blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3466182

EP3466182 - RACH COMBINING ACROSS MULTIPLE ATTEMPTS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.12.2022
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  21.01.2022
FormerGrant of patent is intended
Status updated on  04.10.2021
FormerExamination is in progress
Status updated on  09.05.2020
FormerRequest for examination was made
Status updated on  08.03.2019
FormerThe international publication has been made
Status updated on  08.12.2017
Formerunknown
Status updated on  15.06.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
[2019/15]
Inventor(s)01 / ISLAM, Muhammad Nazmul
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
02 / LI, Junyi
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
03 / SUBRAMANIAN, Sundar
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
04 / CEZANNE, Juergen
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
05 / ABEDINI, Navid
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
06 / LUO, Tao
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
 [2019/15]
Representative(s)Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2022/08]
Former [2019/15]Wegner, Hans
Bardehle Pagenberg Partnerschaft mbB
Patentanwälte, Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
Application number, filing date17727986.615.05.2017
[2019/15]
WO2017US32725
Priority number, dateUS201662343415P31.05.2016         Original published format: US 201662343415 P
US20161536018123.11.2016         Original published format: US201615360181
[2019/15]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2017209935
Date:07.12.2017
Language:EN
[2017/49]
Type: A2 Application without search report 
No.:EP3466182
Date:10.04.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 07.12.2017 takes the place of the publication of the European patent application.
[2019/15]
Type: B1 Patent specification 
No.:EP3466182
Date:23.02.2022
Language:EN
[2022/08]
Search report(s)International search report - published on:EP08.02.2018
ClassificationIPC:H04W74/08, H04W72/04, H04W52/00, H04B7/0408, H04W56/00
[2021/42]
CPC:
H04W74/0833 (EP,US); H04B7/0408 (EP,US); H04B7/06966 (EP);
H04L5/0048 (US); H04W24/10 (US); H04W52/18 (US);
H04W52/242 (US); H04W52/245 (US); H04W52/246 (US);
H04W52/365 (US); H04W52/367 (US); H04W52/42 (US);
H04W56/001 (EP,US); H04B2001/0416 (US); H04B7/02 (US);
H04B7/088 (US); H04W52/00 (EP,US); H04W72/046 (EP,US) (-)
Former IPC [2019/15]H04W74/08, H04B7/08, H04W72/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/15]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:RACH-KOMBINATION ÜBER MEHRERE VERSUCHE[2019/15]
English:RACH COMBINING ACROSS MULTIPLE ATTEMPTS[2019/15]
French:COMBINAISON RACH SUR DE MULTIPLES TENTATIVES[2019/15]
Entry into regional phase13.11.2018National basic fee paid 
13.11.2018Designation fee(s) paid 
13.11.2018Examination fee paid 
Examination procedure13.11.2018Examination requested  [2019/15]
13.11.2018Date on which the examining division has become responsible
04.07.2019Amendment by applicant (claims and/or description)
13.05.2020Despatch of a communication from the examining division (Time limit: M04)
05.08.2020Reply to a communication from the examining division
05.10.2021Communication of intention to grant the patent
14.01.2022Fee for grant paid
14.01.2022Fee for publishing/printing paid
14.01.2022Receipt of the translation of the claim(s)
Opposition(s)24.11.2022No opposition filed within time limit [2023/05]
Fees paidRenewal fee
15.05.2019Renewal fee patent year 03
30.03.2020Renewal fee patent year 04
11.05.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.05.2017
AL23.02.2022
AT23.02.2022
CY23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
MK23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
TR23.02.2022
IE15.05.2022
LU15.05.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
IS23.06.2022
PT23.06.2022
[2024/29]
Former [2024/22]HU15.05.2017
AL23.02.2022
AT23.02.2022
CY23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
MK23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
IE15.05.2022
LU15.05.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
IS23.06.2022
PT23.06.2022
Former [2024/20]HU15.05.2017
AL23.02.2022
AT23.02.2022
CY23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
IE15.05.2022
LU15.05.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
IS23.06.2022
PT23.06.2022
Former [2024/18]HU15.05.2017
AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
IE15.05.2022
