EP3482473 - METHOD FOR EQUALIZING STATES OF CHARGE OF A PLURALITY OF BATTERY MODULES OF A BATTERY, AND CORRESPONDING APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.04.2021 Database last updated on 07.06.2024 | |
Former | The patent has been granted Status updated on 08.05.2020 | ||
Former | Grant of patent is intended Status updated on 30.01.2020 | ||
Former | Request for examination was made Status updated on 12.04.2019 | ||
Former | The international publication has been made Status updated on 20.01.2018 | ||
Former | unknown Status updated on 14.07.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2019/20] | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
WEIL, Thomas Haselweg 2 71665 Vaihingen / DE | 02 /
MIELCAREK, Paul Rohrer Hoehe 20 70565 Stuttgart / DE | 03 /
BECK, Tobias Alexander Bronnaecker 9 70188 Stuttgart / DE | [2019/20] | Application number, filing date | 17735061.8 | 27.06.2017 | [2019/20] | WO2017EP65760 | Priority number, date | DE201610212564 | 11.07.2016 Original published format: DE102016212564 | [2019/20] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018010945 | Date: | 18.01.2018 | Language: | DE | [2018/03] | Type: | A1 Application with search report | No.: | EP3482473 | Date: | 15.05.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 18.01.2018 takes the place of the publication of the European patent application. | [2019/20] | Type: | B1 Patent specification | No.: | EP3482473 | Date: | 10.06.2020 | Language: | DE | [2020/24] | Search report(s) | International search report - published on: | EP | 18.01.2018 | Classification | IPC: | H02J7/00, H02J7/35, H02J3/32, H02J3/38 | [2019/20] | CPC: |
H02J7/0016 (EP,US);
H02J3/32 (EP,US);
H02J3/38 (US);
H02J3/381 (EP,US);
H02J7/0025 (EP,US);
H02J7/0048 (EP,US);
H02J7/35 (EP,US);
H02J2300/20 (EP,US);
H02J2300/22 (EP,US);
Y02E70/30 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUM AUSGLEICHEN VON LADEZUSTÄNDEN MEHRERER BATTERIEMODULE EINER BATTERIE UND ENTSPRECHENDE VORRICHTUNG | [2019/20] | English: | METHOD FOR EQUALIZING STATES OF CHARGE OF A PLURALITY OF BATTERY MODULES OF A BATTERY, AND CORRESPONDING APPARATUS | [2019/20] | French: | PROCÉDÉ D'ÉQUILIBRAGE D'ÉTATS DE CHARGE DE PLUSIEURS MODULES D'UNE BATTERIE ET DISPOSITIF CORRESPONDANT | [2019/20] | Entry into regional phase | 11.02.2019 | National basic fee paid | 11.02.2019 | Designation fee(s) paid | 11.02.2019 | Examination fee paid | Examination procedure | 11.02.2019 | Examination requested [2019/20] | 11.02.2019 | Date on which the examining division has become responsible | 24.07.2019 | Amendment by applicant (claims and/or description) | 31.01.2020 | Communication of intention to grant the patent | 24.04.2020 | Fee for grant paid | 24.04.2020 | Fee for publishing/printing paid | 24.04.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 11.03.2021 | No opposition filed within time limit [2021/20] | Fees paid | Renewal fee | 01.07.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.06.2017 | AL | 10.06.2020 | CY | 10.06.2020 | CZ | 10.06.2020 | DK | 10.06.2020 | EE | 10.06.2020 | ES | 10.06.2020 | FI | 10.06.2020 | HR | 10.06.2020 | IT | 10.06.2020 | LT | 10.06.2020 | LV | 10.06.2020 | MC | 10.06.2020 | MK | 10.06.2020 | MT | 10.06.2020 | NL | 10.06.2020 | PL | 10.06.2020 | RO | 10.06.2020 | RS | 10.06.2020 | SE | 10.06.2020 | SI | 10.06.2020 | SK | 10.06.2020 | SM | 10.06.2020 | TR | 10.06.2020 | IE | 27.06.2020 | LU | 27.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | LI | 30.06.2020 | BG | 10.09.2020 | NO | 10.09.2020 | GR | 11.09.2020 | IS | 10.10.2020 | PT | 12.10.2020 | [2022/33] |
Former [2022/27] | HU | 27.06.2017 | |
AL | 10.06.2020 | ||
CY | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
MT | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
TR | 10.06.2020 | ||
IE | 27.06.2020 | ||
LU | 27.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/24] | AL | 10.06.2020 | |
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
IE | 27.06.2020 | ||
LU | 27.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/20] | AL | 10.06.2020 | |
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
IE | 27.06.2020 | ||
LU | 27.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/18] | AL | 10.06.2020 | |
CZ | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
LU | 27.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/15] | AL | 10.06.2020 | |
CZ | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
LU | 27.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/10] | AL | 10.06.2020 | |
CZ | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/09] | AL | 10.06.2020 | |
CZ | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
PT | 12.10.2020 | ||
Former [2021/04] | AL | 10.06.2020 | |
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2021/01] | FI | 10.06.2020 | |
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2020/51] | FI | 10.06.2020 | |
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2020/50] | FI | 10.06.2020 | |
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
SE | 10.06.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2020/48] | FI | 10.06.2020 | |
LT | 10.06.2020 | ||
SE | 10.06.2020 | ||
NO | 10.09.2020 | ||
Former [2020/47] | LT | 10.06.2020 | |
NO | 10.09.2020 | Cited in | International search | [XI]EP2083494 (PANASONIC CORP [JP]) [X] 1,12 * paragraph [0024] - paragraph [0115]; figures 1-8 * [I] 2-11; | [A]EP2418754 (TOSHIBA KK [JP]) [A] 1-12* paragraph [0009] - paragraph [0079]; figures 1-7 *; | [A]US2014067151 (ERHART DAVID [US], et al) [A] 1-12 * paragraph [0010] - paragraph [0180]; figures 1-18 *; | [XI]US2014145678 (HWANG EUI-JEONG [KR]) [X] 1,12 * paragraph [0006] - paragraph [0120]; figures 1-6 * [I] 2-11 | by applicant | US2011121785 | JP2013094033 |