EP3496865 - A FLUID FILLING NOZZLE, APPARATUS, AND METHOD OF FILLING A CONTAINER WITH A FLUID [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.05.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 29.05.2020 | ||
Former | Grant of patent is intended Status updated on 15.01.2020 | ||
Former | Request for examination was made Status updated on 17.05.2019 | ||
Former | The international publication has been made Status updated on 17.02.2018 | ||
Former | unknown Status updated on 09.08.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states The Procter & Gamble Company One Procter & Gamble Plaza Cincinnati, OH 45202 / US | [2019/25] | Inventor(s) | 01 /
QUAN, Ke-ming One Procter&Gamble Plaza Cincinnati, Ohio 45202 / US | 02 /
GOUDY, Eric, Shawn One Procter&Gamble Plaza Cincinnati, Ohio 45202 / US | [2019/25] | Representative(s) | P&G Patent Belgium UK N.V. Procter & Gamble Services Company S.A. Temselaan 100 1853 Strombeek-Bever / BE | [2020/27] |
Former [2019/25] | Peet, Jillian Wendy Procter & Gamble Technical Centres Limited Whitley Road Longbenton Newcastle upon Tyne NE12 9TS / GB | Application number, filing date | 17745933.6 | 19.07.2017 | [2019/25] | WO2017US42688 | Priority number, date | US201615230504 | 08.08.2016 Original published format: US201615230504 | [2019/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018031206 | Date: | 15.02.2018 | Language: | EN | [2018/07] | Type: | A1 Application with search report | No.: | EP3496865 | Date: | 19.06.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.02.2018 takes the place of the publication of the European patent application. | [2019/25] | Type: | B1 Patent specification | No.: | EP3496865 | Date: | 01.07.2020 | Language: | EN | [2020/27] | Search report(s) | International search report - published on: | EP | 15.02.2018 | Classification | IPC: | B05B1/26, B65B39/00, B67C3/26, B67C3/28, B65B3/36, B05B17/06 | [2019/51] | CPC: |
B65B39/001 (EP,US);
B05B17/0607 (US);
B05B17/063 (EP,US);
B65B3/12 (US);
B65B3/36 (EP,US);
B67C3/28 (EP,US);
B65B2210/08 (US)
(-)
|
Former IPC [2019/25] | B05B1/26, B65B39/00, B67C3/26, B67C3/28, B65B3/36 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/25] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FLUIDFÜLLDÜSE, VORRICHTUNG UND VERFAHREN ZUM FÜLLEN EINES BEHÄLTERS MIT EINEM FLUID | [2019/25] | English: | A FLUID FILLING NOZZLE, APPARATUS, AND METHOD OF FILLING A CONTAINER WITH A FLUID | [2019/25] | French: | BUSE DE REMPLISSAGE DE LIQUIDE, APPAREIL, ET PROCÉDÉ DE REMPLISSAGE D'UN RÉCIPIENT AU MOYEN D'UN LIQUIDE | [2019/25] | Entry into regional phase | 21.02.2019 | National basic fee paid | 21.02.2019 | Designation fee(s) paid | 21.02.2019 | Examination fee paid | Examination procedure | 21.02.2019 | Examination requested [2019/25] | 21.02.2019 | Date on which the examining division has become responsible | 16.01.2020 | Communication of intention to grant the patent | 21.05.2020 | Fee for grant paid | 21.05.2020 | Fee for publishing/printing paid | 21.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 06.04.2021 | No opposition filed within time limit [2021/23] | Fees paid | Renewal fee | 15.07.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.07.2017 | AL | 01.07.2020 | AT | 01.07.2020 | CY | 01.07.2020 | CZ | 01.07.2020 | DK | 01.07.2020 | EE | 01.07.2020 | ES | 01.07.2020 | FI | 01.07.2020 | HR | 01.07.2020 | IT | 01.07.2020 | LT | 01.07.2020 | LV | 01.07.2020 | MC | 01.07.2020 | MK | 01.07.2020 | MT | 01.07.2020 | NL | 01.07.2020 | PL | 01.07.2020 | RO | 01.07.2020 | RS | 01.07.2020 | SE | 01.07.2020 | SI | 01.07.2020 | SK | 01.07.2020 | SM | 01.07.2020 | TR | 01.07.2020 | IE | 19.07.2020 | LU | 19.07.2020 | BE | 31.07.2020 | CH | 31.07.2020 | LI | 31.07.2020 | BG | 01.10.2020 | NO | 01.10.2020 | GR | 02.10.2020 | IS | 01.11.2020 | PT | 02.11.2020 | [2022/33] |
Former [2022/27] | HU | 19.07.2017 | |
AL | 01.07.2020 | ||
AT | 01.07.2020 | ||
CY | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
MT | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
TR | 01.07.2020 | ||
IE | 19.07.2020 | ||
LU | 19.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/37] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
IE | 19.07.2020 | ||
LU | 19.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/36] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 19.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/28] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 19.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/25] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 19.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/23] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 19.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/22] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 19.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/20] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
LU | 19.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/18] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/17] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/11] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/09] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/08] | ES | 01.07.2020 | |
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/07] | FI | 01.07.2020 | |
LT | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
Former [2021/01] | BG | 01.10.2020 | Cited in | International search | [A]DE1123545 (BINDLER MASCHINENFABRIK GEB) [A] 1,3* the whole document *; | [A]US5105861 (BERGER JOERG [DE], et al) [A] 1-10 * the whole document *; | [A]US6377387 (DUTHALER GREGG M [US], et al) [A] 1-10 * the whole document *; | [A]US2008265055 (QUAN KE-MING [US], et al) [A] 1-10 * paragraphs [0064] - [0125]; figures 1,2 *; | [A]US2013206857 (IVRI YEHUDA [US]) [A] 1-10 * paragraphs [0108] - [0110] - [ 159] - [0161]; figures 1,5 * | by applicant | US7125828 | US7127874 | US2009199877 | US8656689 | US9233768 |