blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3436706

EP3436706 - SAFETY BLOCK WITH DOUBLE VALVE FOR A HYDRAULIC CYLINDER [Right-click to bookmark this link]
Former [2019/06]DUAL-VALVE SECURITY UNIT FOR HYDRAULIC CYLINDERS
[2019/49]
StatusNo opposition filed within time limit
Status updated on  26.02.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  20.03.2020
FormerGrant of patent is intended
Status updated on  29.11.2019
FormerRequest for examination was made
Status updated on  04.01.2019
FormerThe international publication has been made
Status updated on  10.11.2017
Formerunknown
Status updated on  25.04.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Lohr Industrie
29 Rue du 14 Juillet
67980 Hangenbieten / FR
[2019/06]
Inventor(s)01 / ANDRE, Jean-Luc
24 Rue Ettore Bugatti
67120 MOLSHEIM / FR
 [2019/06]
Representative(s)Merckling, Norbert, et al
Laurent et Charras
1A, Place Boecler
BP 10063
67024 Strasboug Cedex 01 / FR
[2019/06]
Application number, filing date17717486.930.03.2017
[2019/06]
WO2017FR50738
Priority number, dateFR2016005284031.03.2016         Original published format: FR 1652840
[2019/06]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2017191380
Date:09.11.2017
Language:FR
[2017/45]
Type: A1 Application with search report 
No.:EP3436706
Date:06.02.2019
Language:FR
The application published by WIPO in one of the EPO official languages on 09.11.2017 takes the place of the publication of the European patent application.
[2019/06]
Type: B1 Patent specification 
No.:EP3436706
Date:22.04.2020
Language:FR
[2020/17]
Search report(s)International search report - published on:EP09.11.2017
ClassificationIPC:F15B13/01, F16K15/04
[2019/06]
CPC:
F15B13/01 (EP,US); F16K15/042 (EP,US); F15B15/14 (US);
F15B15/202 (US); F15B2211/72 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/06]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:SICHEREITSBLOCK MIT DOPPELTEM VENTIL FÜR EINEN HYDRAULISCHEN ZYLINDER[2019/49]
English:SAFETY BLOCK WITH DOUBLE VALVE FOR A HYDRAULIC CYLINDER[2019/49]
French:BLOC DE SÉCURITÉ À DOUBLE CLAPET POUR VÉRIN HYDRAULIQUE[2019/06]
Former [2019/06]DOPPELVENTILSICHERUNGSEINHEIT FÜR HYDRAULIKZYLINDER
Former [2019/06]DUAL-VALVE SECURITY UNIT FOR HYDRAULIC CYLINDERS
Entry into regional phase09.07.2018National basic fee paid 
09.07.2018Designation fee(s) paid 
09.07.2018Examination fee paid 
Examination procedure09.07.2018Examination requested  [2019/06]
09.07.2018Date on which the examining division has become responsible
28.11.2019Communication of intention to grant the patent
24.02.2020Fee for grant paid
24.02.2020Fee for publishing/printing paid
24.02.2020Receipt of the translation of the claim(s)
Opposition(s)25.01.2021No opposition filed within time limit [2021/13]
Fees paidRenewal fee
26.03.2019Renewal fee patent year 03
16.03.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.03.2017
AL22.04.2020
AT22.04.2020
CY22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
LV22.04.2020
MC22.04.2020
MK22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
[2024/22]
Former [2023/33]HU30.03.2017
AL22.04.2020
AT22.04.2020
CY22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2023/30]AL22.04.2020
AT22.04.2020
CY22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/45]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/24]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
LV22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/10]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
LV22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/09]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
LV22.04.2020
NL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/08]AL22.04.2020
DK22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
LV22.04.2020
NL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/04]AL22.04.2020
FI22.04.2020
HR22.04.2020
LV22.04.2020
NL22.04.2020
RS22.04.2020
SE22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/01]FI22.04.2020
HR22.04.2020
LV22.04.2020
NL22.04.2020
RS22.04.2020
SE22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/51]FI22.04.2020
HR22.04.2020
LV22.04.2020
NL22.04.2020
RS22.04.2020
SE22.04.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/50]FI22.04.2020
HR22.04.2020
LV22.04.2020
NL22.04.2020
SE22.04.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/48]FI22.04.2020
NL22.04.2020
SE22.04.2020
NO22.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/47]NO22.07.2020
IS22.08.2020
Former [2020/46]IS22.08.2020
Cited inInternational search[AD]EP0935715  (LOHR IND [FR]) [AD] 1-15 * paragraphs [0019] - [0027] - [0060] - [0071] *;
 [A]JP2005077275  (BABCOCK HITACHI KK) [A] 1 * abstract *;
 [A]DE102009017031  (LINDE MATERIAL HANDLING GMBH [DE]) [A] 1* paragraphs [0033] - [0044] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.