blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3494258

EP3494258 - TRACK-BUILDING CARRIAGE FOR RECEIVING AND/OR LAYING TRACK SECTIONS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.04.2021
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  15.05.2020
FormerGrant of patent is intended
Status updated on  06.02.2020
FormerRequest for examination was made
Status updated on  10.05.2019
FormerThe international publication has been made
Status updated on  10.02.2018
Formerunknown
Status updated on  01.08.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Plasser & Theurer Export von Bahnbaumaschinen GmbH
Johannesgasse 3
1010 Wien / AT
[2019/24]
Inventor(s)01 / STADLER, Lothar
Schätzgasse 4/6
1190 Wien / AT
02 / LINTZ, Gerard
77 Rue de la Gare
57803 Bening-les-Saint-Avold / FR
 [2020/10]
Former [2019/24]01 / STADLER, Lothar
Schätzgasse 4/6
1190 Wien / AT
02 / LINTZ Gerard
77 Rue de la Gare
57803 Bening-les-Saint-Avold / FR
Application number, filing date17742157.506.07.2017
[2019/24]
WO2017EP00797
Priority number, dateAT20160000195U03.08.2016         Original published format: AT 19516 U
[2019/24]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018024353
Date:08.02.2018
Language:DE
[2018/06]
Type: A1 Application with search report 
No.:EP3494258
Date:12.06.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 08.02.2018 takes the place of the publication of the European patent application.
[2019/24]
Type: B1 Patent specification 
No.:EP3494258
Date:17.06.2020
Language:DE
[2020/25]
Search report(s)International search report - published on:EP08.02.2018
ClassificationIPC:E01B29/02, B61D15/00, B61F1/08
[2020/04]
CPC:
E01B29/02 (EP,AT,EA,US); B61D15/00 (EP,AT); B61D3/16 (EP);
B61F1/08 (AT); B61F1/12 (EP); E01B29/00 (AT)
Former IPC [2019/24]E01B29/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/24]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:GLEISBAUWAGEN ZUM AUFNEHMEN UND/ODER VERLEGEN VON GLEISJOCHEN[2019/24]
English:TRACK-BUILDING CARRIAGE FOR RECEIVING AND/OR LAYING TRACK SECTIONS[2019/24]
French:VÉHICULE DE CONSTRUCTION DE VOIE FERRÉE DESTINÉ À RECEVOIR ET/OU À POSER DES SEGMENTS DE VOIE FERRÉE[2019/24]
Entry into regional phase04.03.2019National basic fee paid 
04.03.2019Designation fee(s) paid 
04.03.2019Examination fee paid 
Examination procedure04.03.2019Examination requested  [2019/24]
04.03.2019Date on which the examining division has become responsible
07.02.2020Communication of intention to grant the patent
11.05.2020Fee for grant paid
11.05.2020Fee for publishing/printing paid
11.05.2020Receipt of the translation of the claim(s)
Opposition(s)18.03.2021No opposition filed within time limit [2021/21]
Fees paidRenewal fee
31.07.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.07.2017
AL17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
IE06.07.2020
LU06.07.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
[2022/33]
Former [2022/27]HU06.07.2017
AL17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
IE06.07.2020
LU06.07.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/24]AL17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
IE06.07.2020
LU06.07.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/20]AL17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
IE06.07.2020
LU06.07.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/18]AL17.06.2020
CZ17.06.2020
EE17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/10]AL17.06.2020
CZ17.06.2020
EE17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/09]AL17.06.2020
CZ17.06.2020
EE17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/04]AL17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2021/01]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2020/51]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/50]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/48]FI17.06.2020
LT17.06.2020
SE17.06.2020
NO17.09.2020
Former [2020/47]LT17.06.2020
NO17.09.2020
Cited inInternational search[AD]AT324388B  (SCHEUCHZER FILS AUGUSTE [CH]) [AD] 1-6 * figures 1-11; claim 1 *;
 [A]EP0486456  (PLASSER BAHNBAUMASCH FRANZ [AT]) [A] 1-6* page 3, line 52 - page 4, line 42; figures 1-7 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.