| EP3479262 - CONTROL-TO-RANGE FAILSAFES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.11.2023 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 09.12.2022 | ||
| Former | Grant of patent is intended Status updated on 14.07.2022 | ||
| Former | Examination is in progress Status updated on 28.04.2020 | ||
| Former | Request for examination was made Status updated on 05.04.2019 | ||
| Former | The international publication has been made Status updated on 08.12.2017 | ||
| Former | unknown Status updated on 31.05.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For:AL
AT
BE
BG
CH
CY
CZ
DK
EE
ES
FI
FR
GB
GR
HR
HU
IE
IS
IT
LI
LT
LU
LV
MC
MK
MT
NL
NO
PL
PT
RO
RS
SE
SI
SK
SM
TR
F. Hoffmann-La Roche AG Grenzacherstrasse 124 4070 Basel / CH | For:DE
Roche Diabetes Care GmbH Sandhofer Straße 116 68305 Mannheim / DE | [2023/02] |
| Former [2019/19] | For all designated states Roche Diabetes Care GmbH Sandhofer Straße 116 68305 Mannheim / DE | Inventor(s) | 01 /
DUKE, David L. 11125 Long Lake Lane Fishers, Indiana 46037 / US | 02 /
RINGEMANN, Christian Richard Wagner Strasse 44 D-68165 Mannheim / DE | 03 /
MANOHAR, Chinmay Uday 11712 Steamboat Drive Apartment 2231 Fishers, Indiana 46037 / US | [2019/19] | Representative(s) | Bittner, Thomas L. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2019/19] | Application number, filing date | 17725003.2 | 09.05.2017 | [2019/19] | WO2017US31662 | Priority number, date | US201615170425 | 01.06.2016 Original published format: US201615170425 | [2019/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017209903 | Date: | 07.12.2017 | Language: | EN | [2017/49] | Type: | A1 Application with search report | No.: | EP3479262 | Date: | 08.05.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.12.2017 takes the place of the publication of the European patent application. | [2019/19] | Type: | B1 Patent specification | No.: | EP3479262 | Date: | 11.01.2023 | Language: | EN | [2023/02] | Search report(s) | International search report - published on: | EP | 07.12.2017 | Classification | IPC: | G16H50/20, G16H20/17, G16H40/67 | [2022/02] | CPC: |
G16H50/20 (EP,KR,US);
A61M5/1723 (KR,US);
A61B5/14532 (KR,US);
A61B5/4839 (KR,US);
A61M5/14244 (KR,US);
G16H20/17 (EP,US);
G16H40/67 (EP,US);
A61M2005/14208 (KR,US);
A61M2005/14292 (US);
|
| Former IPC [2019/19] | G06F19/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | REGELUNG-ZU-BEREICH-AUSFALLSICHERUNG | [2019/19] | English: | CONTROL-TO-RANGE FAILSAFES | [2019/19] | French: | SÉCURITÉ INTÉGRÉE POUR LE CONTRÔLE PAR RAPPORT À UNE PLAGE | [2019/19] | Entry into regional phase | 02.01.2019 | National basic fee paid | 02.01.2019 | Designation fee(s) paid | 02.01.2019 | Examination fee paid | Examination procedure | 02.01.2019 | Examination requested [2019/19] | 02.01.2019 | Date on which the examining division has become responsible | 19.07.2019 | Amendment by applicant (claims and/or description) | 04.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 27.08.2020 | Reply to a communication from the examining division | 21.09.2020 | Despatch of a communication from the examining division (Time limit: M02) | 26.11.2020 | Reply to a communication from the examining division | 03.12.2021 | Cancellation of oral proceeding that was planned for 07.12.2021 | 07.12.2021 | Date of oral proceedings (cancelled) | 20.12.2021 | Despatch of a communication from the examining division (Time limit: M04) | 06.01.2022 | Reply to a communication from the examining division | 15.07.2022 | Communication of intention to grant the patent | 10.11.2022 | Fee for grant paid | 10.11.2022 | Fee for publishing/printing paid | 10.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 12.10.2023 | No opposition filed within time limit [2023/51] | Fees paid | Renewal fee | 08.05.2019 | Renewal fee patent year 03 | 30.03.2020 | Renewal fee patent year 04 | 11.05.2021 | Renewal fee patent year 05 | 21.03.2022 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 09.05.2017 | AT | 11.01.2023 | BG | 11.01.2023 | DK | 11.01.2023 | EE | 11.01.2023 | HR | 11.01.2023 | LT | 11.01.2023 | LV | 11.01.2023 | MC | 11.01.2023 | PL | 11.01.2023 | RO | 11.01.2023 | RS | 11.01.2023 | SE | 11.01.2023 | SI | 11.01.2023 | SK | 11.01.2023 | SM | 11.01.2023 | TR | 11.01.2023 | NO | 11.04.2023 | GR | 12.04.2023 | LU | 09.05.2023 | IS | 11.05.2023 | PT | 11.05.2023 | BE | 31.05.2023 | [2026/04] |
| Former [2025/36] | CY | 09.05.2017 | |
| AT | 11.01.2023 | ||
| BG | 11.01.2023 | ||
| DK | 11.01.2023 | ||
| EE | 11.01.2023 | ||
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| MC | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RO | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| SI | 11.01.2023 | ||
| SK | 11.01.2023 | ||
| SM | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| LU | 09.05.2023 | ||
| IS | 11.05.2023 | ||
| PT | 11.05.2023 | ||
| BE | 31.05.2023 | ||
| Former [2024/51] | AT | 11.01.2023 | |
| BG | 11.01.2023 | ||
| DK | 11.01.2023 | ||
| EE | 11.01.2023 | ||
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| MC | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RO | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| SI | 11.01.2023 | ||