LU15.05.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
IS23.06.2022
PT23.06.2022
Former [2023/35]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
IE15.05.2022
LU15.05.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
IS23.06.2022
PT23.06.2022
Former [2023/25]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
IE15.05.2022
LU15.05.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
IS23.06.2022
PT23.06.2022
Former [2023/20]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
IE15.05.2022
LU15.05.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
CH31.05.2022
LI31.05.2022
IS23.06.2022
PT23.06.2022
Former [2023/10]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
LU15.05.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
CH31.05.2022
LI31.05.2022
IS23.06.2022
PT23.06.2022
Former [2023/09]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SK23.02.2022
SM23.02.2022
LU15.05.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
CH31.05.2022
LI31.05.2022
IS23.06.2022
PT23.06.2022
Former [2023/08]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SK23.02.2022
SM23.02.2022
LU15.05.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2023/06]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2023/01]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/49]AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/48]AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/47]AT23.02.2022
DK23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/46]AT23.02.2022
DK23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RS23.02.2022
SE23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/42]AT23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RS23.02.2022
SE23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/39]AT23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RS23.02.2022
SE23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
PT23.06.2022
Former [2022/36]AT23.02.2022
ES23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RS23.02.2022
SE23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
PT23.06.2022
Former [2022/35]ES23.02.2022
HR23.02.2022
LT23.02.2022
NL23.02.2022
RS23.02.2022
SE23.02.2022
BG23.05.2022
NO23.05.2022
PT23.06.2022
Former [2022/34]ES23.02.2022
LT23.02.2022
NL23.02.2022
NO23.05.2022
PT23.06.2022
Former [2022/33]LT23.02.2022
NO23.05.2022
Cited inInternational search[I]US2015359005  (WONG SHIN HORNG [GB], et al) [I] 14-16,29,30 * paragraph [0081] - paragraph [0087] * * paragraph [0092] - paragraph [0093] *;
 [XI]US2016119038  (THOMAS TIMOTHY [US], et al) [X] 1,2,9-13,17,18,24-28 * paragraphs [0009] , [0012] * * paragraph [0046] - paragraph [0048] * * paragraph [0058] - paragraph [0059]; figure 8 * [I] 3-8,19-23;
 [XI]  - JEONG CHEOL ET AL, "Random access in millimeter-wave beamforming cellular networks: issues and approaches", IEEE COMMUNICATIONS MAGAZINE, IEEE SERVICE CENTER, PISCATAWAY, US, vol. 53, no. 1, doi:10.1109/MCOM.2015.7010532, ISSN 0163-6804, (20150101), pages 180 - 185, (20150114), XP011570628 [X] 1,2,9-13,17,18,24-28 * page 182, column l, lines 16-35; figure 2 * * page 184, column l, paragraph l - column r * [I] 3-8,19-23

DOI:   http://dx.doi.org/10.1109/MCOM.2015.7010532
 [A]  - LG ELECTRONICS INC, "RACH Soft Combining", 3GPP DRAFT; R1- 074979, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20071104), vol. RAN WG1, no. Korea; 20071104, XP050108021 [A] 1-13,17-28 * page 1 * * page 3, section "Detecton method" *
 [I]  - FUJITSU, "The impacts on RAR caused by preamble repetition", vol. RAN WG1, no. Belgrade, Serbia; 20150420 - 20150424, (20150410), 3GPP DRAFT; R1-151565-THE IMPACTS ON RAR CAUSED BY PREAMBLE REPETITION-FINAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS C, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_80b/Docs/, (20150410), XP050949521 [I] 14-16,29,30 * page 2, example 2 *
 [XP]  - QUALCOMM INCORPORATED, "4-step RACH procedure consideration", vol. RAN WG1, no. Spokane, USA; 20170116 - 20170120, (20170110), 3GPP DRAFT; R1-1700791 4-STEP RACH PROCEDURE CONSIDERATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_AH/NR_AH_1701/Docs/, (20170110), XP051203106 [XP] 14-16,29,30 * page 8, paragraph 3 * * page 8, "Proposal 5" *
Examination   - LENOVO, "Random Access Procedure for NB-IoT", vol. RAN WG1, no. St Julian's, Malta; 20160215 - 20160219, (20160206), 3GPP DRAFT; R1-161009, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_84/Docs/, (20160206), XP051064491
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.