blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3622619

EP3622619 - ELECTRIC SHORT-CIRCUIT DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.12.2021
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  15.01.2021
FormerGrant of patent is intended
Status updated on  01.10.2020
FormerRequest for examination was made
Status updated on  14.02.2020
FormerThe international publication has been made
Status updated on  12.01.2019
Formerunknown
Status updated on  27.07.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Siemens Energy Global GmbH & Co. KG
Otto-Hahn-Ring 6
81739 München / DE
[2021/04]
Former [2020/12]For all designated states
Siemens Aktiengesellschaft
Werner-von-Siemens-Straße 1
80333 München / DE
Inventor(s)01 / STAHLHUT, Nils
Schulstrasse 15
91341 Röttenbach / DE
 [2020/12]
Application number, filing date17739947.407.07.2017
[2020/12]
WO2017EP67105
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2019007532
Date:10.01.2019
Language:DE
[2019/02]
Type: A1 Application with search report 
No.:EP3622619
Date:18.03.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 10.01.2019 takes the place of the publication of the European patent application.
[2020/12]
Type: B1 Patent specification 
No.:EP3622619
Date:17.02.2021
Language:DE
[2021/07]
Search report(s)International search report - published on:EP10.01.2019
ClassificationIPC:H02M1/32, H02H7/12, H02M7/483, H01H79/00
[2020/12]
CPC:
H01H79/00 (EP,KR,US); G01R31/281 (US); G01R31/52 (US);
H02H3/20 (US); H02M1/325 (EP,KR); H02M7/4835 (EP,KR,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/12]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ELEKTRISCHE KURZSCHLIESSEINRICHTUNG[2020/43]
English:ELECTRIC SHORT-CIRCUIT DEVICE[2020/12]
French:DISPOSITIF DE COURT-CIRCUIT ÉLECTRIQUE[2020/12]
Former [2020/12]ELEKTRISCHE KURZSCHLIEßEINRICHTUNG
Entry into regional phase11.12.2019National basic fee paid 
11.12.2019Designation fee(s) paid 
11.12.2019Examination fee paid 
Examination procedure11.12.2019Examination requested  [2020/12]
11.12.2019Date on which the examining division has become responsible
02.10.2020Communication of intention to grant the patent
07.01.2021Receipt of the translation of the claim(s)
08.01.2021Fee for grant paid
08.01.2021Fee for publishing/printing paid
Opposition(s)18.11.2021No opposition filed within time limit [2022/04]
Fees paidRenewal fee
13.12.2019Renewal fee patent year 03
20.07.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.07.2017
AL17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
IE07.07.2021
LU07.07.2021
BE31.07.2021
[2024/22]
Former [2023/33]HU07.07.2017
AL17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
IE07.07.2021
LU07.07.2021
BE31.07.2021
Former [2023/30]AL17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
IE07.07.2021
LU07.07.2021
BE31.07.2021
Former [2022/35]AL17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
IE07.07.2021
LU07.07.2021
BE31.07.2021
Former [2022/34]AL17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
LU07.07.2021
BE31.07.2021
Former [2022/23]AL17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
LU07.07.2021
Former [2022/18]AL17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/13]AL17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/10]AL17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/08]AL17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/07]AL17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/50]CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/49]CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/48]CZ17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/46]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/42]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/39]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/38]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/37]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/36]FI17.02.2021
HR17.02.2021
LT17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/35]FI17.02.2021
HR17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Former [2021/33]FI17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Cited inInternational search[A]JP2013169088  ;
 [A]DE202014104564U  (SMA SOLAR TECHNOLOGY AG [DE]) [A] 1-17 * paragraph [0034]; figure 1 * * paragraph [0015] *;
 [A]  - DATABASE WPI, 0, Derwent World Patents Index, vol. 1988, no. 18, Database accession no. 1988-124943, XP002779153 & SU1341690 A 19870304 (KAMSHNYI A N) [A] 1-17 * abstract *
 [A]  - DATABASE WPI, 0, Derwent World Patents Index, vol. 2013, no. 60, Database accession no. 2013-M77476, XP002779154 & JP2013169088 A 20130829 (HITACHI LTD) [A] 1-17 * abstract * * figures 4-7 *
 [A]  - GUANJUN DING ET AL, "New technologies of voltage source converter (VSC) for HVDC transmission system based on VSC", POWER AND ENERGY SOCIETY GENERAL MEETING - CONVERSION AND DELIVERY OF ELECTRICAL ENERGY IN THE 21ST CENTURY, 2008 IEEE, IEEE, PISCATAWAY, NJ, USA, (20080720), ISBN 978-1-4244-1905-0, pages 1 - 8, XP031304187 [A] 1-17 * III. Protection Measures of Submodule *
by applicantWO2011107363
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.