| SK | 11.01.2023 | ||
| SM | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| LU | 09.05.2023 | ||
| IS | 11.05.2023 | ||
| PT | 11.05.2023 | ||
| BE | 31.05.2023 | ||
| Former [2024/24] | AT | 11.01.2023 | |
| DK | 11.01.2023 | ||
| EE | 11.01.2023 | ||
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| MC | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RO | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| SI | 11.01.2023 | ||
| SK | 11.01.2023 | ||
| SM | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| LU | 09.05.2023 | ||
| IS | 11.05.2023 | ||
| PT | 11.05.2023 | ||
| BE | 31.05.2023 | ||
| Former [2024/11] | AT | 11.01.2023 | |
| DK | 11.01.2023 | ||
| EE | 11.01.2023 | ||
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| MC | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RO | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| SI | 11.01.2023 | ||
| SK | 11.01.2023 | ||
| SM | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| LU | 09.05.2023 | ||
| IS | 11.05.2023 | ||
| PT | 11.05.2023 | ||
| Former [2024/08] | AT | 11.01.2023 | |
| DK | 11.01.2023 | ||
| EE | 11.01.2023 | ||
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| MC | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RO | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| SK | 11.01.2023 | ||
| SM | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| LU | 09.05.2023 | ||
| IS | 11.05.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/50] | AT | 11.01.2023 | |
| DK | 11.01.2023 | ||
| EE | 11.01.2023 | ||
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RO | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| SK | 11.01.2023 | ||
| SM | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| IS | 11.05.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/49] | AT | 11.01.2023 | |
| DK | 11.01.2023 | ||
| EE | 11.01.2023 | ||
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RO | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| SM | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| IS | 11.05.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/48] | AT | 11.01.2023 | |
| DK | 11.01.2023 | ||
| EE | 11.01.2023 | ||
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| SM | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| IS | 11.05.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/46] | AT | 11.01.2023 | |
| DK | 11.01.2023 | ||
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| SM | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| IS | 11.05.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/39] | AT | 11.01.2023 | |
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| IS | 11.05.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/38] | AT | 11.01.2023 | |
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| PL | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/37] | AT | 11.01.2023 | |
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| GR | 12.04.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/36] | AT | 11.01.2023 | |
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| LV | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| SE | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/35] | AT | 11.01.2023 | |
| HR | 11.01.2023 | ||
| LT | 11.01.2023 | ||
| RS | 11.01.2023 | ||
| NO | 11.04.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/34] | LT | 11.01.2023 | |
| RS | 11.01.2023 | ||
| PT | 11.05.2023 | ||
| Former [2023/33] | LT | 11.01.2023 | Cited in | International search | [I] WO2013032965 (UNIV VIRGINIA PATENT FOUND et al.) | [ID] US2015273147 (DUKE DAVID L et al.) | [XI] COLLEEN S HUGHES ET AL: "Hypoglycemia Prevention via Pump Attenuation and Red-Yellow-Green "Traffic" Lights Using Continuous Glucose Monitoring and Insulin Pump Data Author Affiliations", JOURNAL OF DIABETES SCIENCE AND TECHNOLOGY VOLUME DIABETES TECHNOLOGY SOCIETY, vol. 4, no. 5, 1 September 2010 (2010-09-01), XP055359760 | Examination | ANONYMOUS: "Super Bolus - This is Caleb...", 21 April 2010 (2010-04-21), XP055689535, Retrieved from the Internet | ANONYMOUS: "OpenAPS Reference Design", 4 March 2016 (2016-03-04), XP055688859, Retrieved from the Internet | BRIAN L LEVY ET AL: "The Hypoglycaemia-Hyperglycaemia Minimizer System in the Management of Type 1 Diabetes", EUROPEAN ENDOCRINOLOGY, vol. 12, no. 1, 1 January 2016 (2016-01-01), pages 18, XP055689885, ISSN: 1758-3772, DOI: 10.17925/EE.2016.12.01.18 DOI: http://dx.doi.org/10.17925/EE.2016.12.01.18 | DANA LEWIS: "How does a closed loop articial pancreas work when you DIY? Or: #DIYPS closed loop is working!", DIYPS.ORG, 15 December 2014 (2014-12-15), pages 1 - 17, XP055776532, Retrieved from the Internet | WANG YOUQING ET AL: "A Novel Adaptive Basal Therapy Based on the Value and Rate of Change of Blood Glucose", JOURNAL OF DIABETES SCIENCE AND TECHNOLOGY VOLUME DIABETES TECHNOLOGY SOCIETY, 1 September 2009 (2009-09-01), pages 1 - 10, XP055776543, Retrieved from the Internet | by applicant | US201514229016 | US201213645198 | US69370110 | US81879510 | US201213593557 | US201213593575 |