blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3448809

EP3448809 - FACILITY FOR PRODUCING A COMPOSITE MATERIAL COMPRISING CARBON NANOTUBES AND METHOD FOR IMPLEMENTING SAID FACILITY [Right-click to bookmark this link]
Former [2019/10]FACILITY FOR PRODUCING A COMPOSITE MATERIAL COMPRISING CARBON NANOTUBES, AND METHOD FOR IMPLEMENTING SAID FACILITY
[2020/48]
StatusNo opposition filed within time limit
Status updated on  21.01.2022
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  12.02.2021
FormerGrant of patent is intended
Status updated on  27.10.2020
FormerRequest for examination was made
Status updated on  01.02.2019
FormerThe international publication has been made
Status updated on  04.11.2017
Formerunknown
Status updated on  02.06.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Nawatechnologies
Avenue Louis Philibert Domaine du Petit Arbois
Technopole Arbois-Méditerranée
13100 Aix-En-Provence / FR
[2019/10]
Inventor(s)01 / DESCARPENTRIES, Jérémie
29 rue Juliette Adam
91190 Gif Sur Yvette / FR
 [2019/10]
Representative(s)Schmidt, Martin Peter
IXAS Conseil
22 avenue René Cassin
69009 Lyon / FR
[2021/11]
Former [2019/10]Schmidt, Martin Peter
IXAS Conseil
15, rue Emile Zola
69002 Lyon / FR
Application number, filing date17725310.125.04.2017
[2019/10]
WO2017FR50976
Priority number, dateFR2016005360625.04.2016         Original published format: FR 1653606
[2019/10]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2017187080
Date:02.11.2017
Language:FR
[2017/44]
Type: A1 Application with search report 
No.:EP3448809
Date:06.03.2019
Language:FR
The application published by WIPO in one of the EPO official languages on 02.11.2017 takes the place of the publication of the European patent application.
[2019/10]
Type: B1 Patent specification 
No.:EP3448809
Date:17.03.2021
Language:FR
[2021/11]
Search report(s)International search report - published on:EP02.11.2017
ClassificationIPC:C01B32/164, B01J4/00
[2019/10]
CPC:
C01B32/164 (EP,US); B01J19/14 (US); B01J19/1875 (US);
B01J8/004 (US); B01J2219/00085 (US); B01J2219/00162 (US);
B01J2219/00164 (US); C01B2202/08 (US); C01B2202/36 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/10]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ANLAGE ZUR HERSTELLUNG EINES VERBUNDMATERIALS MIT KOHLENSTOFFNANORÖHRCHEN UND VERFAHREN ZUR DURCHFÜHRUNG DIESER ANLAGE[2019/10]
English:FACILITY FOR PRODUCING A COMPOSITE MATERIAL COMPRISING CARBON NANOTUBES AND METHOD FOR IMPLEMENTING SAID FACILITY[2020/48]
French:INSTALLATION POUR LA FABRICATION D'UN MATÉRIAU COMPOSITE COMPRENANT DES NANOTUBES DE CARBONE ET PROCÉDÉ DE MISE EN OEUVRE DE CETTE INSTALLATION[2020/48]
Former [2019/10]FACILITY FOR PRODUCING A COMPOSITE MATERIAL COMPRISING CARBON NANOTUBES, AND METHOD FOR IMPLEMENTING SAID FACILITY
Former [2019/10]INSTALLATION POUR LA FABRICATION D'UN MATÉRIAU COMPOSITE COMPRENANT DES NANOTUBES DE CARBONE, ET PROCÉDÉ DE MISE EN OEUVRE DE CETTE INSTALLATION
Entry into regional phase26.11.2018National basic fee paid 
26.11.2018Designation fee(s) paid 
26.11.2018Examination fee paid 
Examination procedure26.11.2018Examination requested  [2019/10]
26.11.2018Date on which the examining division has become responsible
28.05.2019Amendment by applicant (claims and/or description)
28.10.2020Communication of intention to grant the patent
04.02.2021Fee for grant paid
04.02.2021Fee for publishing/printing paid
04.02.2021Receipt of the translation of the claim(s)
Opposition(s)20.12.2021No opposition filed within time limit [2022/08]
Fees paidRenewal fee
30.04.2019Renewal fee patent year 03
30.04.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.04.2017
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
MT17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
TR17.03.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
[2024/42]
Former [2024/29]HU25.04.2017
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
TR17.03.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2024/22]HU25.04.2017
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2023/33]HU25.04.2017
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2023/30]AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/34]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/23]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE25.04.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/21]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE25.04.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/11]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/10]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/08]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
LU25.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/07]AL17.03.2021
AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
LU25.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/04]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
LU25.04.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/52]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/51]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/50]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2021/48]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/46]AT17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/38]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/37]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/36]FI17.03.2021
HR17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/35]FI17.03.2021
HR17.03.2021
NO17.06.2021
Former [2021/33]FI17.03.2021
NO17.06.2021
Cited inInternational search[A]US7160531  (JACQUES DAVID N [US], et al) [A] 1-18 * figure 1 ** column 7, line 30 - column 8, line 24 *;
 [Y]EP2397441  (ZEON CORP [JP], et al) [Y] 7,9 * paragraph [0087] - paragraph [0091] * * figure 2 *;
 [XAYI]US2011318256  (NAKAYAMA YOSHIKAZU [JP], et al) [X] 1-4,13,17 * figure 2 * * paragraph [0063] - paragraph [0065]; claims 1, 7 * [A] 6,10-12,14-16 [Y] 5,7,9 [I] 8,18;
 [A]WO2013059506  (APPLIED NANOSTRUCTURED SOLS [US]) [A] 1-18 * paragraphs [0093] , [ 00105] *;
 [YA]US2013189432  (NAKASHIMA EIJI [JP]) [Y] 5 * claims 1-5 * * figures 1-9B * * paragraph [0031] * * paragraph [0040] * [A] 1,6,13;
 [A]  - YASUDA S ET AL, "Improved and large area single-walled carbon nanotube forest growth by controlling the gas flow direction", ACS NANO, AMERICAN CHEMICAL SOCIETY USA, (20091222), vol. 3, no. 12, doi:10.1021/NN9007302, pages 4164 - 4170, XP002765859 [A] 1,5,13 * figure 2 * * page 4166, colonne de droite *

DOI:   http://dx.doi.org/10.1021/NN9007302
by applicantEP2397441
 US2011318256
 US2013189432
 FR3013061
    - HU ET AL., "3-omega measurements of vertically oriented carbon nanotubes on silicon", J. HEAT TRANSF, (2006), vol. 128, pages 1109 - 1113
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.