EP3465937 - METHOD, NETWORK DEVICE AND TERMINAL DEVICE IN A BEAM-BASED MMWAVE COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.08.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 11.09.2020 | ||
Former | Grant of patent is intended Status updated on 03.06.2020 | ||
Former | Examination is in progress Status updated on 07.12.2019 | ||
Former | Request for examination was made Status updated on 08.03.2019 | ||
Former | The international publication has been made Status updated on 08.12.2017 | ||
Former | unknown Status updated on 05.07.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Alcatel Lucent Site Nokia Paris Saclay Route de Villejust 91620 Nozay / FR | [2019/15] | Inventor(s) | 01 /
SUN, Huan 388 Ningqiao RD Pudong Jinqiao Shanghai 201206 / CN | [2019/15] | Representative(s) | DREISS Patentanwälte PartG mbB Friedrichstraße 6 70174 Stuttgart / DE | [2019/15] | Application number, filing date | 17732556.0 | 17.05.2017 | [2019/15] | WO2017IB00752 | Priority number, date | CN201610375044 | 31.05.2016 Original published format: CN201610375044 | [2019/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017208071 | Date: | 07.12.2017 | Language: | EN | [2017/49] | Type: | A1 Application with search report | No.: | EP3465937 | Date: | 10.04.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.12.2017 takes the place of the publication of the European patent application. | [2019/15] | Type: | B1 Patent specification | No.: | EP3465937 | Date: | 14.10.2020 | Language: | EN | [2020/42] | Search report(s) | International search report - published on: | EP | 07.12.2017 | Classification | IPC: | H04B7/06, H04B7/08, H04W72/04, H04W74/00 | [2020/24] | CPC: |
H04W76/19 (EP,US);
H04W72/046 (EP,CN,KR,US);
H04B7/043 (CN,US);
H04B7/0695 (EP,KR);
H04B7/088 (EP,KR);
H04W16/28 (KR);
H04W36/304 (EP,CN,KR,US);
H04W72/04 (US);
H04W72/0446 (CN);
H04W72/53 (KR);
H04W72/542 (KR);
H04W74/085 (EP);
H04W8/02 (US)
(-)
|
Former IPC [2019/15] | H04B7/06, H04B7/08, H04W72/04, H04W76/02, H04W74/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN, NETZWERKVORRICHTUNG UND ENDGERÄTEVORRICHTUNG IN EINEM STRAHLBASIERTEN MMWAVE-KOMMUNIKATIONSSYSTEM | [2019/15] | English: | METHOD, NETWORK DEVICE AND TERMINAL DEVICE IN A BEAM-BASED MMWAVE COMMUNICATION SYSTEM | [2019/15] | French: | PROCÉDÉ, DISPOSITIF DE RÉSEAU ET DISPOSITIF DE TERMINAL DANS UN SYSTÈME DE COMMUNICATION À ONDES MILLIMÉTRIQUES BASÉ SUR UN FAISCEAU | [2019/15] | Entry into regional phase | 05.12.2018 | National basic fee paid | 05.12.2018 | Designation fee(s) paid | 05.12.2018 | Examination fee paid | Examination procedure | 05.12.2018 | Amendment by applicant (claims and/or description) | 05.12.2018 | Examination requested [2019/15] | 05.12.2018 | Date on which the examining division has become responsible | 11.12.2019 | Despatch of a communication from the examining division (Time limit: M06) | 27.04.2020 | Reply to a communication from the examining division | 04.06.2020 | Communication of intention to grant the patent | 03.09.2020 | Fee for grant paid | 03.09.2020 | Fee for publishing/printing paid | 03.09.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 15.07.2021 | No opposition filed within time limit [2021/38] | Fees paid | Renewal fee | 15.05.2019 | Renewal fee patent year 03 | 14.05.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.05.2017 | AL | 14.10.2020 | AT | 14.10.2020 | CY | 14.10.2020 | CZ | 14.10.2020 | DK | 14.10.2020 | EE | 14.10.2020 | FI | 14.10.2020 | HR | 14.10.2020 | LT | 14.10.2020 | LV | 14.10.2020 | MC | 14.10.2020 | MK | 14.10.2020 | MT | 14.10.2020 | RO | 14.10.2020 | RS | 14.10.2020 | SE | 14.10.2020 | SI | 14.10.2020 | SK | 14.10.2020 | SM | 14.10.2020 | BG | 14.01.2021 | NO | 14.01.2021 | GR | 15.01.2021 | IS | 14.02.2021 | PT | 15.02.2021 | LU | 17.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | [2024/42] |
Former [2024/22] | HU | 17.05.2017 | |
AL | 14.10.2020 | ||
AT | 14.10.2020 | ||
CY | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
MK | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
LU | 17.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/33] | HU | 17.05.2017 | |
AL | 14.10.2020 | ||
AT | 14.10.2020 | ||
CY | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
LU | 17.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/30] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CY | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
LU | 17.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
LU | 17.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/23] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
LU | 17.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/10] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
PT | 15.02.2021 | ||
LU | 17.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/09] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
LU | 17.05.2021 | ||
Former [2022/07] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/50] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/45] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/37] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/36] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/35] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/33] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/32] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LV | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/28] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LV | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/25] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
LV | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/23] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
LV | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
PT | 15.02.2021 | ||
Former [2021/22] | FI | 14.10.2020 | |
RS | 14.10.2020 | ||
NO | 14.01.2021 | ||
PT | 15.02.2021 | ||
Former [2021/21] | FI | 14.10.2020 | |
PT | 15.02.2021 | ||
Former [2021/20] | FI | 14.10.2020 |