EP3440406 - IMPROVED THERMOSTAT [Right-click to bookmark this link] | |||
Former [2019/07] | AN IMPROVED THERMOSTAT | ||
[2019/36] | Status | No opposition filed within time limit Status updated on 18.12.2020 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 10.01.2020 | ||
Former | Grant of patent is intended Status updated on 05.09.2019 | ||
Former | Request for examination was made Status updated on 11.01.2019 | ||
Former | The international publication has been made Status updated on 13.10.2017 | ||
Former | unknown Status updated on 10.05.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states E.G.O. Elektro-Gerätebau GmbH Blanc-und-Fischer-Platz 1-3 75038 Oberderdingen / DE | [2020/10] |
Former [2019/07] | For all designated states Defendi Italy S.r.l. Via Direttissima del Conero, 29 60021 Camerano / IT | Inventor(s) | 01 /
LUCHETTA, Paolo c/o Defendi Italy S.r.l. Via Direttissima del Conero 29 60021 Camerano / IT | 02 /
NOETH, Werner c/o Defendi Italy S.r.l. Via Direttissima del Conero 29 60021 Camerano / IT | [2019/07] | Representative(s) | Piovesana, Paolo c/o Praxi Intellectual Property S.p.A.- Venezia Via Francesco Baracca, 5/A 30173 Venezia-Mestre / IT | [2020/07] |
Former [2019/07] | Piovesana, Paolo Via F. Baracca, 5/a 30173 Venezia-Mestre / IT | Application number, filing date | 17720573.9 | 03.04.2017 | [2019/07] | WO2017IB51889 | Priority number, date | IT2016UA02288 | 04.04.2016 Original published format: IT UA20162288 | [2019/07] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017175110 | Date: | 12.10.2017 | Language: | EN | [2017/41] | Type: | A1 Application with search report | No.: | EP3440406 | Date: | 13.02.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.10.2017 takes the place of the publication of the European patent application. | [2019/07] | Type: | B1 Patent specification | No.: | EP3440406 | Date: | 12.02.2020 | Language: | EN | [2020/07] | Type: | B8 Corrected title page of specification | No.: | EP3440406 | Date: | 27.05.2020 | [2020/22] | Search report(s) | International search report - published on: | EP | 12.10.2017 | Classification | IPC: | F23N1/00, F23N5/10 | [2019/07] | CPC: |
F23N1/005 (EP);
F23N5/107 (EP);
F23N2235/14 (EP);
F23N2235/16 (EP);
F23N2235/18 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERBESSERTES THERMOSTAT | [2019/07] | English: | IMPROVED THERMOSTAT | [2019/36] | French: | THERMOSTAT PERFECTIONNÉ | [2019/07] |
Former [2019/07] | AN IMPROVED THERMOSTAT | Entry into regional phase | 22.10.2018 | National basic fee paid | 22.10.2018 | Designation fee(s) paid | 22.10.2018 | Examination fee paid | Examination procedure | 26.01.2018 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 22.10.2018 | Amendment by applicant (claims and/or description) | 22.10.2018 | Examination requested [2019/07] | 22.10.2018 | Date on which the examining division has become responsible | 06.09.2019 | Communication of intention to grant the patent | 12.12.2019 | Fee for grant paid | 12.12.2019 | Fee for publishing/printing paid | 20.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 13.11.2020 | No opposition filed within time limit [2021/03] | Fees paid | Renewal fee | 25.03.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.04.2017 | AL | 12.02.2020 | AT | 12.02.2020 | CY | 12.02.2020 | CZ | 12.02.2020 | DK | 12.02.2020 | EE | 12.02.2020 | FI | 12.02.2020 | HR | 12.02.2020 | LT | 12.02.2020 | LV | 12.02.2020 | MC | 12.02.2020 | MK | 12.02.2020 | MT | 12.02.2020 | NL | 12.02.2020 | PL | 12.02.2020 | RS | 12.02.2020 | SE | 12.02.2020 | SI | 12.02.2020 | SK | 12.02.2020 | SM | 12.02.2020 | IE | 03.04.2020 | LU | 03.04.2020 | FR | 12.04.2020 | BE | 30.04.2020 | CH | 30.04.2020 | LI | 30.04.2020 | BG | 12.05.2020 | NO | 12.05.2020 | GR | 13.05.2020 | IS | 12.06.2020 | PT | 05.07.2020 | [2022/31] |
Former [2022/30] | HU | 03.04.2017 | |
AL | 12.02.2020 | ||
AT | 12.02.2020 | ||
CY | 12.02.2020 | ||
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
MT | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
IE | 03.04.2020 | ||
LU | 03.04.2020 | ||
FR | 12.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2022/28] | HU | 03.04.2017 | |
AT | 12.02.2020 | ||
CY | 12.02.2020 | ||
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
MT | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
IE | 03.04.2020 | ||
LU | 03.04.2020 | ||
FR | 12.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2021/20] | AT | 12.02.2020 | |
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
IE | 03.04.2020 | ||
LU | 03.04.2020 | ||
FR | 12.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2021/11] | AT | 12.02.2020 | |
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
LU | 03.04.2020 | ||
FR | 12.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2021/08] | CZ | 12.02.2020 | |
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
NL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
LU | 03.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/52] | CZ | 12.02.2020 | |
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
NL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/50] | CZ | 12.02.2020 | |
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/49] | CZ | 12.02.2020 | |
DK | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/48] | DK | 12.02.2020 | |
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/47] | DK | 12.02.2020 | |
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
Former [2020/45] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
Former [2020/40] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
Former [2020/39] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
Former [2020/38] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
Former [2020/37] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
NO | 12.05.2020 | ||
Former [2020/35] | FI | 12.02.2020 | |
NO | 12.05.2020 | Cited in | International search | [A]US3477641 (FAIRLEY RICHARD K, et al) [A] 1 * column 1, line 58 - column 3, line 49 ** figure . *; | [A]EP0047810 (BOSCH GMBH ROBERT [DE]) [A] 1 * page 5, paragraph 1 - page 7, paragraph 1 * * figures 1-3 *; | [A]US5816490 (ARESO JON GANZABAL [ES]) [A] 1 * column 3, line 54 - column 4, line 15 * * figures 1-3 *; | [A]EP1106922 (GALLOCCHIO VANNI [IT]) [A] 1,10 * column 5, paragraph 61 - paragraph 63 * * figure 4 *; | [ID]WO2004088206 (SIT LA PRECISA SPA [IT], et al) [ID] 1-20 * page 3, line 6 - page 6, line 10 * * figures 1-4 *; | [AD]WO2014064605 (CONTROLLING SAVING ENERGY ITALIA S R L [IT]) [AD] 1 * the whole document * |