blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3458774

EP3458774 - STEAM GENERATOR PIPE HAVING A TURBULENCE INSTALLATION BODY [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.04.2021
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  22.05.2020
FormerGrant of patent is intended
Status updated on  24.02.2020
FormerRequest for examination was made
Status updated on  22.02.2019
FormerThe international publication has been made
Status updated on  12.01.2018
Formerunknown
Status updated on  12.05.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Siemens Energy Global GmbH & Co. KG
Otto-Hahn-Ring 6
81739 München / DE
[2021/04]
Former [2019/13]For all designated states
Siemens Aktiengesellschaft
Werner-von-Siemens-Straße 1
80333 München / DE
Inventor(s)01 / BRÜCKNER, Jan
Habernhoferweg 30
91080 Uttenreuth / DE
02 / EFFERT, Martin
Nötherstrasse 16A
91058 Erlangen / DE
 [2019/13]
Application number, filing date17720704.019.04.2017
[2019/13]
WO2017EP59227
Priority number, dateDE20161021241607.07.2016         Original published format: DE102016212416
[2019/13]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018007036
Date:11.01.2018
Language:DE
[2018/02]
Type: A1 Application with search report 
No.:EP3458774
Date:27.03.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 11.01.2018 takes the place of the publication of the European patent application.
[2019/13]
Type: B1 Patent specification 
No.:EP3458774
Date:24.06.2020
Language:DE
[2020/26]
Search report(s)International search report - published on:EP11.01.2018
ClassificationIPC:F22B37/10
[2019/13]
CPC:
F22B37/103 (EP,KR,RU,US); B21C1/22 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/13]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:DAMPFERZEUGERROHR MIT DRALLEINBAUKÖRPER[2019/13]
English:STEAM GENERATOR PIPE HAVING A TURBULENCE INSTALLATION BODY[2019/13]
French:TUBE DE GÉNÉRATEUR DE VAPEUR COMPORTANT UN ÉLÉMENT INTÉGRÉ DE TURBULENCE[2019/13]
Entry into regional phase19.12.2018National basic fee paid 
19.12.2018Designation fee(s) paid 
19.12.2018Examination fee paid 
Examination procedure26.07.2017Request for preliminary examination filed
International Preliminary Examining Authority: EP
19.12.2018Examination requested  [2019/13]
19.12.2018Date on which the examining division has become responsible
25.02.2020Communication of intention to grant the patent
12.05.2020Receipt of the translation of the claim(s)
13.05.2020Fee for grant paid
13.05.2020Fee for publishing/printing paid
Opposition(s)25.03.2021No opposition filed within time limit [2021/22]
Fees paidRenewal fee
16.04.2019Renewal fee patent year 03
20.04.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.04.2017
AL24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
MK24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
TR24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
[2024/29]
Former [2024/22]HU19.04.2017
AL24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
MK24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2023/33]HU19.04.2017
AL24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2023/30]AL24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2022/23]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2022/10]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
PT26.10.2020
Former [2021/50]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/36]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/21]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/10]AL24.06.2020
CZ24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/09]AL24.06.2020
CZ24.06.2020
EE24.06.2020
ES24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
PT26.10.2020
Former [2021/04]AL24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RS24.06.2020
SE24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
Former [2021/01]HR24.06.2020
LT24.06.2020
LV24.06.2020
RS24.06.2020
SE24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
Former [2020/51]HR24.06.2020
LT24.06.2020
LV24.06.2020
RS24.06.2020
SE24.06.2020
NO24.09.2020
GR25.09.2020
Former [2020/50]HR24.06.2020
LT24.06.2020
LV24.06.2020
SE24.06.2020
NO24.09.2020
GR25.09.2020
Former [2020/49]LT24.06.2020
SE24.06.2020
NO24.09.2020
Former [2020/47]LT24.06.2020
NO24.09.2020
Cited inInternational search[IA]DE3231318  (HEIM KURT) [I] 1-4 * page 8, paragraph l - page 10, line l; figure .; claim . * * abstract * [A] 5-8;
 [XAI]JPH0579782  (MITSUBISHI SHINDO KK) [X] 1,3,4 * abstract * [A] 5-8 [I] 2;
 [AD]WO2011151135  (SIEMENS AG [DE], et al) [AD] 1-8 * page 6, line 4 - page 8, line 26; figure -; claim - ** abstract *
by applicantEP2390567
 WO2011151135
 DE102012219898
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.