03.06.2020
AT03.06.2020
CZ03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SK03.06.2020
SM03.06.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/09]AL03.06.2020
AT03.06.2020
CZ03.06.2020
EE03.06.2020
HR03.06.2020
IT03.06.2020
LV03.06.2020
NL03.06.2020
RO03.06.2020
RS03.06.2020
SM03.06.2020
NO03.09.2020
GR04.09.2020
PT06.10.2020
Former [2021/04]AL03.06.2020
HR03.06.2020
LV03.06.2020
NL03.06.2020
RS03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/51]HR03.06.2020
LV03.06.2020
RS03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/50]HR03.06.2020
LV03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/47]NO03.09.2020
Cited inInternational search[Y]US2004239435  (HUGHES C DUFF [US], et al) [Y] 1-15 * figures 1,2 * * paragraphs [0015] , [0017] , [0019] *;
 [A]WO2005111961  (KIMBERLY CLARK CO [US], et al) [A] 1-15 * figure 4 * * paragraphs [0026] , [0028] , [0049] , [0052] , [0054] , [0058] , [0067] *;
 [Y]WO2014009981  (DATALOGIC SPA [IT], et al) [Y] 1-15* paragraph [0071] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.