blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3465937

EP3465937 - METHOD, NETWORK DEVICE AND TERMINAL DEVICE IN A BEAM-BASED MMWAVE COMMUNICATION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.08.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  11.09.2020
FormerGrant of patent is intended
Status updated on  03.06.2020
FormerExamination is in progress
Status updated on  07.12.2019
FormerRequest for examination was made
Status updated on  08.03.2019
FormerThe international publication has been made
Status updated on  08.12.2017
Formerunknown
Status updated on  05.07.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Alcatel Lucent
Site Nokia Paris Saclay
Route de Villejust
91620 Nozay / FR
[2019/15]
Inventor(s)01 / SUN, Huan
388 Ningqiao RD
Pudong Jinqiao
Shanghai 201206 / CN
 [2019/15]
Representative(s)DREISS Patentanwälte PartG mbB
Friedrichstraße 6
70174 Stuttgart / DE
[2019/15]
Application number, filing date17732556.017.05.2017
[2019/15]
WO2017IB00752
Priority number, dateCN20161037504431.05.2016         Original published format: CN201610375044
[2019/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017208071
Date:07.12.2017
Language:EN
[2017/49]
Type: A1 Application with search report 
No.:EP3465937
Date:10.04.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 07.12.2017 takes the place of the publication of the European patent application.
[2019/15]
Type: B1 Patent specification 
No.:EP3465937
Date:14.10.2020
Language:EN
[2020/42]
Search report(s)International search report - published on:EP07.12.2017
ClassificationIPC:H04B7/06, H04B7/08, H04W72/04, H04W74/00
[2020/24]
CPC:
H04W76/19 (EP,US); H04W72/046 (EP,CN,KR,US); H04B7/043 (CN,US);
H04B7/0695 (EP,KR); H04B7/088 (EP,KR); H04W16/28 (KR);
H04W36/304 (EP,CN,KR,US); H04W72/04 (US); H04W72/0446 (CN);
H04W72/53 (KR); H04W72/542 (KR); H04W74/085 (EP);
H04W8/02 (US) (-)
Former IPC [2019/15]H04B7/06, H04B7/08, H04W72/04, H04W76/02, H04W74/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/15]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN, NETZWERKVORRICHTUNG UND ENDGERÄTEVORRICHTUNG IN EINEM STRAHLBASIERTEN MMWAVE-KOMMUNIKATIONSSYSTEM[2019/15]
English:METHOD, NETWORK DEVICE AND TERMINAL DEVICE IN A BEAM-BASED MMWAVE COMMUNICATION SYSTEM[2019/15]
French:PROCÉDÉ, DISPOSITIF DE RÉSEAU ET DISPOSITIF DE TERMINAL DANS UN SYSTÈME DE COMMUNICATION À ONDES MILLIMÉTRIQUES BASÉ SUR UN FAISCEAU[2019/15]
Entry into regional phase05.12.2018National basic fee paid 
05.12.2018Designation fee(s) paid 
05.12.2018Examination fee paid 
Examination procedure05.12.2018Amendment by applicant (claims and/or description)
05.12.2018Examination requested  [2019/15]
05.12.2018Date on which the examining division has become responsible
11.12.2019Despatch of a communication from the examining division (Time limit: M06)
27.04.2020Reply to a communication from the examining division
04.06.2020Communication of intention to grant the patent
03.09.2020Fee for grant paid
03.09.2020Fee for publishing/printing paid
03.09.2020Receipt of the translation of the claim(s)
Opposition(s)15.07.2021No opposition filed within time limit [2021/38]
Fees paidRenewal fee
15.05.2019Renewal fee patent year 03
14.05.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.05.2017
AL14.10.2020
AT14.10.2020
CY14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
MK14.10.2020
MT14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
LU17.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
[2024/42]
Former [2024/22]HU17.05.2017
AL14.10.2020
AT14.10.2020
CY14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
MK14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
LU17.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2023/33]HU17.05.2017
AL14.10.2020
AT14.10.2020
CY14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
LU17.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2023/30]AL14.10.2020
AT14.10.2020
CY14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
LU17.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/34]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
LU17.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/23]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
LU17.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/10]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
PT15.02.2021
LU17.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/09]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
LU17.05.2021
Former [2022/07]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
MC14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/50]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SI14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/45]AL14.10.2020
AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/37]AT14.10.2020
CZ14.10.2020
DK14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/36]AT14.10.2020
CZ14.10.2020
EE14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/35]AT14.10.2020
CZ14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
RO14.10.2020
RS14.10.2020
SE14.10.2020
SK14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/33]AT14.10.2020
FI14.10.2020
HR14.10.2020
LT14.10.2020
LV14.10.2020
RS14.10.2020
SE14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/32]AT14.10.2020
FI14.10.2020
HR14.10.2020
LV14.10.2020
RS14.10.2020
SE14.10.2020
SM14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/28]AT14.10.2020
FI14.10.2020
HR14.10.2020
LV14.10.2020
RS14.10.2020
SE14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/25]AT14.10.2020
FI14.10.2020
LV14.10.2020
RS14.10.2020
SE14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
IS14.02.2021
PT15.02.2021
Former [2021/23]AT14.10.2020
FI14.10.2020
LV14.10.2020
RS14.10.2020
SE14.10.2020
BG14.01.2021
NO14.01.2021
GR15.01.2021
PT15.02.2021
Former [2021/22]FI14.10.2020
RS14.10.2020
NO14.01.2021
PT15.02.2021
Former [2021/21]FI14.10.2020
PT15.02.2021
Former [2021/20]FI14.10.2020
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.