EP3622765 - RESOURCE CONFIGURATIONS AND SCHEDULING OF DIRECT TRANSMISSIONS IN MULTI-NETWORK ENVIRONMENTS [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 13.11.2020 Database last updated on 19.10.2024 | |
Former | Request for examination was made Status updated on 14.02.2020 | ||
Former | The international publication has been made Status updated on 16.11.2018 | ||
Former | unknown Status updated on 28.06.2017 | Most recent event Tooltip | 18.03.2024 | New entry: Reply to examination report | Applicant(s) | For all designated states BlackBerry Limited 2200 University Avenue East Waterloo, Ontario N2K 0A7 / CA | [2020/12] | Inventor(s) | 01 /
FAURIE, Rene c/o BlackBerry 2200 University Avenue East Waterloo, Ontario N2K 0A7 / CA | 02 /
BARRETT, Stephen John 28 Lincoln Wood Haywards Heath Sussex RH16 1LH / GB | 03 /
VUTUKURI, Eswar 24 Japonica Way Havant Hampshire PO9 2FN / GB | 04 /
YOUNG, Gordon Peter 72 Rugby Road Leamington Spa Warwickshire CV32 6DG / GB | [N/P] |
Former [2020/12] | 01 /
FAURIE, Rene Immeuble Le Colisee 10/12 avenue de l'Arche 92419 Courbevoie / FR | ||
02 /
BARRETT, Stephen John 28 Lincoln Wood Haywards Heath Sussex RH16 1LH / GB | |||
03 /
VUTUKURI, Eswar 24 Japonica Way Havant Hampshire PO9 2FN / GB | |||
04 /
YOUNG, Gordon Peter 72 Rugby Road Leamington Spa Warwickshire CV32 6DG / GB | Representative(s) | Murgitroyd & Company 165-169 Scotland Street Glasgow G5 8PL / GB | [N/P] |
Former [2020/12] | Santarelli 49, avenue des Champs-Elysées 75008 Paris / FR | Application number, filing date | 17730921.8 | 10.05.2017 | [2020/12] | WO2017IB00709 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018206992 | Date: | 15.11.2018 | Language: | EN | [2018/46] | Type: | A1 Application with search report | No.: | EP3622765 | Date: | 18.03.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.11.2018 takes the place of the publication of the European patent application. | [2020/12] | Search report(s) | International search report - published on: | EP | 15.11.2018 | Classification | IPC: | H04W72/12 | [2020/12] | CPC: |
H04W76/14 (EP,US);
H04W72/0453 (US);
H04L5/0053 (US);
H04W4/70 (US);
H04W72/12 (EP,US);
H04W72/23 (US);
H04W4/44 (US);
H04W4/46 (US);
H04W88/02 (US);
H04W88/08 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/12] | Title | German: | RESSOURCENKONFIGURATIONEN UND PLANUNG VON DIREKTÜBERTRAGUNGEN IN MULTINETZWERKUMGEBUNGEN | [2020/12] | English: | RESOURCE CONFIGURATIONS AND SCHEDULING OF DIRECT TRANSMISSIONS IN MULTI-NETWORK ENVIRONMENTS | [2020/12] | French: | CONFIGURATIONS DE RESSOURCES ET PROGRAMMATION D'ÉMISSIONS DIRECTES DANS DES ENVIRONNEMENTS MULTI-RÉSEAUX | [2020/12] | Entry into regional phase | 28.10.2019 | National basic fee paid | 28.10.2019 | Designation fee(s) paid | 28.10.2019 | Examination fee paid | Examination procedure | 28.10.2019 | Amendment by applicant (claims and/or description) | 28.10.2019 | Examination requested [2020/12] | 28.10.2019 | Date on which the examining division has become responsible | 13.11.2020 | Despatch of a communication from the examining division (Time limit: M04) | 23.03.2021 | Reply to a communication from the examining division | 20.01.2022 | Despatch of a communication from the examining division (Time limit: M06) | 28.07.2022 | Reply to a communication from the examining division | 25.01.2024 | Despatch of a communication from the examining division (Time limit: M04) | 15.03.2024 | Reply to a communication from the examining division | Fees paid | Renewal fee | 28.10.2019 | Renewal fee patent year 03 | 27.05.2020 | Renewal fee patent year 04 | 27.05.2021 | Renewal fee patent year 05 | 27.05.2022 | Renewal fee patent year 06 | 30.05.2023 | Renewal fee patent year 07 | 12.03.2024 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [XAY]EP2161962 (TELIASONERA AB [SE]) [X] 1-3,6,10-12,17,19,20 * paragraphs [0007] , [0014] , [0015] , [0030] , [0031]; figures 1,5 * [A] 14,15 [Y] 4,5,7-9,13,16,18; | [Y]EP3101969 (ZTE CORP [CN]) [Y] 13,16* paragraphs [0013] , [0014] *; | [Y] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on LTE-based V2X Services; (Release 14)", 3GPP STANDARD; 3GPP TR 36.885, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20160720), vol. RAN WG1, no. V14.0.0, pages 1 - 216, XP051123077 [Y] 4,5,7-9,18 * paragraphs [0001] , [0004] , [0005] * |