EP3458406 - SYSTEM FOR ASSISTING IN THE EVALUATION AND MANAGEMENT OF A DANGER ON AN AERIAL LIFT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.05.2022 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 18.06.2021 | ||
Former | Grant of patent is intended Status updated on 24.03.2021 | ||
Former | Request for examination was made Status updated on 22.02.2019 | ||
Former | The international publication has been made Status updated on 25.11.2017 | ||
Former | unknown Status updated on 02.06.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Haulotte Group Rue Emile Zola 42420 Lorette / FR | [2020/45] |
Former [2019/13] | For all designated states Haulotte Group La Péronnière 42152 L'Horme / FR | Inventor(s) | 01 /
VIAL, Cyrille 56 avenue de Montbrison 42600 Ecotay l'Olme / FR | 02 /
LUMINET, Philippe 28 Montée des Carmélites 69001 Lyon / FR | [2019/13] | Representative(s) | Lavoix 62, rue de Bonnel 69448 Lyon Cedex 03 / FR | [2019/13] | Application number, filing date | 17725215.2 | 17.05.2017 | [2019/13] | WO2017EP61837 | Priority number, date | FR20160054415 | 18.05.2016 Original published format: FR 1654415 | [2019/13] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2017198707 | Date: | 23.11.2017 | Language: | FR | [2017/47] | Type: | A1 Application with search report | No.: | EP3458406 | Date: | 27.03.2019 | Language: | FR | The application published by WIPO in one of the EPO official languages on 23.11.2017 takes the place of the publication of the European patent application. | [2019/13] | Type: | B1 Patent specification | No.: | EP3458406 | Date: | 21.07.2021 | Language: | FR | [2021/29] | Search report(s) | International search report - published on: | EP | 23.11.2017 | Classification | IPC: | B66F17/00, B66F11/04 | [2019/13] | CPC: |
B66F17/006 (EP,US);
B66F11/046 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEM ZUR UNTERSTÜTZUNG DER BEURTEILUNG UND VERWALTUNG EINER GEFAHR BEI EINEM FREILEITUNGSLIFT | [2019/13] | English: | SYSTEM FOR ASSISTING IN THE EVALUATION AND MANAGEMENT OF A DANGER ON AN AERIAL LIFT | [2019/13] | French: | SYSTÈME D'AIDE À L'ÉVALUATION ET À LA GESTION D'UN DANGER SUR UNE NACELLE ÉLÉVATRICE | [2019/13] | Entry into regional phase | 29.10.2018 | National basic fee paid | 29.10.2018 | Designation fee(s) paid | 29.10.2018 | Examination fee paid | Examination procedure | 29.10.2018 | Examination requested [2019/13] | 29.10.2018 | Date on which the examining division has become responsible | 25.06.2019 | Amendment by applicant (claims and/or description) | 25.03.2021 | Communication of intention to grant the patent | 15.06.2021 | Fee for grant paid | 15.06.2021 | Fee for publishing/printing paid | 15.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 22.04.2022 | No opposition filed within time limit [2022/26] | Fees paid | Renewal fee | 12.07.2019 | Renewal fee patent year 03 | 21.04.2020 | Renewal fee patent year 04 | 15.04.2021 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 31.05.2019 | 03   M06   Fee paid on   12.07.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.05.2017 | AL | 21.07.2021 | AT | 21.07.2021 | CY | 21.07.2021 | CZ | 21.07.2021 | DK | 21.07.2021 | EE | 21.07.2021 | ES | 21.07.2021 | FI | 21.07.2021 | HR | 21.07.2021 | LT | 21.07.2021 | LV | 21.07.2021 | MC | 21.07.2021 | MK | 21.07.2021 | NL | 21.07.2021 | PL | 21.07.2021 | RO | 21.07.2021 | RS | 21.07.2021 | SE | 21.07.2021 | SI | 21.07.2021 | SK | 21.07.2021 | SM | 21.07.2021 | BG | 21.10.2021 | NO | 21.10.2021 | GR | 22.10.2021 | IS | 21.11.2021 | PT | 22.11.2021 | [2024/22] |
Former [2024/20] | HU | 17.05.2017 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2024/18] | HU | 17.05.2017 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2023/06] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/29] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/25] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/24] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/21] | AT | 21.07.2021 | |
DK | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/11] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/09] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
PT | 22.11.2021 | ||
Former [2022/08] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
Former [2022/07] | AT | 21.07.2021 | |
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
NO | 21.10.2021 | Cited in | International search | [YA]JPH0574984U (UNKNOWN) [Y] 15 * figure - * [A] 1; | [Y]JP2001278600 (AICHI CORP KK) [Y] 1-15 * abstract *; | [Y]US2003214415 (SHAW JACK B [US]) [Y] 1-15 * paragraphs [0010] , [0 34] , [0035] , [0038] , [0039]; figure - * * paragraphs [0041] , [0045] , [0051] , [0054] , [0056] , [0061] *; | [A]WO2012088091 (JLG IND INC [US], et al) [A] 1 * page 6, lines 27-28 * * figure - *; | [AD]WO2012109444 (BAILLARGEON PAUL D [US], et al) [AD] 1,4,10,12 * figure - * * paragraphs [0014] , [0027] , [0059] , [0069] *; | [AD]US2016075543 (LOMBARDO DAVID W [US], et al) [AD] 1* paragraphs [0006] , [0 19] , [0 23] , [0 32]; figure - * |