EP3490906 - CAPSULE AND BEVERAGE PRODUCTION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.04.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 01.05.2020 | ||
Former | Grant of patent is intended Status updated on 07.01.2020 | ||
Former | Request for examination was made Status updated on 03.05.2019 | ||
Former | The international publication has been made Status updated on 03.02.2018 | ||
Former | unknown Status updated on 14.07.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Société des Produits Nestlé S.A. Entre-deux-Villes 1800 Vevey / CH | [2019/28] |
Former [2019/23] | For all designated states Nestec S.A. Avenue Nestlé 55 1800 Vevey / CH | Inventor(s) | 01 /
OZANNE, Matthieu 960 Avenue de Savoie 74500 Publier / FR | 02 /
MARTIN, Olivier Ch. de Venel 11 1350 Orbe / CH | [2019/23] | Representative(s) | Ducreux, Marie Société des Produits Nestlé S.A. Avenue Nestlé 55 1800 Vevey / CH | [2020/23] |
Former [2019/23] | Ducreux, Marie Nestec S.A. Avenue Nestlé 55 1800 Vevey / CH | Application number, filing date | 17735179.8 | 11.07.2017 | [2019/23] | WO2017EP67364 | Priority number, date | EP20160181224 | 26.07.2016 Original published format: EP 16181224 | [2019/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018019568 | Date: | 01.02.2018 | Language: | EN | [2018/05] | Type: | A1 Application with search report | No.: | EP3490906 | Date: | 05.06.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.02.2018 takes the place of the publication of the European patent application. | [2019/23] | Type: | B1 Patent specification | No.: | EP3490906 | Date: | 03.06.2020 | Language: | EN | [2020/23] | Search report(s) | International search report - published on: | EP | 01.02.2018 | Classification | IPC: | B65D85/804 | [2019/23] | CPC: |
B65D85/8043 (EP,US);
B65D85/8055 (KR);
A23F3/18 (KR);
A47J31/3633 (EP,KR)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/23] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KAPSEL UND GETRÄNKEHERSTELLUNGSSYSTEM | [2019/23] | English: | CAPSULE AND BEVERAGE PRODUCTION SYSTEM | [2019/23] | French: | CAPSULE ET SYSTÈME DE PRODUCTION DE BOISSON | [2020/02] |
Former [2019/23] | CAPSULE ET SYSTÈME DE PRODUCTION DE BOISSONS | Entry into regional phase | 26.02.2019 | National basic fee paid | 26.02.2019 | Designation fee(s) paid | 26.02.2019 | Examination fee paid | Examination procedure | 26.02.2019 | Examination requested [2019/23] | 26.02.2019 | Date on which the examining division has become responsible | 08.01.2020 | Communication of intention to grant the patent | 27.04.2020 | Receipt of the translation of the claim(s) | 28.04.2020 | Fee for grant paid | 28.04.2020 | Fee for publishing/printing paid | Opposition(s) | 04.03.2021 | No opposition filed within time limit [2021/19] | Fees paid | Renewal fee | 15.07.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.07.2017 | AL | 03.06.2020 | CY | 03.06.2020 | CZ | 03.06.2020 | DK | 03.06.2020 | EE | 03.06.2020 | ES | 03.06.2020 | FI | 03.06.2020 | HR | 03.06.2020 | IT | 03.06.2020 | LT | 03.06.2020 | LV | 03.06.2020 | MC | 03.06.2020 | MK | 03.06.2020 | MT | 03.06.2020 | PL | 03.06.2020 | RO | 03.06.2020 | RS | 03.06.2020 | SE | 03.06.2020 | SI | 03.06.2020 | SK | 03.06.2020 | SM | 03.06.2020 | TR | 03.06.2020 | IE | 11.07.2020 | LU | 11.07.2020 | BG | 03.09.2020 | NO | 03.09.2020 | GR | 04.09.2020 | IS | 03.10.2020 | PT | 06.10.2020 | [2022/33] |
Former [2022/27] | HU | 11.07.2017 | |
AL | 03.06.2020 | ||
CY | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
MT | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
TR | 03.06.2020 | ||
IE | 11.07.2020 | ||
LU | 11.07.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/37] | AL | 03.06.2020 | |
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
IE | 11.07.2020 | ||
LU | 11.07.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/24] | AL | 03.06.2020 | |
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
LU | 11.07.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/20] | AL | 03.06.2020 | |
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
LU | 11.07.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/18] | AL | 03.06.2020 | |
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/10] | AL | 03.06.2020 | |
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/09] | AL | 03.06.2020 | |
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
PT | 06.10.2020 | ||
Former [2021/04] | AL | 03.06.2020 | |
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2021/01] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/51] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/50] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/48] | FI | 03.06.2020 | |
LT | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
Former [2020/47] | LT | 03.06.2020 | |
NO | 03.09.2020 | Cited in | International search | [A]WO2005092160 (ILLYCAFFE SPA [IT], et al) [A] 1-17 * the whole document *; | [A]WO2008025730 (NESTEC SA [CH], et al) [A] 1-17 * the whole document *; | [AD]WO2011144479 (NESTEC SA [CH], et al) [AD] 1-17 * the whole document *; | [A]US2013139699 (RIVERA ADRIAN [US]) [A] 1-17* the whole document *; | [A]WO2015136433 (SARONG SPA [IT]) [A] 1-17 * the whole document * | by applicant | WO2007042414 | WO2007134960 | EP1950150 | EP2033551 | WO2010146101 | WO2011144479 | WO2015032651 |